Recommendation ITU-T L.GAL2 - Interface for power management in NFV environments "Green Abstraction Layer 2"
|
Consorzio Nazionale Interuniversitario per le Telecomunicazioni
,
Orange
|
Q6/5
|
2018-02-20 |
|
[ 201 ]
|
Proposed initial text for L.SES (Use of ICT sites to support environmental sensing)
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q6/5
|
2018-02-20 |
|
[ 200 ]
(Rev.1) |
Proposal for stable draft Recommendation L.400migration
|
Orange
|
Q6/5
|
2018-02-19 |
|
[ 199 ]
|
Proposal for the first draft of draft Recommendation L.BMM
|
Huawei Technologies Co., Ltd.
|
Q6/5
|
2018-02-19 |
|
[ 198 ]
|
Proposal for L.ENST2 BMS feature.
|
Huawei Technologies Co., Ltd.
|
Q6/5
|
2018-02-19 |
|
[ 197 ]
|
Comments and proposal for picture inside L.ENST2.
|
Huawei Technologies Co., Ltd.
|
Q6/5
|
2018-02-19 |
|
[ 196 ]
|
Huawei comment on L.ENST2 (battery part) 2017 version
|
Huawei Technologies Co., Ltd.
|
Q6/5
|
2018-02-19 |
|
[ 195 ]
(Rev.1) |
Improvement on draft L.5G_powering 16 January 2018 e-meeting draft
|
Orange
|
Q6/5
|
2018-02-18 |
|
[ 194 ]
|
Proposal for L.1000 revision
|
Huawei Technologies Co., Ltd.
,
Orange
|
Q7/5
|
2018-02-18 |
|
[ 193 ]
|
Proposed inputs to draft Recommendation L.CEM on Criteria for evaluation of the environmental impact of mobile phones
|
Royal KPN N.V.
|
Q7/5
|
2018-02-15 |
|
[ 192 ]
|
Proposed new work item - A.1 L.CE_Concepts: Circular Economy. Definitions and concepts for material efficiency for ICT
|
Royal KPN N.V.
|
Q7/5
|
2018-02-15 |
|
[ 191 ]
(Rev.1) |
L.CE_Concepts: Circular Economy. Definitions and concepts for material efficiency for ICT
|
Huawei Technologies Co., Ltd.
,
Royal KPN N.V.
|
Q7/5
|
2018-02-15 |
|
[ 190 ]
|
"Draft practical guidance for the development of inventories of waste electrical and electronic equipment"
|
Ministry of Communication and Information Technology (MCIT)- Egypt
|
Q7/5
|
2018-02-15 |
|
[ 189 ]
|
"E- waste Assessment Methodology; Training and Reference Manual"
|
Ministry of Communication and Information Technology (MCIT) - Egypt
|
Q7/5
|
2018-02-15 |
|
[ 188 ]
(Rev.1) |
Outcome of the discussion with SBT
|
Nokia France
,
Orange
,
Telefon AB - LM Ericsson
|
Q9/5
|
2018-02-15 |
|
[ 187 ]
|
Comments and proposed allocation of work on Draft ITU-T Recommendation L.MAE
|
Nokia France
,
Orange
,
Telefon AB - LM Ericsson
|
Q9/5
|
2018-02-15 |
|
[ 186 ]
(Rev.1) |
First draft of Criteria for evaluation of the environmental impact of mobile phones (L.CEM)
|
Ministry of Industry and Information Technology (MIIT)-China
|
Q7/5
|
2018-02-12 |
|
[ 185 ]
|
Proposed inputs to baseline document of Draft Recommendation L.BP
|
Uganda Communications Commission (UCC)
|
Q7/5
|
2018-02-09 |
|
[ 184 ]
|
Inputs to Connect 2020 agenda E-Waste reduction
|
Uganda Communications Commission (UCC)
|
Q7/5
|
2018-02-09 |
|
[ 183 ]
|
Roadmap for E- Waste Take- back committee
|
Centre for Environment and Development for the Arab Region and Europe-Egypt
|
Q7/5
|
2017-11-01 |
|
[ 182 ]
|
Baseline Document for work item L.ICT and FA - Use of ICT in the adaptation of the Fisheries Sector to the Effects of Climate Change
|
Ministry of Communication and Information Technology (MCIT)-Egypt
|
Q9/5
|
2017-11-01 |
|
[ 181 ]
|
Technical Report on "Analysis of EMC aspects and definition of requirements for 5G systems"
|
Nokia Corporation
|
Q4/5
|
2017-11-01 |
|
[ 180 ]
(Rev.1) |
Proposal for L.1000 revision
|
Orange
|
Q7/5
|
2017-10-31 |
|
[ 179 ]
|
Carbon budget for the ICT sector
|
Orange
|
Q9/5
|
2017-10-31 |
|
[ 178 ]
|
L.ENST3 - New energy storage technology for stationary use with network and CPE; Super-Capacitor technology
|
Huawei Technologies Co., Ltd.
