International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A  C 

ITU-R WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:681 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 156 ]  
 
Liaison statement to ITU-R Working Party 4A and CIRM - WRC-15 Agenda item 1.8 - Broadband satellite earth stations aboard vessels (ESV)     International Maritime Organization     2013-02-28
[ 155 ]  
 
Liaison statement to JTG 4-5-6-7 (copy to Working Party 4A, Working Party 4B, Working Party 4C, Working Party 5A, Working Party 5B, Working Party 5C, Working Party 6A, Working Party 7B, Working Party 7C, Working Party 7D, Working Party 1A, Working Party 3K, Working Party 3M)     WP 5D     2013-02-18
[ 154 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to WPs 4A, 4B, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D, (WPs 1A, 3K, 3M)) - Suitable frequency ranges above 6 GHz     WP 5D     2013-02-18
[ 153 ]  
 
Liaison statement to ITU-R Working Party 4A - Compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments     WP 5D     2013-02-07
[ 152 ]  
 
Liaison statement to Study Groups 4, 5, 6 and 7 and Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D as concerned Groups for WRC-15 Agenda item 1.1 - Preparations for WRC-15 Agenda item 1.1 - Technical and operational characteristics     JTG 4-5-6-7     2012-12-06
[ 151 ]  
 
Liaison statement to Radiocommunication Study Group 4 - Result of the Study Group 5 meeting (19-20 November 2012) on a SF-series Recommendation     SG 5     2012-11-28
[ 150 ]  
 
Liaison statement to Working Parties 4A, 7B, 7C and 7D (copy to Working Parties 5B, 5C and 5D) - WRC-15 Agenda item 1.6 - Characteristics of and protection criteria for mobile systems operating in the frequency range 14.5-15.35 GHz     WP 5A     2012-11-20
[ 149 ]  
 
Liaison statement to ITU-R Working Party 4A (copy to Working Parties 3M and 7B for information) - WRC-15 Agenda item 1.9 issue 1.9.1     WP 5A     2012-11-20
[ 148 ]  
 
Liaison statement to Working Party 4A - Technical characteristics and protection criteria for the FSS in support of studies under WRC-15 Agenda item 1.17     WP 5B     2012-11-19
[ 147 ]  
 
Liaison statement to working Party 4A, 5C and 5D - WRC-15 Agenda item 1.6 - Technical characteristics of and protection criteria for aeronautical mobile systems operating in the frequency range 14.5-15.38     WP 5B     2012-11-19
[ 146 ]  
(Rev.1) 
Liaison statement to ITU-R Working Parties 4A, 4B and 4C - WRC-15 Agenda item 1.5     WP 5B     2012-11-19
[ 145 ]  
 
Liaison statement to ITU-R Working Party 4A - WRC-15 Agenda item 1.7 - Consideration of Resolution 114 (Rev.WRC-12) - Studies on compatibility between new systems of the aeronautical radionavigation service and the fixed-satellite service (Earth-to-space) (limited to feeder links of the non-geostationary mobile-satellite systems in the mobile-satellite service) in the frequency ..     WP 5B     2012-11-19
[ 144 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 and Study Group 4, 5, 6, and 7 - WRC-15 Agenda item 1.1 - Modelling considerations and other considerations for 5-6 GHz frequency range     WP 5B     2012-11-16
[ 143 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties (4A, 4B, 4C, 5B, 5C 5D, 6A, 7B, 7C, 7D 1A, 3K 3M) for information) - WRC-15 Agenda item 1.1 - Working Party 5A initial information on spectrum requirements studies for WRC-15 Agenda item 1.1     WP 5A     2012-11-16
[ 142 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties (4A, 4B, 4C 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) for information) - WRC-15 Agenda item 1.1 - Sharing considerations for the 5-6 GHz frequency range for WRC-15 Agenda item 1.1     WP 5A     2012-11-16
[ 141 ]  
 
Liaison statement to Working Party 4A - Review of SF-series Recommendations     WP 5C     2012-11-14
[ 140 ]  
 
Liaison statement to Working Party 4A and Working Party 4C - In relation to the I/N issue (AI 1.9.1, 1.9.2 and 1.10)     WP 5C     2012-11-14
[ 139 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 5A and 5B for information) WRC-15 Agenda item 1.6     WP 5C     2012-11-14
[ 138 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 4C, 5A, 5B, 7A, 7B, 7C and 7D for information) - WRC-15 Agenda item 1.8 - Possible review of the provisions relating to earth stations on board vessels in the 5 925-6 425 MHz and 14-14.5 GHz bands     WP 5C     2012-11-14
[ 137 ]  
 
