Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 629 ]
|
ITU-T L.SE_DC "Smart energy solution for data centre and telecom centre": Proposal to add new chapter green energy solutions
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q6/5
|
2020-04-27 |
|
[ 628 ]
|
ITU-T L.SE_DC "Smart energy solution for data centre and telecom centre": Proposal to add new chapter Smart Controlling method of Environmental Condition solution
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q6/5
|
2020-04-27 |
|
[ 627 ]
|
ITU-T L.SE_DC "Smart energy solution for data centre and telecom centre": Proposal to add new chapter evaporative cooling solutions
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q6/5
|
2020-04-27 |
|
[ 626 ]
|
ITU-T L.SE_DC "Smart energy solution for data centre and telecom centre": Proposal to add new chapter Liquid cooling solutions
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q6/5
|
2020-04-27 |
|
[ 625 ]
|
Proposed new work item on "specifications of 10kV AC input and up to 400VDC output power system in data center and telecommunication room"
|
Ministry of Industry and Information Technology (MIIT), China; Alibaba (China) Co., Ltd.
|
Q6/5
|
2020-04-27 |
|
[ 624 ]
|
KSTR.EMF_assess on "The assessment of electromagnetic field on medical and beauty treatment devices": Proposal for case study
|
Korea (Rep. of)
|
Q3/5
|
2020-04-27 |
|
[ 623 ]
|
EMF strength measurements for the WPT system of electric vehicles and the measurement results
|
Korea (Rep. of)
|
Q3/5
|
2020-04-27 |
|
[ 622 ]
|
L.SE_DC on "Smart energy solution for data centre and telecom centre": Proposal for updating clause 6
|
Korea (Rep. of)
|
Q6/5
|
2020-04-27 |
|
[ 621 ]
(Rev.1) |
K.peak: Rationale of the expression of spatial averaging for evaluating real exposure level
|
Korea (Rep. of)
|
Q3/5
|
2020-04-27 |
|
[ 620 ]
|
Proposed updates to draft Recommendation L.SP_OB
Proposed updates to draft Recommendation L.SP_OB
|
Telecom Italia S.p.A. (Italy)
,
Huawei Technologies Co., Ltd. (China)
|
Q6/5
|
2020-04-26 |
|
[ 619 ]
(Rev.1) |
K.pim on ''Passive intermodulation test methods of array antenna systems in mobile communication systems''(Revised according to previous discussion)
|
China Mobile Communications Corporation
|
Q4/5
|
2020-04-26 |
|
[ 618 ]
|
L.5G_sav on "Energy saving technologies and best practices for 5G RAN equipment": Proposed the skeleton and 1st draft text.
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q6/5
|
2020-04-26 |
|
[ 617 ]
(Rev.1) |
1st draft of the new ITU-T Supplement K.SUP.5G.EMC "Impacts of Electromagnetic compatibility test methods for 5G AAS''
|
ZTE Corporation (China)
,
China Telecommunications Corporation
|
Q4/5
|
2020-04-26 |
|
[ 616 ]
(Rev.1) |
Proposal to revise ITU-T K.112, Lightning protection, earthing and bonding: Practical procedures for radio base stations
|
Huawei Technologies Co., Ltd. (China)
|
Q1/5
|
2020-04-26 |
|
[ 615 ]
(Rev.1) |
Proposal to revise ITU-T K.56, Protection of radio base stations against lightning discharges
|
Huawei Technologies Co., Ltd. (China)
|
Q1/5
|
2020-04-26 |
|
[ 614 ]
(Rev.1) |
Strategic approach to disposal of counterfeit mobile devices as a result of the installation of Central Equipment Identifier Register (CEIR).
|
Tanzania Communications Regulatory Authority (TCRA)
,
Uganda Communications Commission (UCC)
|
Q7/5
|
2020-04-25 |
|
[ 613 ]
(Rev.1) |
Contribution to the supplement giving guidance for organizations interested in complying with the new L.1470 Recommendation
|
Nokia Corporation (Finland)
|
Q9/5
|
2020-04-22 |
|
[ 612 ]
(Rev.1) |
Proposed Corrigendum 2 to Recommendation ITU-T K.98
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-04-20 |
|
[ 611 ]
(Rev.1) |
Update of the ITU-T Supplement 1 "Guide on electromagnetic fields and health"
|
Orange Polska S.A. (Poland)
|
Q3/5
|
2020-04-12 |
|
[ 610 ]
|
Baseline document for the Sustainable Management of Batteries L.SM_Batteries
|
Agence Ivoirienne de Gestion des Fréquences Radioélectriques (AIGF) (Côte d'Ivoire)
|
Q7/5
|
2020-04-08 |
|
[ 609 ]
|
Proposed Amendment 1 to Recommendation ITU-T K.50
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-03-30 |
|
[ 608 ]
(Rev.1-2) |
Circular savings, including electronic waste
|
Autorité Nationale de Régulation des Technologies de l'Information et de la Communication (ANRTIC) (Comoros)
|
Q7/5
|
2020-02-28 |
|
[ 607 ]
|
Management of WEEE and remediation of negative impact of telecommunication infrastructure on public and private buildings
|
Ministère des Postes, des Télécommunications et de l'Economie Numérique (Guinea)
|
Q7/5
|
2020-02-04 |
|
[ 606 ]
(Rev.1) |
Suggested title for ITU-T SG5 during the new Study Period (2021-2024)
|
Ministry of Communications and Information Technology (MCIT) (Egypt)
|
QALL/5
|
2020-02-03 |
|
[ 605 ]
|
Climate change and assessment of information and communication technology (ICT) in the framework of the Sustainable Development Goals (SDGs)
|
Ministère des Postes, Télécommunications et Nouvelles Technologies de l'Information et de la Communication (Dem. Rep. of the Congo)
|
Q9/5
|
2020-01-25 |
Resultados :75 documentos Resultados :
Anterior -
1 -
2
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):