International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5A  C 

ITU-R WP5A

Land mobile service above 30 MHz*(excluding IMT); wireless access in the fixed service; amateur and amateur-satellite services

Results:1092 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 492 ]  
 
Reply liaison statement to Working Party 7D (copy for information to Working Parties 1B, 4A, 4C, 5A, 5B, 6A, 7B, and 7C) - Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[SHARING-METHODS] - Methods for sharing between radiocommunication services     WP 1A     2017-07-10
[ 491 ]  
 
Liaison statement to ITU-R Working Parties 3J, 3K, 3M, 5A, 5C, 7C and 7D on the preparations for WRC-19 agenda item 1.15 - Request for input as related to WRC-19 agenda item 1.15     WP 1A   AI1.15   2017-07-10
[ 490 ]  
 
Liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 6A, 7A, 7B, 7C & 7D on Resolution 63 (Rev. WRC-12)     WP 1A     2017-07-10
[ 489 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A and 5D - New Report ITU-R SM.2404-0 (ex. [REGULATORY TOOLS]) - Regulatory tools to support enhanced shared use of the spectrum     WP 1B   Q208/1   2017-07-10
[ 488 ]  
 
Liaison statement to APT and ITU-R Working Parties 5A and 5D - New Report ITU-R SM.2405-0 (ex.[CRS SPECTRUM MANAGEMENT CHALLENGES]) - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities     WP 1B     2017-07-10
[ 487 ]  
 
Liaison statement to ITU-R Working Parties 5A and 5D and ITU-T Study Group 20 - Work on WRC-19 agenda item 9.1, issue 9.1.8     WP 1B   AI9.1   2017-07-10
[ 486 ]  
 
Reply liaison statement to Working Party 1A (copy for information to Working Parties 3L, 5A, 5B, 5C, 6A, 7A and 7D) - Assessment of the impact of unwanted radio frequency energy generated by non-radiocommunication equipment to radiocommunication services     WP 1C     2017-07-07
[ 485 ]  
 
Liaison statement to ITU-D Study Group 2, ITU-T Study Group 5 and ITU-R Working Parties 4A, 5A, 5B, 5C, 5D on a preliminary draft new Report ITU-R SM.[EMF-MON] - Electromagnetic field measurements to assess human exposure     WP 1C     2017-07-07
[ 484 ]  
 
Liaison Statement on new Supplement on the framework of disaster management     ITU-T SG 15     2017-07-07
[ 483 ]  
 
Liaison statement to Working Party 3K on propagation characteristics in the 275-450 GHz band (copy to Working Parties 3J, 3M, 5A, 5C, 7C and 7D for information)     WP 1A   AI1.15   2017-07-05
[ 482 ]  
 
Liaison statement on information about work being carried out under study in ITU-T Question 3/5     ITU-T SG 5     2017-06-23
[ 481 ]  
 
Liaison statement to Working Party 7C and 7D (copy to Working Party 5A) - Foreign Object Debris (FOD) detection system operating in the band 92-100 GHz     WP 5B     2017-06-22
[ 480 ]  
 
Liaison statement to Working Party 5A (copy Working Party 4A) - Technical and operational characteristics for aeronautical mobile service systems limited to aircraft transmissions of telemetry for flight testing in the band 5 150-5 250 MHz     WP 5B     2017-06-19
[ 479 ]  
 
Liaison statement to Working Party 5A - Technical and operational characteristics for revision of Recommendation ITU-R M.1849-1     WP 5B   AI1.16   2017-06-16
[ 478 ]  
 
Liaison statement to Working Party 5A - Revision of Recommendation ITU-R M.2057-0     WP 5B     2017-06-16
[ 477 ]  
 
Liaison statement to Working Parties 1A and 7C (copy to Working Parties 3K, 5A and 7D for information) - WRC-19 agenda item 1.15     WP 5C   AI1.15   2017-06-01
[ 476 ]  
 
Reply liaison statement to Working Party 7C (copied to Working Parties 5A and 5B for information) - Technical and operational characteristics for fixed wireless systems operating within the 40-50 MHz frequency range     WP 5C     2017-06-05
[ 475 ]  
 
Liaison statement to ITU-R Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5D, 7B,7C, 7D and Task Group 5/1 - WRC-19 agenda item 1.14     WP 5C   AI1.14   2017-06-05
[ 474 ]  
 
Liaison statement to Working Party 5A - ITU-R Resolution 155 (WRC-15) implementation     WP 5B     2017-06-05
[ 473 ]  
 
Reply liaison statement to Working Party 5A - WRC-19 agenda item 9.1, issue 9.1.5     WP 5B   AI9.1   2017-06-05
[ 472 ]  
 
Reply liaison statement to Working Party 1A and 1B (copied for information to Working Parties 5A and 5C) - Wireless power transmission     WP 5B     2017-06-05
[ 471 ]  
 
Liaison statement to Working Party 5A (copy Task Group 5/1 for information) - Revision of Recommendation ITU-R F.1336-4 - Reference radiation patterns of omnidirectional, sectoral and low gain other directional antennas for the fixed and mobile services for use in sharing studies in the frequency range from 400 MHz to about 70 GHz     WP 5C     2017-06-02
[ 470 ]  
 
Liaison statement to Working Party 4A (copy for information to Working Party 5A) - Fixed service technical and operational characteristics and protection criteria for use in sharing studies under WRC-19 agenda item 1.5     WP 5C   AI1.5   2017-06-02
[ 469 ]  
+Ann.1-38 
Report on the eighteenth meeting of Working Party 5A (Geneva, 22 May - 1 June 2017)     Chairman, WP 5A     2017-06-01
[ 468 ]  
 
