Contribuciones
[ AI/Cuestión: Q11/15 ] |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 1796 ]
|
Considerations on the evolution of Module Framer and DSP Framer Interfaces (MFI/DFI)
|
Huawei Technologies Co., Ltd.
|
Q11/15
|
2016-02-02 |
|
[ 1794 ]
|
Cascaded and nested protection
|
China Unicom
,
Huawei Technologies Co., Ltd.
|
Q9/15, Q11/15
|
2016-02-02 |
|
[ 1747 ]
|
Heterogeneous CPRI multiplexing using GFP
|
Microsemi Corporation
|
Q13/15, Q11/15
|
2016-02-02 |
|
[ 1746 ]
|
Recommendation for Mapping a FlexE Sub-Group into an ODUflex
|
Microsemi Corporation
|
Q13/15, Q11/15
|
2016-02-02 |
|
[ 1734 ]
|
FlexO frame & sub-frame alignment and markers
|
Inphi Corporation
|
Q11/15
|
2016-02-02 |
|
[ 1731 ]
|
400GBASE-R mapping into OPUflex
|
Inphi Corporation
|
Q11/15
|
2016-02-02 |
|
[ 1724 ]
|
Using Standard GFP-T to map CPRI clients into an ODU Carrier - Proposed addition to the draft CPRI-over-OTN Supplement
|
Coriant GmbH & Co. KG
,
Microsemi Corporation
|
Q13/15, Q11/15
|
2016-02-01 |
|
[ 1717 ]
|
Transporting CPRI Options 8-10 over OTN
|
Microsemi Corporation
|
Q13/15, Q11/15
|
2016-02-01 |
|
[ 1674 ]
|
Comment on draft G.872 Edition 4
|
Huawei Technologies Co., Ltd.
|
Q12/15, Q11/15
|
2016-02-01 |
|
[ 1673 ]
|
FlexO atomic functional model
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
|
Q11/15
|
2016-02-01 |
|
[ 1671 ]
|
Considerations of interconnection between FlexE and xGE
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
|
Q11/15
|
2016-02-01 |
|
[ 1670 ]
(Rev.1-2) |
FlexE aware mapping method 6B text proposal
|
Huawei Technologies Co., Ltd.
|
Q11/15
|
2016-02-01 |
|
[ 1669 ]
|
FlexE into ODUflex atomic functional model
|
Huawei Technologies Co., Ltd.
|
Q11/15
|
2016-02-01 |
|
[ 1667 ]
|
Consideration and proposed text on block definition for error performance
|
Fujitsu Limited
|
Q11/15
|
2016-02-01 |
|
[ 1666 ]
|
FlexE atomic functional model
|
Huawei Technologies Co., Ltd.
|
Q11/15, Q10/15
|
2016-02-01 |
|
[ 1665 ]
|
Introduction of FlexE related atomic functions and Characteristic Information naming
|
Huawei Technologies Co., Ltd.
|
Q11/15, Q10/15
|
2016-02-01 |
|
[ 1657 ]
|
Proposal to specify Module Framer Interfaces and DSP Framer Interfaces in a new G.709 supplement
|
Huawei Technologies Co., Ltd.
|
Q11/15
|
2016-02-01 |
|
[ 1649 ]
(Rev.1) |
Transporting CPRI clients with different clock sources
C-1649 Rev.1 adds Q13/15 as a destination Question. There is no change to the content of the Contribution.
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q13/15, Q11/15
|
2016-02-01 |
|
[ 1628 ]
|
Proposal to study OTN data plane pruning and refactoring
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
|
Q11/15
|
2016-02-01 |
|
[ 1627 ]
|
CPRI over OTN phase 2 extension
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
|
Q11/15
|
2016-02-01 |
|
[ 1626 ]
|
Transparency of mapping of CPRI into OTN phase 2
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
|
Q11/15
|
2016-02-01 |
|
[ 1624 ]
|
CPRI over OTN phase 2 application update
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
|
Q11/15
|
2016-02-01 |
|
[ 1615 ]
(Rev.1) |
Consideration and proposal on PTP event message in FlexO IrDI
C-1615 Rev.1 adds Q13/15 as a destination Question. There is no change to the content of the Contribution.
|
ZTE Corporation
|
Q13/15, Q11/15
|
2016-02-01 |
|
[ 1614 ]
|
Consideration and proposal on overhead format of FlexO
|
ZTE Corporation
|
Q11/15
|
2016-02-01 |
|
[ 1612 ]
|
Considerations on overhead of FlexE aware client mapping method
|
ZTE Corporation
|
Q11/15
|
2016-02-01 |
|
[ 1611 ]
(Rev.1) |
Frequency error test results - CPRI over ODU2r
C-1611 Rev.1 adds Q13/15 as a destination Question. There is no change to the content of the Contribution.
