International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP6A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP6A  C 

ITU-R WP6A

Terrestrial Broadcasting Delivery

Results:589 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 89 ]  
 
Liaison statement to Working Parties 1A, 5B and 6A - Studies on WRC-19 agenda item 9.1, issue 9.1.6 - "Wireless power transmission for Electric Vehicles (WPT4EV)"     WP 1B   AI9.1   2016-06-20
[ 88 ]  
 
Liaison statement to Working Party 6A - Creation of a WP 1C Correspondence Group on DVB-T/T2 coverage measurements and evaluation of planning criteria towards a review of Recommendation ITU-R SM.1875-2     WP 1C     2016-06-17
[ 87 ]  
 
Liaison statement to Working Parties 5B and 6A - Proposed revision of Recommendation ITU-R SM.1009-1     WP 1A     2016-06-16
[ 86 ]  
 
Liaison statement to Working Party 7D (copy to Working Parties 1B, 5A, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam relative to protection of the passive services     WP 1A   210-3/1   2016-06-16
[ 85 ]  
 
Reply liaison statement to Working Party 5B (copied for information to Working Parties 1B, 5A, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam relative to the services under the purview of WP 5B     WP 1A   210-3/1   2016-06-16
[ 84 ]  
 
Reply liaison statement to Working Party 5A (copied for information to Working Parties 1B, 5B, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 1A   210-3/1   2016-06-16
[ 83 ]  
 
Liaison statement to Working Parties 1B, 5A, 5B, 5C, 6A, 7A and 7D - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 1A   210-3/1   2016-06-16
[ 82 ]  
 
Liaison statement to ITU-T Study Group 5 (copy for information to ITU-R Working Parties 5B & 6A) - ITU-R interest in K-series Recommendations     WP 1A     2016-06-16
[ 81 ]  
 
Liaison statement to ITU-T Study Group 5 (copy for information to ITU-R Working Parties 5B and 6A and to ITU-T Study Group 9) - Leakage and impact of radio frequency noise from telecommunication systems using metallic conductors     WP 1A     2016-06-16
[ 80 ]  
 
Liaison statement to Working Parties 1C & 3L (copy for information to Working Parties 5A, 5B, 5C, 6A, 7A & 7D) - Assessment of the impact of other emissions to Radiocommunication services (Questions ITU-R 221-2/1 & ITU-R 236/1)     WP 1A     2016-06-15
[ 79 ]  
 
Liaison statement to Working Parties 3J, 3K and 3M (copy to Working Parties 4A, 5A, 5C, 5D, 6A, 7C and 7D) - Propagation characteristics in the range 275-450 GHz in preparation for WRC-19 agenda item 1.15     WP 1A   AI1.15   2016-06-13
[ 78 ]  
 
Liaison statement to ITU-T Study Group 15 (copy to Working Parties 5A, 5B, 5C, 5D, 6A and 6C) - Liaison activities on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) standards overviews and work plans     WP 1A     2016-06-13
[ 77 ]  
 
Liaison statement to Working Parties 7C and 7D (copy to Working Parties 3J, 3K, 3M, 4A, 5A, 5C, 5D and 6A) - Request for characteristics of passive systems operating in the frequency range 275-450 GHz as related to WRC-19 agenda item 1.15     WP 1A   AI1.15   2016-06-13
[ 76 ]  
 
Liaison statement to ITU-T Study Group 5 and ITU-D Study Group 2 (copy for information to ITU-R Working Parties 4A, 5A, 5B, 5C, 5D and 6A) - WHO: fundamental safety principles for protection against non-ionizing radiation     SG 1     2016-06-13
[ 75 ]  
 
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing...     WP 1B     2016-06-13
[ 74 ]  
 
Reply liaison statement to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on the progress of ongoing work on WTDC Resolution 9 (Rev. Dubai, 2014) during the ITU-D study period 2014-2017, with respect to Chapter 1 - New/emerging spectrum management approaches (copied to ITU-R Working Parties 1A, 1C, 5A, 5B, 5C, 5D, and 6A for information)     WP 1B     2016-06-13
[ 73 ]  
 
Liaison statement to ITU-R Working Parties 5A and 5C (copy to ITU-R Working Parties 3J, 3K, 3M, 4A, 5D, 6A, 7C and 7D) - Preparations for WRC-19 agenda item 1.15 - Request for characteristics of land-mobile and fixed service applications in the frequency range 275-450 GHz as related to WRC-19 agenda item 1.15     WP 1A   AI1.15   2016-06-08
[ 72 ]  
 
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T Study Group 5, ITU-R Study Groups 1, 5, 6 and their relevant Working Parties on ongoing collaboration     ITU-D SG 2     2016-06-06
[ 71 ]  
 
Liaison statement to Working Party 5D (copied for information to Task Group 5/1) - Propagation advice in support of agenda item 1.13: input requested from Working Party 5D     Chairmen, SG 3, WP 3J, WP 3K and WP 3M   AI1.13   2016-06-01
[ 70 ]  
 
RF human exposure - WHO: Fundamental safety principles for protection against non-ionizing radiation     ATDI     2016-05-26
[ 69 ]  
 
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M 4A, 4B, 4C, 5B, 5C, 5D and 6A) - WRC-19 agenda item 1.7     WP 5A   AI1.7   2016-05-25
[ 68 ]  
 
Liaison statement to Working Party 7B (copied for information to Working Parties 3M, 4C, 5B, 5C, 5D and 6A) - Technical characteristics for WRC-19 agenda item 1.3     WP 5A   AI1.3   2016-05-25
[ 67 ]  
 
