Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 302 ]
(Rev.1) |
Re-review of C261 (K.21 contribution)
|
Bourns Limited
|
Q2/5
|
2018-07-06 |
|
[ 301 ]
(Rev.1) |
Re-review of C244 (K.20 contribution)
|
Bourns Limited
|
Q2/5
|
2018-07-06 |
|
[ 300 ]
|
Re-review of C243 (K.44 contribution)
|
Bourns Limited
|
Q2/5
|
2018-07-06 |
|
[ 299 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part 9: Proposal consolidation of C291 to C298
|
Bourns Limited
|
Q2/5
|
2018-07-05 |
|
[ 298 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part 8: Updating K.44 for 400 V d.c. powering
|
Bourns Limited
|
Q2/5
|
2018-07-04 |
|
[ 297 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part 7: Test circuit figure to replace K.44 Figure A.6.6-2, Figure A.6.6-1a and Figure A.6.6-1b.
|
Bourns Limited
|
Q2/5
|
2018-07-03 |
|
[ 296 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part 6: Review of 7.8 and 7.9 test entries (K.20 and K.21)
|
Bourns Limited
|
Q2/5
|
2018-07-03 |
|
[ 295 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part 5: Review of DC power feed surge test figures of Table 1b (K.20, K.21 and K.45)
|
Bourns Limited
|
Q2/5
|
2018-07-02 |
|
[ 294 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part 4: DC power feed tests of Tables 1a and 1b (K.20, K.21 and K.45)
|
Bourns Limited
|
Q2/5
|
2018-07-01 |
|
[ 293 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part 3: Powering supply configurations
|
Bourns Limited
|
Q2/5
|
2018-06-30 |
|
[ 292 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part 2: Grid terms review
|
Bourns Limited
|
Q2/5
|
2018-06-30 |
|
[ 291 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part1 Background
|
Bourns Limited
|
Q2/5
|
2018-06-29 |
|
[ 290 ]
|
Proposed new work item on Opportunities of the Circular Economy of E-waste management
|
Rwanda
,
Senegal
|
Q7/5
|
2018-06-28 |
|
[ 289 ]
(Rev.1) |
Proposed new work item on Adequate Assessment and Sensitization on the Impact of Counterfeit Electronics Products on the environment in Africa
|
Kenya
,
Rwanda
,
Tanzania
,
Uganda
|
Q7/5
|
2018-06-28 |
|
[ 288 ]
|
Regional e-waste management strategy for the East African Region
|
Kenya
,
Rwanda
,
Uganda
|
Q7/5
|
2018-06-28 |
|
[ 287 ]
|
End of life Management (EoL) management of communications equipment and products
|
Uganda Communications Commission (UCC)
|
Q7/5
|
2018-06-28 |
|
[ 286 ]
|
Social aspects in the management of e-waste
|
Ministry of Communications and Information Technology (MCIT) (Egypt)
|
Q7/5
|
2018-06-28 |
|
[ 285 ]
|
The Role of Policy, Regulations, Standards in E-Waste Management (Case Study Rwanda)
|
Rwanda
|
Q7/5
|
2018-06-28 |
|
[ 284 ]
|
Extended producer responsibility in developing countries and countries with economies in transition
|
Uganda Communications Commission (UCC)
|
Q7/5
|
2018-06-28 |
|
[ 283 ]
|
Smart Technology for Smart & Sustainable Agriculture in the Arab Region
|
Arab Information and Communication Technology Organization (AICTO)
|
Q9/5
|
2018-06-27 |
|
[ 282 ]
|
Comparison of accreditation standards for e-waste recyclers
|
Ministry of Communications and Information Technology (MCIT) (Egypt)
,
Palestine Technical University Kadoorie (State of Palestine)
,
Sudan
|
Q7/5
|
2018-06-27 |
|
[ 281 ]
|
Proposed new work item on Sustainable management of batteries resulting from ICT equipment Sustainable management of batteries resulting from ICT equipment
|
Kenya
,
Ministry of Communications and Information Technology (MCIT) (Egypt)
,
Palestine Technical University Kadoorie (State of Palestine)
,
Sudan
,
Uganda Communications Commission (UCC)
|
Q7/5
|
2018-06-27 |
|
[ 280 ]
|
Experimental Pilot Plant on e-Waste for Smart Cities based on the circular economy
|
Argentina
|
Q7/5
|
2018-06-26 |
|
[ 279 ]
|
Electromagnetic field measurements to assess human exposure for 5G (IMT 2020) base station
|
Agencia Nacional del Espectro (ANE) (Colombia)
|
Q3/5
|
2018-06-26 |
|
[ 278 ]
|
Integration of K-series ITU T Recommendations for the regulation of compliance with electromagnetic field exposure levels in the Republic of Colombia
|
Agencia Nacional del Espectro (ANE) (Colombia)
|
Q3/5
|
2018-06-26 |
|
[ 277 ]
|
