Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 838 ]
|
Proposal for WTR message of R-APS Specific Information in G.8032
|
ETRI
|
Q9/15
|
2008-02-01 |
|
[ 837 ]
|
Proposal of adding a subclause about RZ-AMI to Clause 7 of Sup.39
Withdrawn - see C829
|
Huawei
|
Q6/15
|
2008-02-01 |
|
[ 836 ]
|
Proposal of a next step for 40G format comparison
Withdrawn - see C825
|
Huawei
|
Q6/15
|
2008-02-01 |
|
[ 835 ]
|
Bandwidth studies by simulation for 40G modulation formats
Withdrawn - see C817
|
Huawei
|
Q6/15
|
2008-02-01 |
|
[ 834 ]
|
Proposal of slight wording change about ODB related description in Clause 7 of Sup.39
Withdrawn - see C814
|
Huawei
|
Q6/15
|
2008-02-01 |
|
[ 833 ]
|
A Fundamental Limitation of Retransmission above FEC
|
Huawei
|
Q4/15
|
2008-02-01 |
|
[ 832 ]
|
G.gen, ADSL, G.vdsl: Line Driver Power Consumption and Transmit Power
|
Huawei
|
Q4/15
|
2008-02-01 |
|
[ 831 ]
|
Further enhancement to Low Power Mode
|
Huawei
|
Q4/15
|
2008-02-01 |
|
[ 830 ]
|
G.pacmod-bis: Test results of the new timing distribution mechanism
|
Huawei
|
Q14/15, Q13/15, Q12/15
|
2008-02-01 |
|
[ 829 ]
|
Proposal of adding a subclause about RZ-AMI to Clause 7 of Sup.39
|
Huawei
|
Q6/15
|
2008-01-31 |
|
[ 828 ]
|
Requirements for Network Automatic Configuration
|
Huawei
|
Q14/15, Q12/15
|
2008-01-31 |
|
[ 827 ]
|
Proposal to Accomplish OTN Protection Recommendation
|
Huawei
|
Q9/15
|
2008-01-31 |
|
[ 826 ]
|
Corrections to FD/FDFr Usage in G.8010
|
Huawei
|
Q12/15
|
2008-01-31 |
|
[ 825 ]
|
Proposal of a next step for 40G format comparison
|
Huawei
|
Q6/15
|
2008-01-31 |
|
[ 824 ]
|
Independently Transport of Four 512/513b Transcoded 10GbEs in standard ODU3
|
Huawei
|
Q11/15
|
2008-01-31 |
|
[ 823 ]
|
PBB Model for G.8010
|
Huawei
|
Q12/15
|
2008-01-31 |
|
[ 822 ]
|
G.800 Term for Interconnect Transport Entities
|
Huawei
|
Q12/15
|
2008-01-31 |
|
[ 821 ]
|
G.800 description modification
|
Huawei
|
Q12/15
|
2008-01-31 |
|
[ 820 ]
|
Composite Transport Model and Transport Resilience Description
|
Huawei
|
12/15
|
2008-01-31 |
|
[ 819 ]
|
Consideration about NG OTN hierarchy
|
Huawei
|
Q11/15
|
2008-01-31 |
|
[ 818 ]
|
Consideration about 40GE/100GE transport
|
Huawei
|
Q11/15
|
2008-01-31 |
|
[ 817 ]
|
Bandwidth studies by simulation for 40G modulation formats
|
Huawei
|
Q6/15
|
2008-01-31 |
|
[ 816 ]
|
Behaviour of Cn transport for GMP
|
Huawei
|
Q11/15
|
2008-01-31 |
|
[ 815 ]
|
Annex of G.8010v2 to describe the PVT network application
|
Huawei
,
Nokia Siemens Networks
|
Q12/15
|
2008-01-31 |
|
[ 814 ]
|
Proposal of slight wording change about ODB related description in Clause 7 of Sup.39
|
Huawei
|
Q6/15
|
2008-01-31 |
|
[ 813 ]
|
