International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5B  C 

ITU-R WP5B

Maritime mobile service including Global Maritime Distress and Safety System (GMDSS); aeronautical mobile service and radiodetermination service

Results:731 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 81 ]  
 
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M 4A, 4B, 4C, 5B, 5C, 5D and 6A) - WRC-19 agenda item 1.7     WP 5A   1.7   2016-05-25
[ 80 ]  
 
Liaison statement to Working Party 7B (copied for information to Working Parties 3M, 4C, 5B, 5C, 5D and 6A) - Technical characteristics for WRC-19 agenda item 1.3     WP 5A   AI1.3   2016-05-25
[ 79 ]  
 
Liaison statement to Working Parties 1A, 1B, 4A, 5B, 5C and 5D - Study of sharing schemes in the land mobile service on the basis of geographical use, frequencies, services, new technologies and applications     WP 5A     2016-05-25
[ 78 ]  
 
Liaison statement to Working Party 6A (copy to Working Parties 1B, 5B, 5C, 3K and 3M) - WRC-19 agenda 1.1     WP 5A   AI1.1   2016-05-25
[ 77 ]  
 
Reply liaison statement to Working Party 1A (copy for information to Working Parties 1B, 5B 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 5A     2016-05-25
[ 76 ]  
 
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Preparation for WRC-19 agenda item 1.13     TG 5/1   AI1.13   2016-05-25
[ 75 ]  
 
Liaison statement to Working Party 5B - Preliminary draft new Report ITU-R F.[FS/RLS COMPATIBILITY IN 71-86 GHZ] - P-P/P-MP applications in the fixed service operating in the 71-76 GHz and 81-86 GHz bands and automotive radar applications in the radiolocation service operating in the 76-81 GHz band (Question ITU-R 252/5)     WP 5C     2016-05-24
[ 74 ]  
 
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M, 4A, 4B, 4C, 5A, 5B and 6A) - WRC-19 agenda item 1.7     WP 5C   AI1.7   2016-05-24
[ 73 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5B and 5D) - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA]     WP 5C     2016-05-20
[ 72 ]  
 
Liaison statement to Working Party 7C (copy to Working Parties 5B and 6A for information) - Technical and operational characteristics for systems operating within the 40-50 MHz frequency band     WPs 5A and 5C     2016-05-20
[ 71 ]  
+Ann.1-27 
Report on the meeting of Working Party 5B (Geneva, 10-20 May 2016)     Chairman, WP 5B     2016-05-20
[ 70 ]  
 
Final list of participants - Working Party 5B (Geneva, 10-20 May 2016)     Director, BR     2016-05-20
[ 69 ]  
 
Liaison statement on information about work that is being carried out within work under study in ITU-T Q7/5     ITU-T SG 5     2016-05-13
[ 68 ]  
 
List of documents issued (Documents 5B/1 - 5B/68)     BR Study Groups Department     2016-05-09
[ 67 ]  
 
Report on liaison with CENELEC on developments concerning PLT, EMI and WPT - Communication by the Rapporteur on coexistence of wired telecommunication with radiocommunication systems     Chairman, WP 5A     2016-05-09
[ 66 ]  
 
Proposals on the studies under WRC-19 agenda item 1.8 introduction of additional satellite systems into the GMDSS     United Arab Emirates     2016-05-03
[ 65 ]  
 
Implementation of Resolution 155 (WRC-15) - WRC-15 agenda item 1.5, UAS-FSS     Iran (Islamic Republic of)     2016-05-03
[ 64 ]  
 
Working document towards preliminary draft new Recommendation ITU-R M.[AMS 4.4-5GHZ] - Technical characteristics of, and protection criteria for aeronautical mobile systems operating in the frequency band 4 400-4 990 MHz     France     2016-05-03
[ 63 ]  
 
Satellite supportability for unmanned aircraft control and non-payload communication     United Kingdom of Great Britain and Northern Ireland     2016-05-03
[ 62 ]  
 
Working document to the proposal of the preliminary draft revision on the Recommendation ITU-R M.1371-5 - Technical characteristics for an automatic identification system using time division multiple access in the VHF maritime mobile frequency band     China (People's Republic of)     2016-05-03
[ 61 ]  
 
Proposal of liaison statement to Working Party 3K and Working Party 3M on ITU-R propagation Recommendations used by Working Party 5B     France     2016-05-03
[ 60 ]  
 
Working document towards preliminary draft revision of Recommendation ITU-R M.1851-0 - Mathematical models for radiodetermination radar systems antenna patterns for use in interference analyses     France     2016-05-03
[ 59 ]  
 
Proposal on studies at Working Party 5B for Resolution 155 (WRC-15)     France     2016-05-02
[ 58 ]  
 
Working document towards a preliminary draft new Report ITU-R M.[ADS-B] - Reception of automatic dependent surveillance broadcast via satellite and compatibility studies with incumbent systems in the frequency band 1 087.7-1 092.3 MHz     France     2016-05-02
[ 57 ]  
 
Working document towards a preliminary draft new [RECOMMENDATION / REPORT] [PEAK FDR] - Peak frequency dependent rejection for pulsed systems     France     2016-05-02
[ 56 ]  
 