Proposed new work item on K.Small - "Small base stations - impact on the overall exposure level"
|
Argentina
|
Q3/5
|
2018-05-09 |
|
[ 276 ]
|
Proposed new work item on K.reflection - "Impact of the metallic structures for the EMF exposure level"
|
Argentina
|
Q3/5
|
2018-05-09 |
|
[ 275 ]
|
Proposed new work item on K.peak - "Comparison between peak and real exposure in the long term considerations"
|
Argentina
|
Q3/5
|
2018-05-09 |
|
[ 274 ]
|
Proposed new work item on ITU-T K.Zones - "Guidance on Determining the Compliance Boundaries (the exclusion zone) of a Live Antenna"
|
Argentina
|
Q3/5
|
2018-05-09 |
|
[ 273 ]
|
Proposed new work item on K.dosimeter - "Personal dosimeters as a device in assessing human exposure to EMF"
|
Argentina
|
Q3/5
|
2018-05-09 |
|
[ 272 ]
(Rev.1) |
IEC 60617 compliance and PoE testing
|
Bourns Limited
|
Q2/5
|
2018-05-08 |
|
[ 271 ]
(Rev.1-2) |
Insulation co-ordination and IEEE 802.3 insulation tests
|
Bourns Limited
|
Q2/5
|
2018-05-08 |
|
[ 270 ]
(Rev.1) |
IP PoE camera systems - Bridging Functional Insulation - implications and system consequences
|
Bourns Limited
|
Q2/5, Q1/5
|
2018-05-08 |
|
[ 269 ]
|
Clarification needed on PoE testing - topics for discussion
|
Bourns Limited
|
Q2/5
|
2018-05-08 |
|
[ 268 ]
(Rev.1) |
Draft ITU-T Recommendation K.Radio.EMC - Electromagnetic Compatibility requirement for radio telecommunication equipment
|
Nokia Corporation
|
Q4/5
|
2018-05-08 |
|
[ 267 ]
|
Referencing Figure 6.7-3 given in the ITU-T K.44
|
Bourns Limited
|
Q2/5
|
2018-05-08 |
|
[ 266 ]
|
Adequate assessment and sensitization on possible human exposure to RF EMF radiation around telecommunications installations
|
Uganda Communications Commission (UCC)
|
Q3/5
|
2018-05-08 |
|
[ 265 ]
(Rev.1) |
Harmonizing EMF Exposure Limits
|
Office of Electronic Communications
,
Poland
|
Q3/5
|
2018-05-08 |
|
[ 264 ]
(Rev.1-3) |
Some reworked material for K.rcd document
|
Bourns Limited
,
China Telecommunications Corporation
|
Q2/5
|
2018-05-08 |
|
[ 263 ]
(Rev.1) |
Proposed second draft of K.soft_req "Reliability requirement of particle radiation effect for telecommunication systems"
|
Fujitsu Limited
,
Hitachi, Ltd.
,
NEC Corporation
,
Nippon Telegraph and Telephone Corporation (NTT)
,
Oki Electric Industry Company Ltd. (OKI)
,
Xilinx Incorporation
|
Q5/5
|
2018-05-08 |
|
[ 262 ]
(Rev.1) |
Proposal of third draft of K.soft_mes "Quality estimation methods and application guidelines for mitigation measures based on particle radiation tests"
|
Fujitsu Limited
,
Hitachi, Ltd.
,
NEC Corporation
,
Nippon Telegraph and Telephone Corporation (NTT)
,
Oki Electric Industry Company Ltd. (OKI)
,
Xilinx Incorporation
|
Q5/5
|
2018-05-08 |
|
[ 261 ]
(Rev.1) |
Proposal for the revision of ITU-T Rec. K.21 (07/2017) Resistibility of telecommunication equipment installed in customer premises to overvoltages and overcurrents
|
Nokia Corporation
|
Q2/5
|
2018-05-07 |
|
[ 260 ]
(Rev.1) |
Proposal for the revision of ITU-T Rec. K.45 (07/2017) Resistibility of telecommunication equipment installed in the access and trunk networks to overvoltages and overcurrents
|
Nokia Corporation
|
Q2/5
|
2018-05-07 |
|
[ 259 ]
(Rev.1) |
Proposal for Annex A "Case Study" to supplement TD 366 K.Supp-5G_EMF_Compliance: Electromagnetic field (EMF) compliance assessments for 5G wireless networks
|
Ministry of Communications
,
India
|
Q3/5
|
2018-05-07 |
|
[ 258 ]
(Rev.1) |
Proposal for Supplement K.BPrac (May 2018)
|
GSMA
|
Q3/5
|
2018-05-07 |
|
[ 257 ]
|
Modified proposal for Appendix II of K.121 on RF-EMF Compliance of Shared Radiocommunications Sites
|
GSMA
|
Q3/5
|
2018-05-07 |
|
[ 256 ]
(Rev.1) |
New version v 7.01 of the software "EMF-estimator"
|
Orange Polska S.A.
,
National Institute of Telecommunications
,
Poland
|
Q3/5
|
2018-05-07 |
|
[ 255 ]
(Rev.1) |
Minimum distances to transmitting antennas
|
Orange Polska S.A.
|
Q3/5
|
2018-05-07 |
|
[ 254 ]
(Rev.1) |
Revision of the ITU-T Recommendation K.90
|
Orange Polska S.A.
|
Q3/5
|
2018-05-07 |
|
[ 253 ]
|
Comparison of controlled and uncontrolled exposure levels
|
Orange Polska S.A.
|
Q3/5
|
2018-05-07 |
Resultados :902 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):