2048/2049B transcoded 10GbE in ODU2
|
Huawei
|
11/15
|
2008-01-31 |
|
[ 812 ]
|
T-MPLS Ring Protection Mechanisms
|
Huawei
,
China Mobile
|
Q9/15
|
2008-01-31 |
|
[ 811 ]
|
Proposal on OAM architecture and attribute for EVPLAN services
|
Huawei
,
China Mobile
|
Q11/15
|
2008-01-31 |
|
[ 810 ]
|
Proposal on the model and architecture of EVPLAN
|
Huawei
,
China Mobile
|
Q11/15
|
2008-01-31 |
|
[ 809 ]
|
Considerations on deployment of T-MPLS Protection Ring
|
Huawei
,
China Mobile
|
Q9/15
|
2008-01-31 |
|
[ 808 ]
|
Comments on protocol description and state machine of G.8032
|
Huawei
,
CATR, MII
|
Q9/15
|
2008-01-31 |
|
[ 807 ]
|
Comments on the mechanism of G.8032
|
Huawei
,
CATR, MII
|
Q9/15
|
2008-01-31 |
|
[ 806 ]
|
40 Gbit/s DP-QPSK parameter update II
|
Nortel
|
Q6/15
|
2008-01-31 |
|
[ 805 ]
|
Comments on G.8032 - Ethernet rings protection switching
|
ETRI
|
Q9/15
|
2008-01-31 |
|
[ 804 ]
|
Comment on G.8011.4
|
Hitachi
|
Q11/15
|
2008-01-31 |
|
[ 803 ]
|
Proposal for VLAN Tagging Filter Data ME in G.984.4
|
Hitachi
|
Q2/15
|
2008-01-31 |
|
[ 802 ]
|
Comment on Connectivity Monitoring in G.8011.4
|
Hitachi
|
Q11/15
|
2008-01-31 |
|
[ 801 ]
|
Proposal for MAC Priority Queue ME in G.984.4
|
Hitachi
|
Q2/15
|
2008-01-31 |
|
[ 800 ]
|
Proposal for Extended VLAN Tagging Operation Configuration Data ME in G.984.4
|
Hitachi
|
Q2/15
|
2008-01-31 |
|
[ 799 ]
|
Proposal for treatment of Priority of the Extended VLAN tagging operation configuration data managed entity for G.984.4
|
Hitachi
|
Q2/15
|
2008-01-31 |
|
[ 798 ]
|
Proposal for IP precedence capability on the 802.1p mapper service profile managed entity for G.984.4
|
Hitachi
|
Q2/15
|
2008-01-31 |
|
[ 797 ]
|
Consideration on IP/MPLS and T-MPLS interworking
|
Fujitsu
|
Q12/15
|
2008-01-31 |
|
[ 796 ]
|
Proposed OTN hierarchy for SDH, 10GE, 40GE and 100GE
|
Fujitsu
|
Q11/15
|
2008-01-31 |
|
[ 795 ]
|
Consideration on mapping10GbE x 4 mapping into ODU3
|
Fujitsu
|
Q11/15
|
2008-01-31 |
|
[ 794 ]
|
Proposal for R-APS frame format in G.8032
|
Fujitsu
|
Q9/15
|
2008-01-31 |
|
[ 793 ]
|
Comments and proposed modification for draft G.8132
|
Fujitsu
|
Q9/15
|
2008-01-31 |
|
[ 792 ]
|
Comments and proposed modification for the clause 6 and 8 in G.8032
|
Fujitsu
,
NEC
,
Mitsubishi
,
Hitachi
|
Q9/15
|
2008-01-31 |
|
[ 791 ]
|
Proposal for a revision of Recommendation G.697
|
Telecom Italia
|
Q6/15
|
2008-01-31 |
|
[ 790 ]
|
G.INP, G.ADSL, G.VDSL: Impulsive noise characteristics measured in FT network
|
France Telecom
|
Q4/15
|
2008-01-31 |
|
[ 789 ]
|
State transitions tables for TM-SPRing
|
Alcatel-Lucent
|
Q9/15
|
2008-01-31 |
Results:289 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):