Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 315 ]
|
Working document on WRC-19 agenda item 1.5 - Preliminary draft new Report on compatibility of maritime ESIMs and the fixed and mobile services in the 27.5-29.5 GHz frequency band
|
United States of America
|
AI1.5
|
2017-04-26 |
|
[ 314 ]
|
Working document on WRC-19 agenda item 1.5 - Preliminary study material for the case of airborne ESIMs and the fixed and mobile services in the 27.5-29.5 GHz frequency band
|
United States of America
|
AI1.5
|
2017-04-26 |
|
[ 313 ]
|
Comments on the proposed harmonization of some of the provisions of Appendix 30B with those of Appendix 30/30A
|
Canada
|
AI7
|
2017-04-26 |
|
[ 312 ]
|
WRC-19 agenda item 1.6 - Considerations on non-GSO/GSO FSS sharing in the Q/V band
|
Canada
|
AI1.6
|
2017-04-26 |
|
[ 311 ]
|
Proposed updates to working document [TOWARDS A PRELIMINARY DRAFT NEW REPORT] on spectrum needs - WRC-19 agenda item 9.1, issue 9.1.9
|
Canada
|
AI9.1
|
2017-04-26 |
|
[ 310 ]
|
Bringing into use of frequency assignments to non-geostationary satellite networks or systems
|
Canada
|
AI7
|
2017-04-26 |
|
[ 309 ]
|
Proposed modifications to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue D: Identification of those specific satellite networks and systems with which coordination needs to be effected under RR Nos. 9.12A and 9.13 or 9.21
|
Canada
|
AI7
|
2017-04-26 |
|
[ 308 ]
|
Proposed new issue under WRC-19 agenda item 7 - Issue XX: Modifications to Appendix 4 data elements to be provided for non-Geostationary satellite networks/systems
|
Canada
|
AI7
|
2017-04-26 |
|
[ 307 ]
|
Study between non-geostationary FSS systems and EESS (passive) systems in the bands 36-37 GHz and 50.2-50.4 GHz
|
Canada
|
AI1.6
|
2017-04-26 |
|
[ 306 ]
|
FSS protection criteria to be used in sharing and compatibility studies for WRC-19 agenda item 1.13
|
GSMA
|
AI1.13
|
2017-04-26 |
|
[ 305 ]
|
Issue[XX]: Application of Paragraph 6.6 and 6.16 of Article 6 of Appendix 30B - WRC-19 agenda item 7
|
Iran (Islamic Republic of)
|
AI7
|
2017-04-26 |
|
[ 304 ]
|
Issue[Y]: Extension of the date of bringing into use of assignments due to force-majeure - Under WRC-19 agenda item 7
|
Iran (Islamic Republic of)
|
AI7
|
2017-04-26 |
|
[ 303 ]
|
Issue[X]: Establishment a facility to the administrations in order to observe their comments/objections under No. 9.51 and No. 9.52 for coordination under Nos.9.7 - WRC-19 agenda item 7
|
Iran (Islamic Republic of)
|
AI7
|
2017-04-26 |
|
[ 302 ]
|
Comments on Annex 24 to Working Party 4A Chairman's Report - Working document - Enhancement of the regulatory provisions of RR Appendix 30B to observe the principles based on which it was initially established - WRC-19 agenda item 7 - Issue F
|
Iran (Islamic Republic of)
|
AI7
|
2017-04-26 |
|
[ 301 ]
|
Issue [Z]: Frequency bands submitted under Article 6 for additional use - Under WRC-19 agenda item 7
|
Iran (Islamic Republic of)
|
AI7
|
2017-04-26 |
|
[ 300 ]
|
Comments to Annex 17 to Working Party 4A Chairman's Report - Working document on WRC-19 agenda item 1.5 - Preliminary study material for the case of airborne ESIMs and the fixed service in the 27.5-29.5 GHz frequency band
|
Iran (Islamic Republic of)
|
AI1.5
|
2017-04-26 |
|
[ 299 ]
|
Comments to Annex 16 to Working Party 4A Chairman's Report - Working document on WRC-19 agenda item 1.5 - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz
|
Iran (Islamic Republic of)
|
AI1.5
|
2017-04-26 |
|
[ 298 ]
|