,
Telecom Italia S.p.A.
|
Q6/5
|
2017-10-31 |
|
[ 177 ]
|
First draft of Recommendation ITU-T K.int (Limits of interferences on telecommunication transmissions on copper other than speech)
|
Orange
,
Société nationale des chemins de fer français
|
Q1/5
|
2017-10-31 |
|
[ 176 ]
|
Research of limits on ADSL disturbances created by A.C. electrified traction systems for K.int (Limits of interference on telecommunication transmissions on copper other than speech)
|
Orange
,
Société nationale des chemins de fer français
|
Q1/5
|
2017-10-31 |
|
[ 175 ]
|
Proposal to create a new work item to develop a new ITU-T Recommendation on Procurement Criteria for Data Centres.
|
Ministerio de Modernización-Argentina
|
Q6/5
|
2017-10-31 |
|
[ 174 ]
(Rev.1) |
Proposed new work item: Draft Recommendation on 5G energy efficiency
|
Ministerio de Modernización-Argentina
,
Huawei Technologies Co., Ltd.
|
Q6/5
|
2017-10-31 |
|
[ 173 ]
|
Baseline Document for the Recommendation on "EPR Guidelines for Sustainable E-waste Management in countries"
|
Ministry of Communication and Information Technology (MCIT)-Egypt
,
Royal KPN N.V.
,
Uganda Communications Commission (UCC)
|
Q7/5
|
2017-10-31 |
|
[ 172 ]
|
Proposal to convert the Technical Report on "Study on methods and metrics to evaluate energy efficiency for future 5G systems" into a Supplement
|
Huawei Technologies Co., Ltd.
,
Telecom Italia S.p.A.
|
Q6/5
|
2017-10-31 |
|
[ 171 ]
(Rev.1) |
Contribution on 5 sept draft ID2r1 of L.400migration / ETSI DES 0260
|
Orange
|
Q6/5
|
2017-10-31 |
|
[ 170 ]
|
Proposed text for the Draft Recommendation on the methodologies for the assessment of the environmental impact of the ICT sector
|
Nokia Corporation
,
Orange
,
Telefon AB - LM Ericsson
|
Q9/5
|
2017-10-31 |
|
[ 169 ]
(Rev.1) |
Recommendation L.mmNFV - Measurement method for energy efficiency of Network Function Virtualization
|
Consorzio Nazionale Interuniversitario per le Telecomunicazioni
,
Huawei Technologies Co., Ltd.
|
Q6/5
|
2017-10-31 |
|
[ 168 ]
|
2nd revised baseline text of L.CCRisk (Framework of climate change risk assessment for telecommunication and electrical facilities)
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/5
|
2017-10-31 |
|
[ 167 ]
(Rev.1) |
Presentation of the main concepts of the fourth draft of the ITU-T L.GAL2
|
Consorzio Nazionale Interuniversitario per le Telecomunicazioni
|
Q6/5
|
2017-10-31 |
|
[ 166 ]
(Rev.1) |
The fourth draft of the ITU-T L.GAL2 - Interface for power management in NFV environments "Green Abstraction Layer 2"
|
Consorzio Nazionale Interuniversitario per le Telecomunicazioni
|
Q6/5
|
2017-10-31 |
|
[ 165 ]
|
Points to consider for 5G energy efficiency
|
Telecom Italia S.p.A.
|
Q6/5
|
2017-10-31 |
|
[ 164 ]
|
Questionnaire to develop a guideline on best practices and environment friendly policies for effective ICT deployment methods.
|
Malaysian Communications and Multimedia Commission
|
Q6/5
|
2017-10-31 |
|
[ 163 ]
|
Proposal for considerations on using risk assessment method of L.CCRisk
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/5
|
2017-10-31 |
|
[ 162 ]
|
Study : Role of ICT in facing Climate Change within the Arab region
|
Arab Information and Communication Technology Organization (AICTO)
|
Q9/5
|
2017-10-31 |
|
[ 161 ]
(Rev.1-2) |
Mitigating Climate Change Impacts for a Sustainable Agriculture in the Arab Region
|
Arab Information and Communication Technology Organization (AICTO)
|
Q9/5
|
2017-10-31 |
|
[ 160 ]
|
Information regarding an ongoing study on ICTs carbon footprint
|
Telefon AB - LM Ericsson
|
Q9/5
|
2017-10-31 |
|
[ 159 ]
(Rev.1) |
EMF Estimator Error factor
|
National Telecommunications Corporation (NTC)-Sudan
|
Q3/5
|
2017-10-31 |
|
[ 158 ]
(Rev.1) |
Updated draft document of L.CCRisk (Framework of climate change risk assessment for telecommunication and electrical facilities)
|
Korea (Rep. of)
|
Q9/5
|
2017-10-31 |
|
[ 157 ]
(Rev.1) |
Contribution for Clause 9 and 10 of L.CCRisk
|
Korea (Rep. of)
|
Q9/5
|
2017-10-31 |
|
[ 156 ]
(Rev.1) |
Draft baseline document for L.CCRisk (Framework of climate change risk assessment for telecommunication and electrical facilities)
|
Korea (Rep. of)
|
Q9/5
|
2017-10-31 |
|
[ 155 ]
|
Consideration topics in preparation for the Technical Report concerning 5G and EMF
|
Korea (Rep. of)
|
Q3/5
|
2017-10-31 |
|
[ 154 ]
|
Proposal of updating L.green_mgm_DC
|
Korea (Rep. of)
|
Q6/5
|
2017-10-31 |
|
[ 153 ]
|
Proposal of the operational procedure of the energy-saving management system in L.green_mgm_DC
|
Korea (Rep. of)
|
Q6/5
|
2017-10-31 |
Resultados :902 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):