International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A  C 

ITU-R WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:915 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 265 ]  
 
List of affected frequency assignments for satellite networks identified under No. 9.36.2 of the Radio Regulations (WRC-19 agenda item 7)     Korea (Republic of)   AI7   2017-04-18
[ 264 ]  
 
Note to Chairman of Task Group 5/1 (copy for information to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Microsoft EXCEL implementation of clutter loss and building entry loss calculations     Chairmen, SG 3 and WPs 3J, 3K & 3M     2017-04-13
[ 263 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D and 6A concerning WRC-19 agenda item 1.7     WP 7B     2017-04-13
[ 262 ]  
 
Liaison statement to Working Party 5B (copied to Working Party 4A for information) - Update on ICAO UAS SARPs activities     International Civil Aviation Organization     2017-04-11
[ 261 ]  
 
Liaison statement to Working Party 5B (copied to Working Party 4A for information) - Further information on ICAO UAS/RPAS SARPs activities     International Civil Aviation Organization     2017-04-11
[ 260 ]  
 
Liaison statement to Working Parties 3M (for action) and Working Parties 4A, 4C, 5A, 5B, 5C, 5D and 6A (for information)     WP 7B     2017-04-07
[ 259 ]  
 
Reply liaison statement to Working Party 5C (copy to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A and Task Group 5/1 for information) - Revision of Recommendation ITU-R F.699-7     WP 7B     2017-04-07
[ 258 ]  
 
Reply liaison statement to Working Party 5C (copied for information to Working Parties 4A, 4C, 5A, 5D) - WRC-19 agenda item 1.14     WP 7B   AI1.14   2017-04-07
[ 257 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 4A, 4C, 5A, 5B, 6A, 7B, 7C) - Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[SHARING-METHODS] - Methods for sharing between radiocommunication services     WP 7D     2017-04-07
[ 256 ]  
 
Liaison statement to Task Group 5/1 (copy to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Preparations for WRC-19 agenda item 1.13     Chairman, WP 6A   AI1.13   2017-04-05
[ 255 ]  
 
Validation of the minimum emission parameters contained within submissions of FSS satellite networks not subject to Appendices 30, 30A and 30B     France , United Kingdom of Great Britain and Northern Ireland     2017-04-05
[ 254 ]  
+Ann.1 
Additional information on the preparation of text for the draft CPM Report to WRC-19     Director, BR     2017-04-04
[ 253 ]  
 
Liaison statement to Working Party 4A - Support on propagation correlation for the update of Recommendation ITU-R S.1323-2     WP 3M     2017-04-03
[ 252 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 4A, 5B and 5C) - Evaluation of the differences between Recommendations ITU-R P.620-6 and ITU-R P.620-4     WP 3M     2017-03-31
[ 251 ]  
 
Liaison statement to Task Group 5/1 (copy for information to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Guidance on the use of ITU-R P-Series Recommendations for interference prediction and sharing studies under WRC-19 agenda item 1.13     WPs 3K, 3J & 3M   AI1.13   2017-03-31
[ 250 ]  
 
Liaison statement to Working Party 4A (copy for information to Working Parties 4C and 5D) - Propagation model for compatibility study regarding WRC-19 agenda item 9.1, issue 9.1.2     WPs 3M and 3K   AI9.1   2017-03-31
[ 249 ]  
 
Revisions to working document on WRC-19 agenda item 1.5 on regulatory issues - Operation of Earth Stations In Motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz     United Kingdom of Great Britain and Northern Ireland   AI1.5   2017-03-31
[ 248 ]  
 
Protection of the fixed service from Aeronautical-ESIM     United Kingdom of Great Britain and Northern Ireland   AI1.5   2017-03-31
[ 247 ]  
 
Proposal on the compatibility study between IMT systems and BSS (sound) systems in the band 1 452-1 492 MHz under WRC-19 agenda item 9.1 (issue 9.1.2)     Japan   AI9.1   2017-03-28
[ 246 ]  
 
Proposal relating to issue of modification of Section 1, Annex 1 of AP30 under agenda item 7     Japan   AI7   2017-03-28
[ 245 ]  
 
Views relating to the treatment of issue G - Under agenda item 7     Japan   AI7   2017-03-28
[ 244 ]  
 
Treatment of frequency assignments with a bandwidth less than the stated averaging bandwidth     Japan     2017-03-28
[ 243 ]  
 
Proposed draft CPM text for WRC-19 agenda item 7 issue G - Updating the reference situation for networks under Appendix 30 and 30A when provisional recording is used     Norway   AI7   2017-03-27
[ 242 ]  
 
Preliminary position on WRC-19 agenda     World Meteorological Organization     2017-03-20
[ 241 ]  
 
Consideration of definitive service areas of affected networks during the process of entering a new assignment into the RR Appendix 30B list     Belarus (Republic of)     2017-03-14
[ 240 ]  
(Rev.1) 
WRC-19 agenda item 7 - Issue F - Enhancement of RR Appendix 30B     Director, BR   AI7   2017-03-08
[ 239 ]  
 
Reply liaison statement to ITU-T Study Group 5 on seeking collaboration on draft Recommendation "Energy efficiency metrics and measurement methodology for 5G solutions" (copy to Working Parties 4A, 4C, 5A and 5C)     WP 5D     2017-02-28
[ 238 ]  
 
