Contributions ![Documents / Contributions](/res/templates/dms/images/key.gif) |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 31 ]
|
Liaison statement to Working Party 7C - Protection of EESS (passive) systems operating in bands above 92 GHz and up to 174.8 GHz
|
WP 7C
|
|
2020-08-05 |
|
[ 30 ]
|
Reply liaison statement to Working Party 7C - Preparation for WRC-23 agenda item 1.14 - Radiodetermination and aeronautical characteristics in the frequency band 231.5-252 GHz
|
WP 5B
|
AI1.14
|
2020-07-27 |
|
[ 29 ]
|
Reply liaison statement to Working Party 7C - Preparation for WRC-23 agenda item 1.12 - Radiodetermination characteristics in or adjacent to the frequency band 40-50 MHz
|
WP 5B
|
AI1.12
|
2020-07-27 |
|
[ 28 ]
|
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)
|
Chairman, CCV
|
|
2020-07-14 |
|
[ 27 ]
|
Reply liaison statement on work being carried out in ITU-T SG5 on human exposure to EMF from ICTS (reply to ITU-D Q7/2 -SG2RGQ/200)
|
ITU-T SG 5
|
|
2020-07-13 |
|
[ 26 ]
|
Relevance of the frequency band 10.6-10.7 GHz studies conducted under WRC-23 agenda item 1.15
|
Germany (Federal Republic of)
|
AI1.15
|
2020-07-06 |
|
[ 25 ]
|
Outcome of the sixteenth meeting of the Chairmen and Vice-Chairmen of the Radiocommunication Study Groups, Working Parties and other Subordinate Groups
|
Director, BR
|
|
2020-06-25 |
|
[ 24 ]
|
Preliminary position on WRC-23 agenda
|
World Meteorological Organization
|
|
2020-05-13 |
|
[ 23 ]
|
Liaison statement to Working Parties 3M, 5A, 5C, 7C and 7D requesting characteristics for use in sharing studies under WRC-23 agenda item 1.13 (Working Party 5B for information and action if appropriate)
|
WP 7B
|
AI1.13
|
2020-04-28 |
|
[ 22 ]
+Ann.1-14 |
Report of the meeting of Working Party 7C (e-Meeting, 21-24 April 2020)
|
Chairman, WP 7C
|
|
2020-04-24 |
|
[ 21 ]
|
Final List of Participants - Working Party 7C (E-meeting, 21-24 April 2020)
|
Director, BR
|
|
2020-04-24 |
|
[ 20 ]
|
Report of Study Group 7 outcome (20 April 2020) relevant to Working Part 7C
|
Chairman, WP 7C
|
|
2020-04-21 |
|
[ 19 ]
|
List of documents issued (Documents 7C/1 - 7C/20)
|
BR Study Groups Department
|
|
2020-04-17 |
|
[ 18 ]
|
Proposed liaison statement to Working Party 5D (copy to Working Parties 5B, 4A and 7B)
|
France
|
|
2020-04-13 |
|
[ 17 ]
|
Proposed draft reply liaison statement to Working Party 5D
|
Germany (Federal Republic of)
,
France
|
|
2020-04-14 |
|
[ 16 ]
|
Proposed liaison statement to Working Party 5C
|
France
|
|
2020-04-13 |
|
[ 15 ]
|
Working document toward a preliminary draft new Report ITU-R RS.[GROUND_PASS_SENSORS]
|
France
,
Switzerland (Confederation of)
|
|
2020-04-13 |
|
[ 14 ]
|
Proposed liaison statement to Working Party 6A
|
France
|
|
2020-04-13 |
|
[ 13 ]
|
Proposed liaison statement to Working Party 5A
|
France
|
|
2020-04-13 |
|
[ 12 ]
|
Views on the need to update the preliminary draft revision of Recommendation ITU-R RS.1861 - Typical technical and operational characteristics of Earth exploration-satellite service (passive) systems using allocations between 1.4 and 275 GHz
|
United States of America
|
|
2020-04-13 |
|
[ 11 ]
|
Liaison statement to Working Parties 4A, 4C, 5A, 5B and 5C (copy to Working Parties 3J and 3M for information)
|
United States of America
|
|
2020-04-13 |
|
[ 10 ]
|
Draft reply liaison statement to ITU-R Working Party 3J - Earth surface bistatic scattering coefficient prediction
|
European Space Agency
|
|
2020-04-14 |
|
[ 9 ]
|
Draft reply liaison to Working Party 3J - Earth surface bistatic scattering coefficient prediction
|
Institute of Electrical and Electronics Engineers, Inc.
|
|
2020-04-10 |
|
[ 8 ]
|
Lack of mutual planning between EESS (active) and RAS in design of the impending Earthcare 94 GHz cloud-profiling radar mission
|
Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science
|
|
2020-04-08 |
|
[ 7 ]
|
Contribution to Working Parties 7A, 7B, 7C and 7D on relevant agenda item of WRC-23
|
Iran (Islamic Republic of)
|
|
2020-03-23 |
|
[ 6 ]
(Rev.1) |
Organisation of the work of Working Party 7C
|
Chairman, WP 7C
|
|
2020-03-19 |
|
[ 5 ]
|
Liaison statement to Working Parties 3K and 3M (for information to Working Parties 1B, 3J, 4A, 4B, 4C, 5A, 5B, 5C, 7B, 7C and 7D) - Preparations for WRC-23 agenda items 1.1 and 1.2
|
WP 5D
|
AI1.2, AI1.1
|
2020-03-06 |
|
[ 4 ]
|
Liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 7B and 7C - Preparations for WRC-23 agenda item 1.2
|
WP 5D
|
AI1.2
|
2020-03-06 |
|
[ 3 ]
|
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C, and 7D - Information for studies on WRC-23 agenda item 1.4
|
WP 5D
|
AI1.4
|
2020-03-06 |
|
[ 2 ]
|
Reply liaison statement to ITU-R Working Party 5B (copy for information to Working Party 7C) - Deployment of Foreign Object Debris detection radars in the 92-100 GHz frequency range at airports globally
|
International Civil Aviation Organization
|
|
2020-03-02 |
|
[ 1 ]
|
Documents to be carried over from the 2015-2019 study period
|
WP 7C
|
|
2019-10-31 |
Results:531 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11
|
Multiple Document Download: Formats and Languages to be included (when available):