|
IP Light
|
Q13/15, Q11/15
|
2016-02-01 |
|
[ 1602 ]
|
The consideration of interworking between OTUC1 and OTU4
|
FiberHome Technologies Group
|
Q11/15
|
2016-02-01 |
|
[ 1600 ]
(Rev.1) |
The suggestion about multichannel parallel interfaces in B100G
C-1600 Rev.1 adds Q6/15 as a destination Question. There is no change to the content of the Contribution.
|
FiberHome Technologies Group
|
Q6/15, Q11/15
|
2016-02-01 |
|
[ 1592 ]
(Rev.1-2) |
Propose SG15 to start pre-research project on IMT2020 Mobile back haul and front haul network
|
Ministry of Industry and Information Technology (MIIT)
,
China Mobile Communications Corporation
|
Q6/15, Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15
|
2016-02-01 |
|
[ 1588 ]
|
Updated SDL diagrams for G.806
|
Fujitsu Limited
|
Q11/15
|
2016-02-01 |
|
[ 1584 ]
|
Update of G.709 Appendix VII
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2016-01-31 |
|
[ 1583 ]
|
Reconsideration of G.709 Appendix XII - OTLC.4 Structure
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2016-01-31 |
|
[ 1582 ]
|
New Ethernet Rates and impact on OTN standardization
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2016-01-31 |
|
[ 1574 ]
|
Proposed new material for media element in G.798
|
Coriant GmbH & Co. KG
,
ZTE Corporation
|
Q6/15, Q14/15, Q12/15, Q11/15
|
2016-01-29 |
|
[ 1573 ]
|
Proposed new material for OSC layer in G.798
|
Coriant GmbH & Co. KG
|
Q11/15
|
2016-01-29 |
|
[ 1572 ]
|
Proposed changes to clause 12/G.798
|
Coriant GmbH & Co. KG
|
Q11/15
|
2016-01-29 |
|
[ 1571 ]
|
Proposed changes to clause 11/G.798
|
Coriant GmbH & Co. KG
|
Q11/15
|
2016-01-29 |
|
[ 1570 ]
|
Proposed changes to clauses 9 and 10/G.798
|
Coriant GmbH & Co. KG
|
Q11/15
|
2016-01-29 |
|
[ 1569 ]
|
Proposed changes to clause 8/G.798
|
Coriant GmbH & Co. KG
|
Q11/15
|
2016-01-29 |
|
[ 1568 ]
|
Proposed changes to G.798 clause 6
|
Coriant GmbH & Co. KG
|
Q11/15
|
2016-01-29 |
|
[ 1553 ]
|
RMS Frequency Offset of CPRI Clients Asynchronously Mapped to and Demapped from OTN
|
Microsemi Corporation
|
Q13/15, Q11/15
|
2016-01-29 |
|
[ 1552 ]
|
PTP Timestamping on Multilane OTN Interfaces
|
Microsemi Corporation
|
Q13/15, Q11/15
|
2016-01-29 |
|
[ 1530 ]
|
Considerations on new Ethernet signals over OTN
|
KDDI Corporation
|
Q11/15
|
2016-01-28 |
|
[ 1521 ]
|
Clarification on the timing accuracy specification for the 1PPS measurement interface
|
Huawei Technologies Co., Ltd.
,
Orange
,
Telefon AB - LM Ericsson
|
Q13/15, Q11/15
|
2016-01-22 |
|
[ 1486 ]
|
Consideration of non-transparent mapping in the CPRI-over-OTN supplement
|
SK Telecom
|
Q11/15
|
2015-06-09 |
|
[ 1452 ]
(Rev.1) |
Performance of multi-vendor interoperable 100G coherent interfaces
|
Deutsche Telekom AG
|
Q6/15, Q11/15
|
2015-06-09 |
|
[ 1390 ]
|
Message rate of PTP over OTN
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q13/15, Q11/15
|
2015-06-09 |
|
[ 1369 ]
|
Editorial comments for G.7044
|
Alcatel-Lucent Shanghai Bell
,
China Mobile Communications Corporation
|
Q11/15
|
2015-06-09 |
|
[ 1357 ]
|
Proposal of standardization for cascaded and nested protection of multiple OTN domains
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd.
|
Q9/15, Q11/15
|
2015-06-09 |
|
[ 1354 ]
(Rev.1) |
OTUC4 IrDI Format Decision Criteria
|
Inphi Corporation
|
Q11/15
|
2015-06-08 |
Resultados :301 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):