International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A  C 

ITU-R WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:681 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 181 ]  
 
Assessment of sharing feasibility of the fixed satellite service (space-to-Earth) with the mobile service in the frequency band 14.5-15.35 GHz     Russian Federation     2013-04-22
[ 180 ]  
 
Working document on proposal to the revision of the Document (Annex 11 to Document 4A/125) "Some elements of a working document towards a preliminary draft new Report ITU-R S.[ESV] on the interference effect of transmissions from earth stations on board vessels operating in fixed-satellite service networks on terrestrial co-frequency stations"     Russian Federation     2013-04-22
[ 179 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 on Agenda item 1.1     Iran (Islamic Republic of)     2013-04-22
[ 178 ]  
 
Simplification of Radio Regulation Regime on Space Services - WRC-15 Agenda item 7     Iran (Islamic Republic of)     2013-04-22
[ 177 ]  
 
Working document on preliminary outline for draft CPM text on WRC-15 Agenda item 1.8     Iran (Islamic Republic of)     2013-04-22
[ 176 ]  
 
Comments on Annex 11 to Working Party 4A Chairman's Report (Document 4A/125) - WRC-15 Agenda item 1.8 - Earth stations on board vessels (ESVs)     Iran (Islamic Republic of)     2013-04-22
[ 175 ]  
 
ICT sectorial consultation on the role of ICTS to promote the inclusion of persons with disabilities - Request for inputs from relevant ITU-R Study Groups     Note by the Secretary-General     2013-04-19
[ 174 ]  
 
Question ITU-R 136-1/6 - Worldwide broadcasting roaming     SG 6     2013-04-19
[ 173 ]  
 
Draft new Report ITU-R S.[VSAT] - Use of very small aperture terminals (VSATs)     Japan     2013-04-18
[ 172 ]  
 
Proposed working document - Preliminary outline for draft CPM text on WRC-15 Issue 9.1.2     Japan     2013-04-18
[ 171 ]  
 
Proposed modification to the working document - Technical criteria used in application of RR No. 9.41 in respect of coordination under RR No. 9.7     Japan     2013-04-18
[ 170 ]  
 
Working document - Proposal on revision of the preliminary draft new Report ITU-R S.[VSAT] - Use of very small aperture terminals (VSATs)     Russian Federation     2013-04-17
[ 169 ]  
 
Status report of the Focus Group on Disaster Relief Systems, Network Resilience and Recovery (FG-DR&NRR)     ITU-T FG-DR&NRR     2013-04-17
[ 168 ]  
 
Liaison statement to Working Party 4A - Elements and compatibility studies related to the band 13.25-13.75 GHz     WP 7C     2013-04-16
[ 167 ]  
 
Liaison statement to Working Party 4A - WRC-15 Agenda item 1.8     WP 7D     2013-04-16
[ 166 ]  
 
Working document towards a preliminary draft new Report ITU-R S.[FSS 7/8 GHz COMPATIBILITY] - Compatibility studies between the fixed-satellite service and the terrestrial and other space services in the frequency bands 7 150-7 250 MHz (space-to-Earth) and 8 400-8 500 MHz (Earth-to-space)     Korea (Republic of)     2013-04-16
[ 165 ]  
 
Working document towards a preliminary draft revision of Report ITU-R BO.2007-1 - Considerations for the introduction of broadcasting-satellite service high-definition television systems     Korea (Republic of)     2013-04-16
[ 164 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 4C, 5A) - WRC-15 Agenda item 1.6     WPs 7B, 7C, 7D     2013-04-16
[ 163 ]  
 
Liaison statement to Working Party 4A - Sharing between the potential EESS (Earth-to-space) and FSS allocations in the 7-8 GHz range     WP 7B     2013-04-15
[ 162 ]  
 
Liaison statement to Working Party 4A - Elements of CPM text for the draft CPM Report to WRC-15 Agenda item 1.9.1     WP 7B     2013-04-15
[ 161 ]  
 
Liaison statement to Working Party 4A - Sharing studies between FSS and SRS related to WRC-15 Agenda item 1.9.1     WP 7B     2013-04-15
[ 160 ]  
 
Liaison statement to Working Party 4A - Regarding draft new Report ITU-R SA.[SRS SHARING 37GHz]     WP 7B   211/7   2013-04-15
[ 159 ]  
 
Liaison statement from ITU-D SG2 Question 25/2 to ITU-R Working Parties 4A, 4B and 4C on the Report on Access technology for broadband telecommunications including IMT, for developing countries     ITU-D SG 2     2013-04-11
[ 158 ]  
 
WRC-15 Agenda item 9.1, Issue 9.1.6     Chairman, SG 4     2013-04-05
[ 157 ]  
+Corr.1 
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 7B, 7C, JTG 4-5-6-7 and the Special Committee as responsible Groups for WRC-15 Agenda items 1.1, 1.3, 1.5, 1.6, 1.9, 1.10, 1.11, 1.12, 1.17, 1.18, 7, 9.1.1, 9.1.2, 9.1.5, 9.1.6, 9.1.8, 10 (copy to Working Party 5D)     World Meteorological Organization     2013-03-06
[ 156 ]  
 
Liaison statement to ITU-R Working Party 4A and CIRM - WRC-15 Agenda item 1.8 - Broadband satellite earth stations aboard vessels (ESV)     International Maritime Organization     2013-02-28
[ 155 ]  
 