Proposed liaison statement to Working Party 5A - Regarding WRC-19 agenda item 1.12
|
Thailand
|
AI1.12
|
2017-04-25 |
|
[ 297 ]
|
Characteristic for land earth stations in motion
|
France
,
Germany (Federal Republic of)
,
Norway
,
United Kingdom of Great Britain and Northern Ireland
|
|
2017-04-25 |
|
[ 296 ]
|
ESIM coexistence with other satellite services
|
France
,
Germany (Federal Republic of)
,
Luxembourg
,
Netherlands (Kingdom of the)
,
Norway
,
United Kingdom of Great Britain and Northern Ireland
|
AI1.5
|
2017-04-25 |
|
[ 295 ]
|
Draft CPM text for WRC-19 agenda item 1.5
|
France
,
Germany (Federal Republic of)
,
Netherlands (Kingdom of the)
,
Norway
,
United Kingdom of Great Britain and Northern Ireland
|
AI1.5
|
2017-04-25 |
|
[ 294 ]
|
Preliminary draft revision to Recommendation ITU-R S.1503: Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite system networks with limits contained in Article 22 of the Radio Regulations
|
United Kingdom of Great Britain and Northern Ireland
|
|
2017-04-25 |
|
[ 293 ]
|
Protection of existing BSS networks in the 37.2 W - 9E orbital arc implementing earth stations with antenna size smaller than 0.60 M
|
Sweden
|
|
2017-04-25 |
|
[ 292 ]
|
Some aspects of the proposed revision of paragraph 4.1.18 in Appendices 30 and 30A of the Radio Regulations
|
Bulgaria (Republic of)
|
AI7
|
2017-04-25 |
|
[ 291 ]
|
Examination results on reference antenna pattern for Regions 1 and 3 BSS receiving antennas in Annex 5 to Appendix 30 of the Radio Regulations
|
Bulgaria (Republic of)
|
Q293/4
|
2017-04-25 |
|
[ 290 ]
|
Protection criteria for sharing studies relating to WRC-19 - Agenda items 1.13 (IMT), 1.14 (HAPS) and 1.16 (RLAN)
|
United Arab Emirates
|
AI1.16, AI1.14, AI1.13
|
2017-04-25 |
|
[ 289 ]
|
Most sensitive and most interfering parameters for inter service sharing studies between FSS/BSS and other services - System parameters for FSS/BSS
|
United Arab Emirates
|
|
2017-04-25 |
|
[ 288 ]
|
Parameters for inter service sharing studies between FSS and RLAN services - System parameters for FSS
|
United Arab Emirates
|
|
2017-04-25 |
|
[ 287 ]
|
Revisions to working document [towards a preliminary draft new Report] on the protection of EESS (passive) and RAS systems from non-GSO satellite systems operating in the 37.5-42.5 GHz, 47.2-50.2 GHz and 50.4-51.4 GHz frequency bands under WRC-19 agenda item 1.6
|
United States of America
|
AI1.6
|
2017-04-24 |
|
[ 286 ]
|
Working document [towards a preliminary draft new Recommendation/Report] on a methodology to estimate the e.i.r.p. density levels of land-based earth stations in motion (ESIMs) to ensure compliance with coordination distance limits and power flux density limits with respect to fixed service stations operating in the 27.5-29.5 GHz frequency band
|
United States of America
|
AI1.5
|
2017-04-24 |
|
[ 285 ]
|
Proposed draft CPM text for WRC-19 agenda item 1.5
|
United States of America
|
AI1.5
|
2017-04-24 |
|
[ 284 ]
|
Revisions to Section 12 of the working document on WRC-19 agenda item 1.5, operation of earth stations in motion (ESIMs) communicating with geostationary space stations in the fixed-satellite service into other services operating in the 27.5-29.5 GHz frequency band
|
United States of America
|
AI1.5
|
2017-04-24 |
|
[ 283 ]
|
Proposed revisions to Annex 18 to Document 4A/196
|
United States of America
|
AI1.5
|
2017-04-24 |
|
[ 282 ]
|
Addressing the six month resubmission period in RR No. 11.46
|
United States of America
|
|
2017-04-24 |