Preliminary draft revision of Recommendation ITU-R M.2013-0 - Technical characteristics of, and protection criteria for non-ICAO aeronautical radionavigation systems, operating around 1 GHz     France     2016-05-02
[ 55 ]  
 
Preliminary draft revision of Recommendation ITU-R M.1466-0 - Characteristics of and protection criteria for radars operating in the radionavigation service in the frequency band 31.8-33.4 GHz (Question ITU-R 226/8)     France     2016-05-02
[ 54 ]  
 
Preliminary draft revision of Recommendation ITU-R M.1461-1 - Procedures for determining the potential for interference between radars operating in the radiodetermination service and systems in other services     France     2016-05-02
[ 53 ]  
 
Proposal of future framework for Recommendations related to radiodetermination, including radiolocation, radionavigation services     France     2016-05-02
[ 52 ]  
 
Proposed revision to working document towards a preliminary draft new Report ITU-R M.[ADS-B] - Reception of automatic dependent surveillance broadcast via satellite and compatibility studies with incumbent systems in the frequency band 1 087.7-1 092.3 MHz     Canada     2016-05-02
[ 51 ]  
 
Proposed revision of working document towards a preliminary draft new Report ITU-R M.[FLIGHT TRACKING] - Global flight tracking for civil aviation     Canada     2016-05-02
[ 50 ]  
 
This document has been withdrawn     Indonesia (Republic of)     2016-05-02
[ 49 ]  
 
Preliminary study to detect restrictions on aircraft messages using GADSS     Universidad Tecnológica Nacional (Argentina)     2016-05-02
[ 48 ]  
 
Liaison statement to Working Parties 5A, 5B and 5C - Technical characteristics and protection criteria for fixed and mobile services in support of studies under WRC-19 agenda item 9.1, issue 9.1.3     WP 4A   AI9.1   2016-05-02
[ 47 ]  
 
Liaison statement to Working Parties 5A, 5B, 5C and 5D - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA]     WP 4A     2016-05-02
[ 46 ]  
 
Liaison statement to Working Parties 5A, 5B and 5C - Working document towards a preliminary draft new Recommendation ITU-R S.[GUIDELINES _14.5-14.8]     WP 4A     2016-05-02
[ 45 ]  
 
Maritime mobile service identity for a robot survey vessel     Netherlands (Kingdom of the)     2016-04-29
[ 44 ]  
 
Working document to the study of autonomous maritime radio devices for supporting WRC-19 agenda item 1.9.1     China (People's Republic of)   AI1.9.1   2016-04-29
[ 43 ]  
 
Autonomous maritime radio devices operating in the frequency band 156-162.05 MHz - Identification and categorization of autonomous maritime radio devices     United States of America     2016-04-28
[ 42 ]  
 
Working document - Work plan for WRC-19 agenda item 1.8 - Introduction of additional satellite systems into the GMDSS     United States of America     2016-04-28
[ 41 ]  
 
Working document towards draft CPM text on WRC-19 agenda item 1.8 and reply liaison to WP 4C     United States of America     2016-04-28
[ 40 ]  
 
Liaison statement to ICAO - Draft study results related to the impact of incumbent systems to earth-stations on board unmanned aircraft     United States of America     2016-04-28
[ 39 ]  
 
Working document towards a preliminary draft new Report ITU-R M.[ATC MODELING] - Software modeling of air traffic control primary surveillance radars     United States of America     2016-04-28
[ 38 ]  
 
Proposed updates to WD-PDN Report ITU-R M.[ASR PERF 2 700-2 900 MHz] - Radar receiver performance measurements of interference into aeronautical radionavigation service radars operating in the frequency band 2 700-2 900 MHz     United States of America     2016-04-28
[ 37 ]  
 
Working document towards a preliminary draft new Report ITU-R M.[SYS-NOISE-TEMP] - Procedures for estimating radar system noise temperature     United States of America     2016-04-28
[ 36 ]  
 
Working document towards a preliminary draft new Report ITU-R M.[PULSES-BEAM] - Procedures for estimating number of pulses in radar antenna 3 dB beamwidth     United States of America     2016-04-28
[ 35 ]  
 
Working document towards a preliminary draft new Report [PEAK FDR] - Peak frequency dependent rejection for pulsed systems     United States of America     2016-04-28
[ 34 ]  
 
Comments on work of WP 5B regarding the outcomes of WRC-15 agenda item 1.5, UAS-FSS - Coordination of activities within ITU-R and ICAO in response to Resolution 155 [COM4/5] (WRC-15) regarding the use of FSS bands by UAS     United States of America   AI1.5   2016-04-28
[ 33 ]  
 
Liaison Note to ITU-R Working Party 5B - Regarding the cooperation with IALA     International Association of Marine Aids to Navigation and Lighthouse Authorities     2016-04-28
[ 32 ]  
 
Liaison Note to ITU-R Working Party 5B - Regarding the agenda item 1.9.2 (WRC-19)     International Association of Marine Aids to Navigation and Lighthouse Authorities   AI1.9.2   2016-04-28
Results:731 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2019-10-18