Contributions |
|
Number
|
Title
|
Source
|
Date
|
|
[ 111 ]
|
Updates of compilation of material maintained by the Joint Task Group 4-5-6-7 Working Group
|
Korea (Republic of)
|
2013-07-12 |
|
[ 110 ]
|
Proposed draft CPM text for WRC-15 agenda item 1.1
|
Korea (Republic of)
|
2013-07-12 |
|
[ 109 ]
|
Allocationn and use of bands by the radio astronomy service in the frequency range 470 MHz - 6 GHz
|
IUCAF
,
CRAF
|
2013-07-12 |
|
[ 108 ]
|
Remarks on the wave propagation model for the studies in ITU-R Joint Task Group 4-5-6-7
|
European Broadcasting Union
|
2013-07-12 |
|
[ 107 ]
|
Principles of broadcast planning to be considered in sharing studies
|
European Broadcasting Union
|
2013-07-12 |
|
[ 106 ]
|
Assessment of IMT user equipment interference into broadcast receivers by means of Monte Carlo simulations
|
European Broadcasting Union
|
2013-07-12 |
|
[ 105 ]
|
Sharing and coexistence study between IMT systems networks and FSS space stations in the 5925-6425 MHz band
|
Russian Federation
|
2013-07-11 |
|
[ 104 ]
|
Feasibility assessment for accommodation of mobile broadband long term evolution (LTE) systems in the 2 025-2 110 MHz band
|
United States of America
|
2013-07-12 |
|
[ 103 ]
|
Preliminary compatibility study between mobile broadband systems (including IMT) and fixed satellite service receive earth stations operating in the 3 400-4 200 MHz
|
United States of America
|
2013-07-12 |
|
[ 102 ]
|
Proposed revisions to working document towards preliminary draft CPM text for WRC-15 Agenda item 1.1
|
United States of America
|
2013-07-12 |
|
[ 101 ]
|
Working document towards a preliminary draft new Report ITU-R M.[5350MHzEESS] -
Compatibility studies between Radio Local Area Network (RLAN) systems and EESS (active) Synthetic Aperture Radar (SAR) systems in the 5 350-5 470 MHz band
|
United States of America
|
2013-07-12 |
|
[ 100 ]
|
Working document towards a preliminary draft new Report ITU-R M.[5350MHzAERO] -
Compatibility studies between Radio Local Area Network (RLAN) systems and aeronautical airborne radar systems in the 5 350-5 460 MHz band
|
United States of America
|
2013-07-12 |
|
[ 99 ]
|
Feasibility assessment for accomodation of mobile broadband long term evolution (LTE) systems in the 2 200-2 290 MHz band
|
United States of America
|
2013-07-12 |
|
[ 98 ]
|
Sharing studies between mobile broadband applications in the mobile service to protect earth stations of the meteorological-satellite service operating in and adjacent to the 1 695 ? 1 710 MHz band
|
United States of America
|
2013-07-12 |
|
[ 97 ]
|
Information paper on 5 GHz sharing issues
|
United States of America
|
2013-07-12 |
|
[ 96 ]
|
Proposal for modification of attachment 4 of "working document on sharing and compatibility studies under agenda item 1.2" (Annex 5 to document 4-5-6-7/113)
|
Rai Way S.p.A.
|
2013-07-11 |
|
[ 95 ]
|
Sharing study on the effects of international mobile telecommunications-advanced systems on the C-band earth stations
|
North American Broadcasters Association (NABA)
|
2013-07-10 |
|
[ 94 ]
|
Proposals for the development of CPM Text under WRC-15 Agenda item 1.1
|
Russian Federation
|
2013-07-11 |
|
[ 93 ]
|
Possible approaches to define methods to satisfy WRC-15 Agenda item 1.1
|
Russian Federation
|
2013-07-11 |
|
[ 92 ]
|
Proposals for modification of working document towards preliminary draft CPM Text for WRC-15 Agenda item 1.2
|
Russian Federation
|
2013-07-11 |
|
[ 91 ]
|
Proposals on modification of working document towards preliminary draft new Report ITU-R M.[ARNS-MS]
|
Russian Federation
|
2013-07-11 |
|
[ 90 ]
|
Ananlysis of possible operation of IMT systems in the frequency band 2700-3100 MHz
|
Russian Federation
|
2013-07-11 |
|
[ 89 ]
|
Compatibility studies of IMT systems with aeronautical telemetry systems in the frequency band 1429-1535 MHz
|
Russian Federation
|
2013-07-11 |
|
[ 88 ]
|
Compatibility studies of IMT systems with radiolocation systems in the frequency band 1300-1400 MHz
|
Russian Federation
|
2013-07-11 |
|
[ 87 ]
|
Studies on frequency related matters for international mobile telecommunications and other terrestrial mobile broadband applications - Technical and regulatory framework in Australia to protect digital terrestrial television broadcasting below 694 MHz
|
Australia
|
2013-07-10 |
|
[ 86 ]
|
Information on the usage of the 690 to 790 MHz band by SAB/SAP - Results of measurements during a number of rcent major events in Germany
|
Germany (Federal Republic of)
|
2013-07-09 |
|
[ 85 ]
|
APT views on WRC-15 Agenda item 1.1
|
Asia-Pacific Telecommunity
|
2013-07-09 |
|
[ 84 ]
|
Work on Agenda item 1.2
|
ECOWAS Administrations
,
Cameroon (Republic of)
|
2013-07-05 |
|
[ 83 ]
|
WRC-15 Agenda item 1.1 - Elements of sharing and compatibility studies between the broadcasting service and the mobile service
|
C.B.S., Inc.
