International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A  C 

ITU-R WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:915 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 315 ]  
 
Working document on WRC-19 agenda item 1.5 - Preliminary draft new Report on compatibility of maritime ESIMs and the fixed and mobile services in the 27.5-29.5 GHz frequency band     United States of America   AI1.5   2017-04-26
[ 314 ]  
 
Working document on WRC-19 agenda item 1.5 - Preliminary study material for the case of airborne ESIMs and the fixed and mobile services in the 27.5-29.5 GHz frequency band     United States of America   AI1.5   2017-04-26
[ 313 ]  
 
Comments on the proposed harmonization of some of the provisions of Appendix 30B with those of Appendix 30/30A     Canada   AI7   2017-04-26
[ 312 ]  
 
WRC-19 agenda item 1.6 - Considerations on non-GSO/GSO FSS sharing in the Q/V band     Canada   AI1.6   2017-04-26
[ 311 ]  
 
Proposed updates to working document [TOWARDS A PRELIMINARY DRAFT NEW REPORT] on spectrum needs - WRC-19 agenda item 9.1, issue 9.1.9     Canada   AI9.1   2017-04-26
[ 310 ]  
 
Bringing into use of frequency assignments to non-geostationary satellite networks or systems     Canada   AI7   2017-04-26
[ 309 ]  
 
Proposed modifications to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue D: Identification of those specific satellite networks and systems with which coordination needs to be effected under RR Nos. 9.12A and 9.13 or 9.21     Canada   AI7   2017-04-26
[ 308 ]  
 
Proposed new issue under WRC-19 agenda item 7 - Issue XX: Modifications to Appendix 4 data elements to be provided for non-Geostationary satellite networks/systems     Canada   AI7   2017-04-26
[ 307 ]  
 
Study between non-geostationary FSS systems and EESS (passive) systems in the bands 36-37 GHz and 50.2-50.4 GHz     Canada   AI1.6   2017-04-26
[ 306 ]  
 
FSS protection criteria to be used in sharing and compatibility studies for WRC-19 agenda item 1.13     GSMA   AI1.13   2017-04-26
[ 305 ]  
 
Issue[XX]: Application of Paragraph 6.6 and 6.16 of Article 6 of Appendix 30B - WRC-19 agenda item 7     Iran (Islamic Republic of)   AI7   2017-04-26
[ 304 ]  
 
Issue[Y]: Extension of the date of bringing into use of assignments due to force-majeure - Under WRC-19 agenda item 7     Iran (Islamic Republic of)   AI7   2017-04-26
[ 303 ]  
 
Issue[X]: Establishment a facility to the administrations in order to observe their comments/objections under No. 9.51 and No. 9.52 for coordination under Nos.9.7 - WRC-19 agenda item 7     Iran (Islamic Republic of)   AI7   2017-04-26
[ 302 ]  
 
Comments on Annex 24 to Working Party 4A Chairman's Report - Working document - Enhancement of the regulatory provisions of RR Appendix 30B to observe the principles based on which it was initially established - WRC-19 agenda item 7 - Issue F     Iran (Islamic Republic of)   AI7   2017-04-26
[ 301 ]  
 
Issue [Z]: Frequency bands submitted under Article 6 for additional use - Under WRC-19 agenda item 7     Iran (Islamic Republic of)   AI7   2017-04-26
[ 300 ]  
 
Comments to Annex 17 to Working Party 4A Chairman's Report - Working document on WRC-19 agenda item 1.5 - Preliminary study material for the case of airborne ESIMs and the fixed service in the 27.5-29.5 GHz frequency band     Iran (Islamic Republic of)   AI1.5   2017-04-26
[ 299 ]  
 
Comments to Annex 16 to Working Party 4A Chairman's Report - Working document on WRC-19 agenda item 1.5 - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz     Iran (Islamic Republic of)   AI1.5   2017-04-26
[ 298 ]  
 
Proposed liaison statement to Working Party 5A - Regarding WRC-19 agenda item 1.12     Thailand   AI1.12   2017-04-25
[ 297 ]  
 
Characteristic for land earth stations in motion     France , Germany (Federal Republic of) , Norway , United Kingdom of Great Britain and Northern Ireland     2017-04-25
[ 296 ]  
 
ESIM coexistence with other satellite services     France , Germany (Federal Republic of) , Luxembourg , Netherlands (Kingdom of the) , Norway , United Kingdom of Great Britain and Northern Ireland   AI1.5   2017-04-25
[ 295 ]  
 
Draft CPM text for WRC-19 agenda item 1.5     France , Germany (Federal Republic of) , Netherlands (Kingdom of the) , Norway , United Kingdom of Great Britain and Northern Ireland   AI1.5   2017-04-25
[ 294 ]  
 
Preliminary draft revision to Recommendation ITU-R S.1503: Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite system networks with limits contained in Article 22 of the Radio Regulations     United Kingdom of Great Britain and Northern Ireland     2017-04-25
[ 293 ]  
 
Protection of existing BSS networks in the 37.2 W - 9E orbital arc implementing earth stations with antenna size smaller than 0.60 M     Sweden     2017-04-25
[ 292 ]  
 
Some aspects of the proposed revision of paragraph 4.1.18 in Appendices 30 and 30A of the Radio Regulations     Bulgaria (Republic of)   AI7   2017-04-25
[ 291 ]  
 
Examination results on reference antenna pattern for Regions 1 and 3 BSS receiving antennas in Annex 5 to Appendix 30 of the Radio Regulations     Bulgaria (Republic of)   Q293/4   2017-04-25
[ 290 ]  
 