Final List of Participants - Working Party 5A (Geneva, 22 May - 1 June 2017)     Director, BR     2017-06-01
[ 467 ]  
 
Report on the relevant activities in certain countries in Region 3     Liaison Rapporteur     2017-06-01
[ 466 ]  
 
Report on relevant activities in certain countries in Region 1     Liaison Rapporteur     2017-05-25
[ 465 ]  
 
Report on the recent activities of Wireless World Research Forum (WWRF)     WWRF Liaison Rapporteur     2017-05-24
[ 464 ]  
 
List of documents issued (Documents 5A/285 - 5A/296 carried forward from the last WP 5A meeting) and (Documents 5A/298 - 5A/464)     BR Study Groups Department     2017-05-19
[ 463 ]  
 
Liaison statement to Working Parties 4C, 5A and 7B - Modifications to RR Appendix 4 data elements to be provided for non-geostationary satellite networks/systems     WP 4A     2017-05-19
[ 462 ]  
 
Liaison statement to Working Party 5A (copy to Working Party 4B for information) - FSS/BSS technical parameters for sharing studies under WRC-19 agenda item 1.16 (RLAN)     WP 4A   AI1.16   2017-05-19
[ 461 ]  
 
Reply liaison statement to Working Party 5A - WRC-19 agenda item 9.1, issue 9.1.3     WP 4A   AI9.1   2017-05-19
[ 460 ]  
 
Liaison statement to working Parties 5A, 5C, 5D, 7C and 7D (copy to Working Parties 4B and 3M) - WRC-19 agenda item 9.1, issue 9.1.9     WP 4A   AI9.1   2017-05-19
[ 459 ]  
 
Reply liaison statement to Working Parties 5A, 5C and 5D - Status of the working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA]     WP 4A     2017-05-19
[ 458 ]  
 
Reply liaison statement to Working Party 1B on the progress towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] (copy for information to Working Parties 4C, 5A, 5C and 5D) - Regulatory tools to support enhanced shared use of the spectrum     WP 4A     2017-05-19
[ 457 ]  
 
Liaison statement to Working Party 5A - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz     WP 4A     2017-05-19
[ 456 ]  
 
Liaison statement to Working Parties 4C, 5A and 7B - Inconsistency between filed RR Appendix 4 C/N objectives and other technical parameters     WP 4A     2017-05-19
[ 455 ]  
 
Liaison statement to Working Party 5A - Study of intelligent transport system applications under WRC-19 agenda item 1.12     WP 4A     2017-05-19
[ 454 ]  
 
Liaison Statement from ITU-D Study Group 1 and the ITU-D/ITU-R Joint Group on WTDC Resolution 9 to ITU-R Working Parties 1B, 1C, 5A and 5D on the Report on WTDC Resolution 9     ITU-D SG 1, ITU-R/ITU-T JG on WTDC Res.9     2017-05-18
[ 453 ]  
 
Liaison statement from TDAG to RAG and ITU-R Study Groups 1 and 5 on cooperation and coordination between ITU-R and ITU-D on WTDC Resolution 9 (Rev. Dubai, 2014)     TDAG     2017-05-18
[ 452 ]  
 
Information Note to Working Parties 5A, 5B, 5C and 5D - Protection criteria of the fixed and mobile services for the VHF/UHF multilateral coordination in the Central American and Caribbean areas     Director, BR     2017-05-16
[ 451 ]  
 
This document has been withdrawn     Nigeria (Federal Republic of)     2017-05-15
[ 450 ]  
 
Proposed modifications to the working document towards a preliminary draft new Report M.[RLAN REQ-PAR] - "Technical characteristics and operational requirements of WAS/RLAN in the 5 GHz frequency range"     Al Yah Satellite Communications (YahSat) , EMEA Satellite Operators Association (ESOA)   AI1.16   2017-05-15
[ 449 ]  
 
Working document towards a preliminary draft new Report ITU-R M.[RLAN SHARING] - Sharing and compatibility studies of WAS/RLAN in the 5 GHz frequency range     Al Yah Satellite Communications (YahSat) , EMEA Satellite Operators Association (ESOA)   AI1.16   2017-05-15
[ 448 ]  
 
Proposal for a working document towards a preliminary draft new Recommendation ITU-R [RSTT_FRQ] - Harmonisation of frequencies and related arrangements for existing and future railway radiocommunications systems between train and tracksides in accordance with ITU-R Report M.[RSTT]     Germany (Federal Republic of)   AI1.11   2017-05-15
[ 447 ]  
 
Proposal for a working document toward a preliminary draft new Recommendation ITU-R M.[ITS_FRQ] - Harmonisation of frequency arrangements for specific ITS pertaining to the exchange of information to improve traffic management and assisting safe driving     Germany (Federal Republic of)   AI1.12   2017-05-15
[ 446 ]  
 
Revisions on working document toward a preliminary draft new Report ITU-R M.[ITS_USAGE] - Intelligent transport systems (ITS) usage in ITU Member States     Germany (Federal Republic of)   AI1.12   2017-05-15
[ 445 ]  
 
Working document towards a preliminary draft new Report M.[IOT/M2M_USAGE]     Germany (Federal Republic of)   AI9.1   2017-05-15
[ 444 ]  
 
Revision to Annex 8 to Working Party 5A Chairman's Report - Preliminary draft CPM text for WRC-19 agenda item 1.12     Luxembourg     2017-05-15
[ 443 ]  
 
Proposal for updates of the CPM text agenda item 1.16 (WAS/RLAN)     Luxembourg   AI1.16   2017-05-15
Results:1092 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2021-01-11