Contribuciones |
|
Número
|
Título
|
Origen
|
Fecha
|
|
[ 105 ]
|
Working document towards sectins 3/1.17/5 and 6 of the draft CPM Report (analysis of the results of studies)
|
European Broadcasting Union (EBU)
|
2009-11-02 |
|
[ 104 ]
|
Working document towards Section 3/1.17/4 of the draft CPM Report (analysis of the results of studies)
|
European Broadcasting Union (EBU)
|
2009-11-02 |
|
[ 103 ]
|
The perception of digital terrestrial television broadcasting as a high power service
|
Free TV Australia Ltd.
|
2009-10-27 |
|
[ 102 ]
|
Field study of UMTS uplink and downlink signals
|
European Broadcasting Union (EBU)
,
Free TV Australia Ltd
|
2009-10-23 |
|
[ 101 ]
+Add.1 |
Uplink EIRP distribution within a mobile tri-sector cell
|
European Broadcasting Union (EBU)
|
2009-10-22 |
|
[ 100 ]
|
Proposed prediction method to conduct sharing studies between the broadcast service and the mobile service
|
European Broadcasting Union (EBU)
|
2009-10-22 |
|
[ 99 ]
+Add.1 |
Cross border interference issued - Protection for DTT service vs. the mobile service, Effects of multiple interference sources
|
European Broadcasting Union (EBU)
|
2009-10-22 |
|
[ 98 ]
+Add.1 |
Determination of cell size in a tri-sector cell
|
European Broadcasting Union (EBU)
|
2009-10-22 |
|
[ 97 ]
|
Proposal on draft CPM Report
|
Asia-Pacific Telecommunity (APT)
|
2009-10-16 |
|
[ 96 ]
|
Proposed changes to Resolution 749
|
Iran (Islamic Republic of)
|
2009-10-11 |
|
[ 95 ]
|
Proposal on draft CPM Report
|
Iran (Islamic Republic of)
|
2009-10-11 |
|
[ 94 ]
|
ABU views on WRC-12 Agenda item 1.17
|
Asia-Pacific Broadcasting Union (ABU)
|
2009-09-07 |
|
[ 93 ]
|
Liaison statement to Joint Task Group 5-6 - IMT parameters for the band 790-862 MHz (copied to Working Party 5B for information)
|
WP 5D
|
2009-07-17 |
|
[ 92 ]
|
Liaison statement to Joint Task Group 5-6 - Sharing studies between mobile service and aeronautical radionavigation service stations in the frequency band 790-862 MHz according to Agenda item 1.17 WRC-11
|
WP 3M
|
2009-06-23 |
|
[ 91 ]
|
Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C, 7D and Joint Task Group 5-6 - Development of a Handbook on propagation information for the prediction of interference and coordination distance
|
WP 3M
|
2009-06-18 |
|
[ 90 ]
|
Liaison statement from Working Party 3K to Joint Task Group 5-6 - Propagation models needed for use in sharing studies at UHF frequencies
|
WP 3K
|
2009-06-16 |
|
[ 89 ]
|
Appointment of a Rapporteur for a Report on sharing studies in response to Resolution 749 (WRC-07)
|
Chairman, JTG 5-6
|
2009-06-09 |
|
[ 88 ]
+Ann.1-15 |
Report on the third meeting of Joint Task Group 5-6 (Geneva, 11-15 May 2009)
|
Chairman, JTG 5-6
|
2009-05-18 |
|
[ 87 ]
(Rev.1) |
Final List of Participants - Joint Task Group 5-6 (Geneva, 11-15 May 2009)
|
Director, BR
|
2009-05-15 |
|
[ 86 ]
|
List of documents issued
|
BR Study Group Department
|
2009-05-08 |
|
[ 85 ]
|
DVB-T protection ratios and overloading thresholds in the presence of a UMTS interfering signal
|
TDF Group
|
2009-05-04 |
|
[ 84 ]
|
Detailed results of field study of compatibility between DVB-T and UMTS
|
European Broadcasting Union (EBU)
,
Free TV Australia Ltd.