Liaison statement to Working Party 6A (copy to Working Parties 1B, 5B, 5C, 3K and 3M) - WRC-19 agenda item 1.1     WP 5A   AI1.1   2016-05-25
[ 66 ]  
 
Reply liaison statement to Working Party 1A (copy for information to Working Parties 1B, 5B 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 5A     2016-05-25
[ 65 ]  
 
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Preparation for WRC-19 agenda item 1.13     TG 5/1   AI1.13   2016-05-25
[ 64 ]  
 
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M, 4A, 4B, 4C, 5A, 5B and 6A) - WRC-19 agenda item 1.7     WP 5C   AI1.7   2016-05-24
[ 63 ]  
 
Liaison statement requesting technical characteristics for WRC-19 agenda item 1.9.2 from Working Parties 4C, 5A, 5C, 6A, 7B and 7D (copy to Working Parties 1A and 3M for information)     WP 5B   AI1.9.2   2016-05-23
[ 62 ]  
 
Reply liaison statement to ITU-T Study Group 5, ITU-R Working Parties 5D and 6A (copy for information to Working Parties 3L, 1B, 1C and ITU-D Study Group 2) - Human exposure to electromagnetic fields (EMFS)     WPs 5A, 5B and 5C     2016-05-20
[ 61 ]  
 
Liaison statement to Working Party 7C (copy to Working Parties 5B and 6A for information) - Technical and operational characteristics for systems operating within the 40-50 MHz frequency band     WPs 5A and 5C     2016-05-20
[ 60 ]  
 
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M, 4A, 4B, 4C, 5A, 5C and 6A) - WRC-19 agenda item 1.7     WP 5B   AI1.7   2016-05-20
[ 59 ]  
 
Liaison statement to Working Party 1A (copied to Working Parties 5D and 6A for information) - Liaison with CENELEC on PLT, EMI and WPT     WPs 5A, 5B and 5C     2016-05-19
[ 58 ]  
 
Liaison statement on information about work that is being carried out within work under study in ITU-T Q7/5     ITU-T SG 5     2016-05-13
[ 57 ]  
 
Liaison statement on ITU inter-Sector coordination [to ISCT, TDAG, ITU-D SGs, RAG, ITU-R SGs, ITU-T SGs]     ITU-T TSAG     2016-05-10
[ 56 ]  
 
Reply to liaison statement from Working Party 6B (Copy to Working Parties 6A and 6C) - Information bit rate of transmission systems for UHDTV satellite broadcasting     WP 4B     2016-05-10
[ 55 ]  
 
Liaison statement on the transition from analogue to digital television broadcasting     ITU-D SG 1     2016-04-25
[ 54 ]  
 
Liaison statement to Working Party 6A and Study Group 6 on editorial amendment to Recommendation ITU-R BO.1774-2 - Use of satellite and terrestrial broadcast infrastructures for public warning, disaster mitigation and relief     WP 4B     2016-04-25
[ 53 ]  
 
Proposed Chairman of Working Party 6B of Study Group 6     Chairman, SG 6     2016-04-20
[ 52 ]  
 
Liaison statement to Working Party 1A (Copy to Working Parties 1B, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 7D   210-3/1   2016-04-13
[ 51 ]  
 
Liaison statement to Working Party 4A (Copy to Working Parties 4B, 5A, 5B, 5C, 5D, 6A, 7D and 3M) - WRC-19 agenda items 1.5 and 1.6     WP 7C   AI1.6, AI1.5   2016-04-11
[ 50 ]  
 
Liaison statement to Working Parties 5A, 5B and 6A - Technical and operational characteristics for systems operating within the 40-50 MHz frequency band     WP 7C     2016-04-11
[ 49 ]  
 
Liaison statement to Working Parties 3K and 3M (for action) and Study Group 5 and Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A and 7C (for information)     WP 7D     2016-04-11
[ 48 ]  
 
Liaison statement requesting technical characteristics for WRC-19 agenda item 1.3 from Working Parties 4C, 5A, 5B, 5C, 5D and 6A (copy to Working Party 3M for information)     WP 7B   AI1.3   2016-04-07
[ 47 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C and 6A concerning WRC-19 agenda item 1.7 (copy for information to Working Party 1A, Working Party 3M and Working Party 4B) - WRC-19 agenda item 1.7     WP 7B   AI1.7   2016-04-07
[ 46 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties     Chairman, CCV     2016-04-01
[ 45 ]  
 
RF Human exposure - Exposure distances around Point to Point Systems     ATDI     2016-03-29
[ 44 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C AND 7D) - Working document towards a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED]     WP 5D     2016-03-09
[ 43 ]  
 
Liaison statement to Working Parties 6A and 6B (copy to ITU-D/ITU-R Joint Rapporteur Group for Resolution 9 and ITU-D Study Group 1 Q8/1) - Television distribution using terrestrial International Mobile Telecommunication (IMT) networks     WP 5D     2016-03-08
[ 42 ]  
 
Reply liaison statement to ITU-T Study Group 5, ITU-D Study Group 2, ITU-R Working Party 6A (copy for information to Working Parties 3L, 1B, 1C, 5A, 5B, 5C) on information about work that is being carried out within work under study in ITU-T Q7/5 (Human exposure to electromagnetic fields (EMFS) due to radio systems and mobile equipment)     WP 5D     2016-03-08
[ 41 ]  
 
Reply liaison statement to IRG-AVA (copy for information to ITU-R Working Parties 1B, 5A, 6A, Study Group 5, ITU-T Study Groups 9 and 16) - Barriers to wireless connections for hearing aids and medical devices     WP 5D     2016-03-08
[ 40 ]  
 
Liaison statement on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) - Standards overview and workplans     ITU-T SG 15     2016-03-08
Results:589 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2021-01-19