International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP-7C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP-7C  C 

ITU-R WP-7C

Remote Sensing Systems

Results:531 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 31 ]  
 
Liaison statement to Working Party 7C - Protection of EESS (passive) systems operating in bands above 92 GHz and up to 174.8 GHz     WP 7C     2020-08-05
[ 30 ]  
 
Reply liaison statement to Working Party 7C - Preparation for WRC-23 agenda item 1.14 - Radiodetermination and aeronautical characteristics in the frequency band 231.5-252 GHz     WP 5B   AI1.14   2020-07-27
[ 29 ]  
 
Reply liaison statement to Working Party 7C - Preparation for WRC-23 agenda item 1.12 - Radiodetermination characteristics in or adjacent to the frequency band 40-50 MHz     WP 5B   AI1.12   2020-07-27
[ 28 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)     Chairman, CCV     2020-07-14
[ 27 ]  
 
Reply liaison statement on work being carried out in ITU-T SG5 on human exposure to EMF from ICTS (reply to ITU-D Q7/2 -SG2RGQ/200)     ITU-T SG 5     2020-07-13
[ 26 ]  
 
Relevance of the frequency band 10.6-10.7 GHz studies conducted under WRC-23 agenda item 1.15     Germany (Federal Republic of)   AI1.15   2020-07-06
[ 25 ]  
 
Outcome of the sixteenth meeting of the Chairmen and Vice-Chairmen of the Radiocommunication Study Groups, Working Parties and other Subordinate Groups     Director, BR     2020-06-25
[ 24 ]  
 
Preliminary position on WRC-23 agenda     World Meteorological Organization     2020-05-13
[ 23 ]  
 
Liaison statement to Working Parties 3M, 5A, 5C, 7C and 7D requesting characteristics for use in sharing studies under WRC-23 agenda item 1.13 (Working Party 5B for information and action if appropriate)     WP 7B   AI1.13   2020-04-28
[ 22 ]  
+Ann.1-14 
Report of the meeting of Working Party 7C (e-Meeting, 21-24 April 2020)     Chairman, WP 7C     2020-04-24
[ 21 ]  
 
Final List of Participants - Working Party 7C (E-meeting, 21-24 April 2020)     Director, BR     2020-04-24
[ 20 ]  
 
Report of Study Group 7 outcome (20 April 2020) relevant to Working Part 7C     Chairman, WP 7C     2020-04-21
[ 19 ]  
 
List of documents issued (Documents 7C/1 - 7C/20)     BR Study Groups Department     2020-04-17
[ 18 ]  
 
Proposed liaison statement to Working Party 5D (copy to Working Parties 5B, 4A and 7B)     France     2020-04-13
[ 17 ]  
 
Proposed draft reply liaison statement to Working Party 5D     Germany (Federal Republic of) , France     2020-04-14
[ 16 ]  
 
Proposed liaison statement to Working Party 5C     France     2020-04-13
[ 15 ]  
 
Working document toward a preliminary draft new Report ITU-R RS.[GROUND_PASS_SENSORS]     France , Switzerland (Confederation of)     2020-04-13
[ 14 ]  
 
Proposed liaison statement to Working Party 6A     France     2020-04-13
[ 13 ]  
 
Proposed liaison statement to Working Party 5A     France     2020-04-13
[ 12 ]  
 
Views on the need to update the preliminary draft revision of Recommendation ITU-R RS.1861 - Typical technical and operational characteristics of Earth exploration-satellite service (passive) systems using allocations between 1.4 and 275 GHz     United States of America     2020-04-13
[ 11 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B and 5C (copy to Working Parties 3J and 3M for information)     United States of America     2020-04-13
[ 10 ]  
 
Draft reply liaison statement to ITU-R Working Party 3J - Earth surface bistatic scattering coefficient prediction     European Space Agency     2020-04-14
[ 9 ]  
 
Draft reply liaison to Working Party 3J - Earth surface bistatic scattering coefficient prediction     Institute of Electrical and Electronics Engineers, Inc.     2020-04-10
[ 8 ]  
 
Lack of mutual planning between EESS (active) and RAS in design of the impending Earthcare 94 GHz cloud-profiling radar mission     Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science     2020-04-08
[ 7 ]  
 
Contribution to Working Parties 7A, 7B, 7C and 7D on relevant agenda item of WRC-23     Iran (Islamic Republic of)     2020-03-23
[ 6 ]  
(Rev.1) 
Organisation of the work of Working Party 7C     Chairman, WP 7C     2020-03-19
[ 5 ]  
 
Liaison statement to Working Parties 3K and 3M (for information to Working Parties 1B, 3J, 4A, 4B, 4C, 5A, 5B, 5C, 7B, 7C and 7D) - Preparations for WRC-23 agenda items 1.1 and 1.2     WP 5D   AI1.2, AI1.1   2020-03-06
[ 4 ]  
 
Liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 7B and 7C - Preparations for WRC-23 agenda item 1.2     WP 5D   AI1.2   2020-03-06
[ 3 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C, and 7D - Information for studies on WRC-23 agenda item 1.4     WP 5D   AI1.4   2020-03-06
[ 2 ]  
 
Reply liaison statement to ITU-R Working Party 5B (copy for information to Working Party 7C) - Deployment of Foreign Object Debris detection radars in the 92-100 GHz frequency range at airports globally     International Civil Aviation Organization     2020-03-02
[ 1 ]  
 
Documents to be carried over from the 2015-2019 study period     WP 7C     2019-10-31
Results:531 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-05-29