|
2013-07-07 |
|
[ 82 ]
|
WRC-15 Agenda item 1.1 - Technical and operational characteristics of terrestrial television broadcasting for sharing and compatibility studies under WRC-15 Agenda item 1.1
|
C.B.S., Inc.
|
2013-07-07 |
|
[ 81 ]
|
Comment on Working Party 5D liaison statement to Joint Task Group 4-5-6-7 July meeting regarding suitable candidate bands under 1.1
|
ECOWAS Administrations
,
Cameroon (Republic of)
|
2013-07-03 |
|
[ 80 ]
|
Technical Parameters of DTTB Systems C (ISDB-T) for sharing and compatibility studies between the broadcasting service and the mobile service under WRC-15 Agenda items 1.1 and 1.2
|
Japan
|
2013-07-02 |
|
[ 79 ]
|
Considerations on compatibility between services in the 1 400-1 427 MHz band and IMT systems in the 1 427.9-1 462.9 MHz and 1 475.9-1 510.9 MHz bands under WRC-15 Agenda item 1.1
|
Japan
|
2013-07-02 |
|
[ 78 ]
|
The result of sharing study between FSS and IMT-Advanced in the frequency band of 3400-3600 MHz considering geographical conditions
|
Japan
|
2013-07-02 |
|
[ 77 ]
|
Considerations on 3 400-4 200MHz and 4 400-4 900MHz bands under WRC-15 Agenda item 1.1
|
Japan
|
2013-07-02 |
|
[ 76 ]
|
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 7B, 7C, JTG 4-5-6-7 and the Special Commitee as responsible Groups for WRC-15 Agenda items 1.1, 1.3, 1.5, 1.6, 1.9, 1.10, 1.11, 1.12, 1.17, 1.18, 7, 9.1.1, 9.1.2, 9.1.5, 9.1.6, 9.1.8, 10 (copy to Working Party 5D)
|
World meteorological Organization
|
2013-03-06 |
|
[ 75 ]
|
Liaison statement to ITU-R Working Parties 5A, 5B, 5D and Joint Task Group 4-5-6-7 - WRC-15, Agenda item 1.1 - IMO's concerns in relation to the wide range of frequency bands identified by ITU-R for future assessment of the suitability for IMT
|
International Maritime Organisation
|
2013-02-28 |
|
[ 74 ]
|
UK strategy for UHF spectrum use:an update
|
United Kingdom of Great Britain and Northern Ireland
|
2013-02-07 |
|
[ 73 ]
|
WRC-15 Agenda items 1.1 and 1.2 - Technical and operational characteristics as well as protection criteria for the terrestrial component of IMT systems for studies under WRC-15 Agenda items 1.1 and 1.2
|
Free TV Australia Ltd.
|
2013-02-01 |
|
[ 72 ]
|
Suitable frequency ranges for IMT in the context of WRC-15 Agenda item 1.1
|
South Africa (Republic of)
,
Zimbabwe (Republic of)
|
2012-11-14 |
|
[ 71 ]
|
Meeting the demand for wireless broadband: Providing access to the 470-698 MHz frequency band
|
United States of America
|
2012-11-14 |
|
[ 70 ]
|
Proposed revisions to working document towards preliminary draft CPM text for WRC-15 Agenda item 1.1
|
United States of America
|
2012-11-14 |
|
[ 69 ]
|
Elements for sharing studies
|
Norddeutscher Rundfunk (NDR)
,
Zweites Deutsches Fernsehen
|
2012-11-14 |
|
[ 68 ]
|
Proposed modifications to Annex 6 to Joint Task Group 4-5-6-7 Chairman's Report - Elements for sharing and compatibility studies between the broadcasting and the mobile service under Agenda item 1.2
|
European Broadcasting Union (EBU)
|
2012-11-14 |
|
[ 67 ]
|
Error estimation in the 'Main-interferer' assumption
|
European Broadcasting Union (EBU)
|
2012-11-14 |
|
[ 66 ]
|
Possible future implementations of IMT in the 1 400 MHz range and required studies
|
TeliaSonera AB
|
2012-11-14 |
|
[ 65 ]
|
Elements to be considered for sharing studies between MS and ARNS in relation Agenda item 1.2
|
TeliaSonera AB
|
2012-11-14 |
|
[ 64 ]
|
Working document towards draft CPM text for WRC-15 Agenda item 1.2
|
Iran (Islamic Republic of)
|
2012-11-14 |
|
[ 63 ]
|
Comments on the course of action undertook in first jtg meeting
|
Iran (Islamic Republic of)
|
2012-11-14 |
|
[ 62 ]
|
Support for CBS, Inc., contribution JTG 4-5-6-7/66 - Guidelines for the assessment of interferenced into the broadcasting service
|
North American Broadcasters Association (NABA)
|
2012-11-14 |
Results:611 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):