Contribuciones
[ Origen: Alcatel-Lucent USA Inc. ] |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 971 ]
|
ODU SMP High Order Signalling Option
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2014-11-10 |
|
[ 970 ]
|
Market Drivers and Timing for B100G OTN Standardization and IaDI Considerations
|
Alcatel-Lucent USA Inc.
,
Coriant GmbH & Co. KG
,
Telefon AB - LM Ericsson
,
ZTE Corporation
|
Q11/15
|
2014-11-10 |
|
[ 961 ]
|
Proposed input to G.cca
|
Alcatel-Lucent USA Inc.
|
Q14/15, Q12/15
|
2014-11-10 |
|
[ 959 ]
|
Proposal for G.cca outline
|
Alcatel-Lucent USA Inc.
|
Q14/15, Q12/15
|
2014-11-10 |
|
[ 862 ]
|
Proposed material for draft new Recommendation G.gim "Generic Protocol-Neutral Information Model for Transport Resources"
|
Alcatel-Lucent USA Inc.
,
Deutsche Telekom AG Standardization
,
Ericsson Canada, Inc.
|
Q14/15
|
2014-11-09 |
|
[ 660 ]
|
G.8275.1: Frequency based ClockClasses for Option II and III networks
|
Alcatel-Lucent USA Inc.
|
Q13/15
|
2014-03-10 |
|
[ 521 ]
|
G.8152 v0.05 Data Dictionary clauses 1.7 - 1.11
|
Alcatel-Lucent USA Inc.
|
Q14/15
|
2014-03-08 |
|
[ 520 ]
|
Proposal Work Areas for updating G.8052
|
Alcatel-Lucent USA Inc.
|
Q14/15
|
2014-03-08 |
|
[ 504 ]
|
Example Alternative B100G ODU Frame Format
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2014-03-07 |
|
[ 503 ]
|
Thoughts on FEC for 400G IrDI
|
Alcatel-Lucent USA Inc.
|
Q6/15, Q11/15
|
2014-03-07 |
|
[ 502 ]
|
Possible areas for B100G OTN Framing optimization
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2014-03-07 |
|
[ 501 ]
|
Possible 400G Ethernet PCS format and implications for B100G OTN framing
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2014-03-07 |
|
[ 500 ]
|
OTN B100G Framing Decisions
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2014-03-07 |
|
[ 499 ]
|
ODU SMP Lower Order 1-stage signalling
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2014-03-07 |
|
[ 497 ]
|
ODU SMP Proposal Status
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2014-03-07 |
|
[ 391 ]
|
Version of ring APS PDUs in Y.1731 and editorial comments on Y.1731
|
Alcatel-Lucent USA Inc.
|
Q10/15
|
2013-06-18 |
|
[ 388 ]
(Rev.1) |
Forwarding behaviour for OAM frames at MIPs in G.8021
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2013-06-18 |
|
[ 387 ]
|
Validating assumptions made in the context of MECP
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2013-06-18 |
|
[ 278 ]
|
Beyond 100G OTN relationships to IEEE Standardization Schedule
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2013-06-17 |
|
[ 277 ]
|
ODUflex hitless resizing beyond 100G
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2013-06-17 |
|
[ 276 ]
|
Multi-vendor IaDI
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2013-06-17 |
|
[ 275 ]
|
Re-arrangement times for G.8271.1 HRM topologies
|
Alcatel-Lucent USA Inc.
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2013-06-17 |
|
[ 273 ]
|
Timing for standardization of OTN beyond 100G
|
Alcatel-Lucent USA Inc.
|
Q6/15, Q11/15
|
2013-06-17 |
|
[ 272 ]
(Rev.1) |
Service Requirements for Manageable Synchronization Infrastructure
|
Alcatel-Lucent USA Inc.
,
Sprint
|
Q13/15
|
2013-06-17 |
|
[ 271 ]
|
ODU SMP Signalling Options
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2013-06-17 |
|
[ 269 ]
|
Availability/Outage times for ODUSMP
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2013-06-17 |
|
[ 129 ]
|
On the editorial placement of NG-PON2 (TWDM) TC-layer specifications
|
Alcatel-Lucent USA Inc.
,
Futurewei Technologies US R&D Center
|
Q2/15
|
2013-06-15 |
|
[ 13 ]
|
Modelling of OTN Delay Measurement
|
Alcatel-Lucent USA Inc.
,
Deutsche Telekom AG
|
Q14/15
|
2013-05-29 |
|
[ 5 ]
|
Allocation of Y.1731 TLV Types for MEF Control Protocols
|
Alcatel-Lucent USA Inc.
,
Cisco Systems, Inc.
|
Q9/15, Q10/15
|
2013-05-28 |
|
[ 4 ]
|
Assigning Y.1731 OpCodes for MEF Control Protocols
|
Alcatel-Lucent USA Inc.
,
Cisco Systems, Inc.
|
Q9/15, Q10/15
|
2013-05-28 |
Resultados :80 documentos Resultados :
Anterior -
1 -
2
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):