Liaison statement to JTG 4-5-6-7 (copy to Working Party 4A, Working Party 4B, Working Party 4C, Working Party 5A, Working Party 5B, Working Party 5C, Working Party 6A, Working Party 7B, Working Party 7C, Working Party 7D, Working Party 1A, Working Party 3K, Working Party 3M)     WP 5D     2013-02-18
[ 154 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to WPs 4A, 4B, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D, (WPs 1A, 3K, 3M)) - Suitable frequency ranges above 6 GHz     WP 5D     2013-02-18
[ 153 ]  
 
Liaison statement to ITU-R Working Party 4A - Compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments     WP 5D     2013-02-07
[ 152 ]  
 
Liaison statement to Study Groups 4, 5, 6 and 7 and Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D as concerned Groups for WRC-15 Agenda item 1.1 - Preparations for WRC-15 Agenda item 1.1 - Technical and operational characteristics     JTG 4-5-6-7     2012-12-06
[ 151 ]  
 
Liaison statement to Radiocommunication Study Group 4 - Result of the Study Group 5 meeting (19-20 November 2012) on a SF-series Recommendation     SG 5     2012-11-28
[ 150 ]  
 
Liaison statement to Working Parties 4A, 7B, 7C and 7D (copy to Working Parties 5B, 5C and 5D) - WRC-15 Agenda item 1.6 - Characteristics of and protection criteria for mobile systems operating in the frequency range 14.5-15.35 GHz     WP 5A     2012-11-20
[ 149 ]  
 
Liaison statement to ITU-R Working Party 4A (copy to Working Parties 3M and 7B for information) - WRC-15 Agenda item 1.9 issue 1.9.1     WP 5A     2012-11-20
[ 148 ]  
 
Liaison statement to Working Party 4A - Technical characteristics and protection criteria for the FSS in support of studies under WRC-15 Agenda item 1.17     WP 5B     2012-11-19
[ 147 ]  
 
Liaison statement to working Party 4A, 5C and 5D - WRC-15 Agenda item 1.6 - Technical characteristics of and protection criteria for aeronautical mobile systems operating in the frequency range 14.5-15.38     WP 5B     2012-11-19
[ 146 ]  
(Rev.1) 
Liaison statement to ITU-R Working Parties 4A, 4B and 4C - WRC-15 Agenda item 1.5     WP 5B     2012-11-19
[ 145 ]  
 
Liaison statement to ITU-R Working Party 4A - WRC-15 Agenda item 1.7 - Consideration of Resolution 114 (Rev.WRC-12) - Studies on compatibility between new systems of the aeronautical radionavigation service and the fixed-satellite service (Earth-to-space) (limited to feeder links of the non-geostationary mobile-satellite systems in the mobile-satellite service) in the frequency ..     WP 5B     2012-11-19
[ 144 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 and Study Group 4, 5, 6, and 7 - WRC-15 Agenda item 1.1 - Modelling considerations and other considerations for 5-6 GHz frequency range     WP 5B     2012-11-16
[ 143 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties (4A, 4B, 4C, 5B, 5C 5D, 6A, 7B, 7C, 7D 1A, 3K 3M) for information) - WRC-15 Agenda item 1.1 - Working Party 5A initial information on spectrum requirements studies for WRC-15 Agenda item 1.1     WP 5A     2012-11-16
[ 142 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties (4A, 4B, 4C 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) for information) - WRC-15 Agenda item 1.1 - Sharing considerations for the 5-6 GHz frequency range for WRC-15 Agenda item 1.1     WP 5A     2012-11-16
[ 141 ]  
 
Liaison statement to Working Party 4A - Review of SF-series Recommendations     WP 5C     2012-11-14
[ 140 ]  
 
Liaison statement to Working Party 4A and Working Party 4C - In relation to the I/N issue (AI 1.9.1, 1.9.2 and 1.10)     WP 5C     2012-11-14
[ 139 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 5A and 5B for information) WRC-15 Agenda item 1.6     WP 5C     2012-11-14
[ 138 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 4C, 5A, 5B, 7A, 7B, 7C and 7D for information) - WRC-15 Agenda item 1.8 - Possible review of the provisions relating to earth stations on board vessels in the 5 925-6 425 MHz and 14-14.5 GHz bands     WP 5C     2012-11-14
[ 137 ]  
 
Liaison statement to Working Parties 1A and 1B (for information to WPs 4A, 4B, 4C, 5A, 5B, 5D, 6A, 6B, 6C, 7B, 7C, 7D on further studies on cognitive radio systems (CRS))     WP 5C     2012-11-14
[ 136 ]  
(Rev.1) 
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to the relevant Working Parties of Study Groups 1, 3, 4, 5, 6 and 7) - WRC-15 Agenda item 1.1 operating characteristics of AMT systems     WP 5B     2012-11-09
[ 135 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 WRC-15 Agenda item 1.1 (copy to Working Parties 1A, 3K, 3M, 4A, 4B, 4C, 5A, 5C, 5D and 7C for information)     WP 5B     2012-11-09
[ 134 ]  
+Add.1 
Preliminary draft new Recommendation ITU-R BO.[IMPR_BSS_REF_ANT_DIAG] - Improved BSS receiving earth stations reference antenna radiation pattern for RR Appendix 30 Regions 1 and 3 systems     Bulgaria (Republic of)     2012-10-01
[ 133 ]  
 
Report of the eighth meeting of the Joint IMO/ITU Experts Group on maritime radiocommunication matters     International Maritime Organization     2012-10-18
[ 132 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 - Sharing parameters for WRC-15 Agenda item 1.2     WP 5D     2012-10-16
Results:681 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-11-16