Protection criteria for sharing studies relating to WRC-19 - Agenda items 1.13 (IMT), 1.14 (HAPS) and 1.16 (RLAN)     United Arab Emirates   AI1.16, AI1.14, AI1.13   2017-04-25
[ 289 ]  
 
Most sensitive and most interfering parameters for inter service sharing studies between FSS/BSS and other services - System parameters for FSS/BSS     United Arab Emirates     2017-04-25
[ 288 ]  
 
Parameters for inter service sharing studies between FSS and RLAN services - System parameters for FSS     United Arab Emirates     2017-04-25
[ 287 ]  
 
Revisions to working document [towards a preliminary draft new Report] on the protection of EESS (passive) and RAS systems from non-GSO satellite systems operating in the 37.5-42.5 GHz, 47.2-50.2 GHz and 50.4-51.4 GHz frequency bands under WRC-19 agenda item 1.6     United States of America   AI1.6   2017-04-24
[ 286 ]  
 
Working document [towards a preliminary draft new Recommendation/Report] on a methodology to estimate the e.i.r.p. density levels of land-based earth stations in motion (ESIMs) to ensure compliance with coordination distance limits and power flux density limits with respect to fixed service stations operating in the 27.5-29.5 GHz frequency band     United States of America   AI1.5   2017-04-24
[ 285 ]  
 
Proposed draft CPM text for WRC-19 agenda item 1.5     United States of America   AI1.5   2017-04-24
[ 284 ]  
 
Revisions to Section 12 of the working document on WRC-19 agenda item 1.5, operation of earth stations in motion (ESIMs) communicating with geostationary space stations in the fixed-satellite service into other services operating in the 27.5-29.5 GHz frequency band     United States of America   AI1.5   2017-04-24
[ 283 ]  
 
Proposed revisions to Annex 18 to Document 4A/196     United States of America   AI1.5   2017-04-24
[ 282 ]  
 
Addressing the six month resubmission period in RR No. 11.46     United States of America     2017-04-24
[ 281 ]  
 
A regulatory question concerning satellite-to-satellite links certain FSS (Earth-to-space) bands from LEO/MEO non-GSO systems to FSS space stations in the geostationary arc     United States of America     2017-04-24
[ 280 ]  
 
Input on working document - Updating the reference situation for networks under RR Appendices 30 and 30A when provisionally recorded assignments are converted into definitive recorded assignments - WRC-19 agenda item 7 - Issue G     United States of America   AI7   2017-04-21
[ 279 ]  
 
Proposal related to WRC-19 agenda item 7 - Issue F     United States of America   AI7   2017-04-21
[ 278 ]  
 
Proposal related to WRC-19 agenda item 7 - Issue E     United States of America   AI7   2017-04-21
[ 277 ]  
 
Working document towards a preliminary draft new Recommendation/Report on interference considerations for Bi-Directional use of the 6 725-7 025 MHz band by non-geostationary Fixed-Satellite Service systems     United States of America   AI9.1   2017-04-21
[ 276 ]  
 
Working document toward a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the bringing into use of frequency assignments to non-GSO FSS satellite networks/systems     United States of America     2017-04-21
[ 275 ]  
 
Updates to working document [towards a preliminary draft new Recommendation/Report] ITU-R S.[NGSO_6/4GHz] on technical and regulatory studies for 6/4 GHz GSO/non-GSO FSS sharing - WRC-19 agenda item 9.1, issue 9.1.3     United States of America   AI9.1   2017-04-21
[ 274 ]  
 
Proposed updates to working document [towards a preliminary draft new Report/Recommendation] on sharing between 50/40 GHz GSO and non-GSO systems - WRC-19 agenda item 1.6     United States of America     2017-04-21
[ 273 ]  
 
Proposed preliminary CPM text for WRC-19 agenda item 1.6     United States of America     2017-04-21
[ 272 ]  
 
Proposed working document towards a preliminary draft new Recommendation ITU-R S.[50/40 GHz FSS SHARING]     United States of America   AI1.6   2017-04-21
[ 271 ]  
 
Work document toward a draft new Report ITU-R S.[ESIM] - Operation of Earth Stations In Motion (ESIM) in Fixed-Satellite Service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz - Protection criteria for feeder links of the MSS in the bands 19.3-19.7 GHz and 29.1-29.5 GHz     United States of America     2017-04-21
[ 270 ]  
 
Proposed revisions to the working document towards a preliminary draft new Report ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev. WRC-12) in the 11.7-12.7 GHz band for the GSO broadcasting -satellite service in all Regions     United States of America     2017-04-21
[ 269 ]  
 
Working document towards a preliminary draft new Report ITU-R S.[INTRF MGMT VSAT IN 27.5-30 GHz] - Uplink interference associated with closely separated GSO FSS VSAT networks in the 27.5-30 GHz frequency band     Australia     2017-04-21
[ 268 ]  
 
Updating the reference situation for networks under Appendix 30 and 30A when provisional recording is used - WRC-19 agenda item 7     Netherlands (Kingdom of the)   AI7   2017-04-20
[ 267 ]  
 
FSS/BSS technical parameters for sharing studies under WRC-19 agenda items 1.13 and 1.14     United States of America   AI1.14, AI1.13   2017-04-20
[ 266 ]  
 
List of affected frequency assignments for satellite networks identified under No. 9.36.2 of the Radio Regulations (agenda item 7, issue D)     Director, BR     2017-04-20
Results:915 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2019-10-18