|
[ 281 ]
|
A regulatory question concerning satellite-to-satellite links certain FSS (Earth-to-space) bands from LEO/MEO non-GSO systems to FSS space stations in the geostationary arc
|
United States of America
|
|
2017-04-24 |
|
[ 280 ]
|
Input on working document - Updating the reference situation for networks under RR Appendices 30 and 30A when provisionally recorded assignments are converted into definitive recorded assignments - WRC-19 agenda item 7 - Issue G
|
United States of America
|
AI7
|
2017-04-21 |
|
[ 279 ]
|
Proposal related to WRC-19 agenda item 7 - Issue F
|
United States of America
|
AI7
|
2017-04-21 |
|
[ 278 ]
|
Proposal related to WRC-19 agenda item 7 - Issue E
|
United States of America
|
AI7
|
2017-04-21 |
|
[ 277 ]
|
Working document towards a preliminary draft new Recommendation/Report on interference considerations for Bi-Directional use of the 6 725-7 025 MHz band by non-geostationary Fixed-Satellite Service systems
|
United States of America
|
AI9.1
|
2017-04-21 |
|
[ 276 ]
|
Working document toward a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the bringing into use of frequency assignments to non-GSO FSS satellite networks/systems
|
United States of America
|
|
2017-04-21 |
|
[ 275 ]
|
Updates to working document [towards a preliminary draft new Recommendation/Report] ITU-R S.[NGSO_6/4GHz] on technical and regulatory studies for 6/4 GHz GSO/non-GSO FSS sharing - WRC-19 agenda item 9.1, issue 9.1.3
|
United States of America
|
AI9.1
|
2017-04-21 |
|
[ 274 ]
|
Proposed updates to working document [towards a preliminary draft new Report/Recommendation] on sharing between 50/40 GHz GSO and non-GSO systems - WRC-19 agenda item 1.6
|
United States of America
|
|
2017-04-21 |
|
[ 273 ]
|
Proposed preliminary CPM text for WRC-19 agenda item 1.6
|
United States of America
|
|
2017-04-21 |
|
[ 272 ]
|
Proposed working document towards a preliminary draft new Recommendation ITU-R S.[50/40 GHz FSS SHARING]
|
United States of America
|
AI1.6
|
2017-04-21 |
|
[ 271 ]
|
Work document toward a draft new Report ITU-R S.[ESIM] - Operation of Earth Stations In Motion (ESIM) in Fixed-Satellite Service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz - Protection criteria for feeder links of the MSS in the bands 19.3-19.7 GHz and 29.1-29.5 GHz
|
United States of America
|
|
2017-04-21 |
|
[ 270 ]
|
Proposed revisions to the working document towards a preliminary draft new Report ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev. WRC-12) in the 11.7-12.7 GHz band for the GSO broadcasting -satellite service in all Regions
|
United States of America
|
|
2017-04-21 |
|
[ 269 ]
|
Working document towards a preliminary draft new Report ITU-R S.[INTRF MGMT VSAT IN 27.5-30 GHz] - Uplink interference associated with closely separated GSO FSS VSAT networks in the 27.5-30 GHz frequency band
|
Australia
|
|
2017-04-21 |
|
[ 268 ]
|
Updating the reference situation for networks under Appendix 30 and 30A when provisional recording is used - WRC-19 agenda item 7
|
Netherlands (Kingdom of the)
|
AI7
|
2017-04-20 |
|
[ 267 ]
|
FSS/BSS technical parameters for sharing studies under WRC-19 agenda items 1.13 and 1.14
|
United States of America
|
AI1.14, AI1.13
|
2017-04-20 |
|
[ 266 ]
|
List of affected frequency assignments for satellite networks identified under No. 9.36.2 of the Radio Regulations (agenda item 7, issue D)
|
Director, BR
|
|
2017-04-20 |
Results:915 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):