Liaison statement to Working Party 4A - Sharing and compatibility studies between IMT systems and BSS (sound) systems in the band 1 452-1 492 MHz in different countries     WP 5D     2017-02-28
[ 237 ]  
 
Liaison statement to Working Parties 4A, 5A, 5B and 5C - Technical and operational parameters and deployment characteristics for IMT-2020 for use in sharing studies under WRC-19 agenda items     WP 5D     2017-02-28
[ 236 ]  
 
Reply liaison statement to Working Party 1B on the progress towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] (copy to Working Parties 4A, 4C, 5A and 5C) - Regulatory tools to support enhanced shared use of the spectrum     WP 5D     2017-02-27
[ 235 ]  
 
Liaison statement to Working Party 4C (copy for information to Working Party 4A) - Protection of radionavigation-satellite service receiving earth stations operating in the frequency bands 1 164-1 215 MHz, 1 215-1 300 MHz and 1 559-1 610 MHz from unwanted emissions of IMT stations in the frequency bands below 3 GHz     WP 5D     2017-02-27
[ 234 ]  
 
Liaison statement to ITU-R Coordination Committee for Vocabulary (CCV) and ITU-T Standardization Committee for Vocabulary (SCV) on broadband definition (copy to ITU-D Study Group 1 Question 2/1, ITU-R Working Parties 4A, 4B, 4C, 5A, 5C and 6A) - Broadband access technologies, including IMT, for developing countries. What is the definition of Broadband?     WP 5D     2017-02-24
[ 233 ]  
 
Reply liaison statement to ITU-R Working Party 1B (copy to Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9) - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means...     WP 5D     2017-02-24
[ 232 ]  
 
Proposed amendments to the working document towards preliminary draft CPM text for WRC-19 agenda item 7 - Issue D: Identification of those specific satellite networks and systems with which coordination needs to be effected under RR Nos. 9.12, 9.12A or 9.13 - Agenda item 7     United Kingdom of Great Britain and Northern Ireland   AI7   2017-02-15
[ 231 ]  
 
Liaison statement to ITU-D Study Group 1 Question 2/1 on broadband definition (copy to ITU-R Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D and 6A for information) - Broadband access technologies, including IMT, for developing countries. What is the definition of Broadband?     CCV and SCV     2017-01-30
[ 230 ]  
 
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 with copy to ITU-D Study Group 1 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands...     WP 1B     2016-12-14
[ 229 ]  
 
Reply liaison statement to Working Parties 4C, 5A, 5C and 5D on the progress towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] (copied to ITU-R Working Parties 4A and 5B, ITU-R/ITU-D Joint Group on WDTC Resolution 9 and ITU-D Study Group 1 for information)     WP 1B     2016-12-14
[ 228 ]  
 
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[SHARING-METHODS] - Methods for sharing between radiocommunications services     WP 1A     2016-12-13
[ 227 ]  
 
Reply liaison statement to Working Parties 3M and 3J (copied for information to Working Parties 4A, 5B and 5C) - Evaluation of the differences between Recommendations ITU-R P.620-6 and ITU-R P.620-4     WP 1A     2016-12-13
[ 226 ]  
 
Liaison statement to Working Party 4A - Mobile service technical and operational characteristics and protection criteria for use in sharing studies under WRC-19 agenda item 1.5     WP 5A   AI1.5   2016-11-29
[ 225 ]  
 
Liaison statement to Task Group 5/1 (copied for information to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, and 7D) - Preparations for WRC-19 AI 1.13     WP 5A   AI1.13   2016-11-23
[ 224 ]  
 
Liaison statement to Working Party 4A - WRC-19 agenda item 9.1, issue 9.1.3     WP 5A   AI9.1   2016-11-23
[ 223 ]  
 
Reply liaison statement to Working Party 4A - FSS/BSS technical parameters for sharing studies under WRC-19 agenda item 1.16     WP 5A   AI1.16   2016-11-23
[ 222 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 5C and 5D for information) - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA]     WP 5A     2016-11-23
[ 221 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 3M, 5C, 5D and 7D for information) - Operational requirements and technical characteristics of systems in the frequency band 51.4-52.4 GHz     WP 5A     2016-11-23
[ 220 ]  
 
Reply liaison statement to Working Party 4A - Regarding WRC-19 agenda item 9.1, issue 9.1.3     WP 5C   AI9.1   2016-11-21
[ 219 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Party 4B for information) - FSS technical parameters for sharing studies under WRC-19 agenda item 1.14     WP 5C   AI1.14   2016-11-21
[ 218 ]  
 
Liaison statement to Working Party 4A - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA]     WP 5C     2016-11-21
[ 217 ]  
 
Reply liaison statement to ITU-R Working Parties 1A, 3J, 3M (copy to Working Party 4A for information) - Revision of Recommendations ITU-R SM.1448 and ITU-R P.620     WP 5C     2016-11-21
[ 216 ]  
 
Reply liaison statement to Working Party 1A copied to Working Parties 1A, 3J, 3M, 4A, 4C 5A, 5C and 5D - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz     WP 5B     2016-11-18
Results:915 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2019-10-18