Liaison statement to Working Parties 1A and 1B (for information to WPs 4A, 4B, 4C, 5A, 5B, 5D, 6A, 6B, 6C, 7B, 7C, 7D on further studies on cognitive radio systems (CRS))     WP 5C     2012-11-14
[ 136 ]  
(Rev.1) 
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to the relevant Working Parties of Study Groups 1, 3, 4, 5, 6 and 7) - WRC-15 Agenda item 1.1 operating characteristics of AMT systems     WP 5B     2012-11-09
[ 135 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 WRC-15 Agenda item 1.1 (copy to Working Parties 1A, 3K, 3M, 4A, 4B, 4C, 5A, 5C, 5D and 7C for information)     WP 5B     2012-11-09
[ 134 ]  
+Add.1 
Preliminary draft new Recommendation ITU-R BO.[IMPR_BSS_REF_ANT_DIAG] - Improved BSS receiving earth stations reference antenna radiation pattern for RR Appendix 30 Regions 1 and 3 systems     Bulgaria (Republic of)     2012-10-01
[ 133 ]  
 
Report of the eighth meeting of the Joint IMO/ITU Experts Group on maritime radiocommunication matters     International Maritime Organization     2012-10-18
[ 132 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 - Sharing parameters for WRC-15 Agenda item 1.2     WP 5D     2012-10-16
[ 131 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Party 4A, Working Party 5A, Working Party 5B, Working Party 6A)     WP 5D     2012-10-16
[ 130 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 - Initial information on spectrum requirements studies for WRC-15 Agenda item 1.1     WP 5D     2012-10-16
[ 129 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 on suitable frequency ranges under WRC-15 Agenda item 1.1     WP 5D     2012-10-16
[ 128 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 4C, 5A) - WRC-15 Agenda item 1.6     WP 7B, WP 7C and WP 7D     2012-10-10
[ 127 ]  
 
Liaison statement to Working Party 4A - WRC-15 Agenda item 1.6     WP 7B     2012-10-09
[ 126 ]  
 
Liaison statement to Working Party 4A and the Special Committee (copy for information to Working Parties 5A and 6A) - WRC-15 Agenda item 9.1.8     WP 7B     2012-10-09
[ 125 ]  
+Ann.1-22 
Report on the meeting of Working Party 4A (Geneva, 19-27 September 2012)     Chairman, WP 4A     2012-09-27
[ 124 ]  
 
Final List of Participants - Working Party 4A (Geneva, 19-27 September 2012)     Director, BR     2012-09-27
[ 123 ]  
 
Liaison statement to Working Party 4A - Preliminary draft new Report on VSATS     WP 4B     2012-09-21
[ 122 ]  
 
Liaison statement to Working Party 4A - Generic access procedure     WP 4B     2012-09-21
[ 121 ]  
 
List of documents issued     BR Study Groups Department     2012-09-18
[ 120 ]  
 
Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7A, 7B, 7C and 7D     WP 4C     2012-09-18
[ 119 ]  
 
Liaison statement to Working Party 4A - WRC-15 Agenda item 1.6     WP 4C     2012-09-17
[ 118 ]  
 
Liaison statement to Working Parties 4A, 5A, 5C, 7B (copy for information to Working Parties 3M, 4B, 5B) - WRC-15 Agenda item 1.9.2     WP 4C     2012-09-14
[ 117 ]  
 
Draft liaison statement to Working Party 5B - WRC-15 Agenda item 1.5     Asia Satellite Telecommunications Co. Ltd. (AsiaSat)     2012-09-12
[ 116 ]  
 
Working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the fixed-satellite service in Region 1 (GSO)     SES WORLD SKIES     2012-09-12
[ 115 ]  
 
Comment on Annex 18 to Working Party 4A Chairman's Report     Iran (Islamic Republic of)     2012-09-12
[ 114 ]  
 
Proposed revision of the working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the fixed-satellite service in Region 1 (GSO)     France , United Kingdom of Great Britain and Northern Ireland     2012-09-12
[ 113 ]  
 
Compatibility analysis between EESS(active) and FSS(Earth-to-Space) within the frequency band 13.25 13.75 GHz     France , European Organisation for the Exploitation of Meteorological Satellites , European Space Agency (ESA) , Germany (Federal Republic of) , United Kingdom of Great Britain and Northern Ireland     2012-09-12
[ 112 ]  
 
Proposed modification to working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz band for the fixed-satellite service in Regions 2 and 3 (GSO)     Asia Satellite Telecommunications Co. Ltd. (AsiaSat)     2012-09-12
[ 111 ]  
 
Primary consideration for a new allocation to the fixed-satellite service in the frequency bands 7 150-7 250 MHz (space-to-Earth) and 8 400-8 500 MHz (Earth-to-space)     China (People's Republic of)     2012-09-12
[ 110 ]  
 
WRC-15 Agenda item 9.1.2 - Studies on permissible interference level for coordination under No 9.7     Asia Satellite Telecommunications Co. Ltd. (AsiaSat)     2012-09-12
[ 109 ]  
 
Proposed liaison statement to Working Party 5D - Techniques designed to increase the potential for sharing between IMT systems and FSS networks in the 3 400-3 600 MHz band     Asia Satellite Telecommunications Co. Ltd. (AsiaSat)     2012-09-12
[ 108 ]  
 
Consideration of new allocations to the fixed-satellite service (FSS) in the range 10-17 GHz     Intelsat, LLC     2012-09-11
[ 107 ]  
 
Proposal to re-examine Annex 3 of RR Appendix 30     Slovenia (Republic of)     2012-09-11
Results:681 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-11-16