|
2009-05-04 |
|
[ 83 ]
|
Proposals for modifications to Section 3 of the draft CPM text
|
European Broadcasting Union (EBU)
|
2009-05-04 |
|
[ 82 ]
|
Proposals for modifications to Section 4 of the draft CPM text
|
European Broadcasting Union (EBU)
|
2009-05-04 |
|
[ 81 ]
|
Additional system characteristics of an operational IMT network deployed in Australia in the
800 MHz band
|
Telstra Corporation Ltd.
|
2009-05-04 |
|
[ 80 ]
|
IMT systems characteristics relevant to the work of JTG 5-6
|
GSM Association
|
2009-05-04 |
|
[ 79 ]
|
Cross border interference issues - Protection for the broadcast service vs. the mobile service
|
European Broadcasting Union (EBU)
|
2009-05-04 |
|
[ 78 ]
|
Mobile service base station EIRP limits for the protection of broadcasting
|
European Broadcasting Union (EBU)
|
2009-05-04 |
|
[ 77 ]
|
Band edge mask limits
|
European Broadcasting Union (EBU)
|
2009-05-04 |
|
[ 76 ]
|
Cross border interference: mobile uplink vs. the broadcast service
|
European Broadcasting Union (EBU)
|
2009-05-04 |
|
[ 75 ]
|
Fixed system characteristics deployed in Oman for use in studies in the 790-862 MHz band
|
Oman (Sultanate of)
|
2009-05-04 |
|
[ 74 ]
|
Compatibility between LTE and DVB-T systems in co- and adjacent-channel configuration
|
Norddeutscher Rundfunk (NDR)
,
Zweites Deutsches Fernsehen (ZDF)
|
2009-05-04 |
|
[ 73 ]
|
Proposed changes to Annex 4 to Joint Task Group 5-6 Chairman's Report "Preliminary list of aeronautical radionavigation service characteristics for use in studies in the band
790 - 862 MHz"
|
Finland
,
Switzerland (Confederation of)
,
Sweden
,
Norway
,
Lithuania (Republic of)
,
Germany (Federal Republic of)
,
France
|
2009-05-04 |
|
[ 72 ]
|
Coverage holes within a broadcast coverage area
|
European Broadcasting Union (EBU)
|
2009-05-03 |
|
[ 71 ]
|
Proposal on draft CPM Report
|
Korea (Republic of)
|
2009-05-04 |
|
[ 70 ]
|
Proposals for modifications to preliminary draft methodologies (including interference objectives) for sharing studies between the mobile service, on the one hand, and the terrestrial broadcasting, fixed and aeronautical radionavigation services, on the other hand, in the band 790-862 MHz
|
European Broadcasting Union (EBU)
|
2009-05-01 |
|
[ 69 ]
|
Proposals for modifications to the propagation model needed for use in sharing studies at UHF frequencies
|
European Broadcasting Union (EBU)
|
2009-05-01 |
|
[ 68 ]
|
Mobile service parameters for sharing study in the 790-862 MHz band
|
China Mobile
,
ZTE
,
Huawei
,
DaTang
|
2009-04-30 |
|
[ 67 ]
|
Impact of existing IMT-2000 systems due to external interference
|
China (People's Republic of)
|
2009-04-30 |
|
[ 66 ]
|
Proposal of IMT system deployment model for sharing study between mobile services and ARNS service
|
China (People's Republic of)
|
2009-04-30 |
|
[ 65 ]
|
Review on the propagation model in sharing study between mobile services and ARNS service
|
China (People's Republic of)
|
2009-04-30 |
|
[ 64 ]
|
Opinion on extending GE06 Agreement to the countries in Region 3 which are not a party to the GE06 Agreement
|
China (People's Republic of)
|
2009-04-30 |
|
[ 63 ]
|
Study of sharing between mobile service and aeronautical radionavigation service in the frequency band 790-862 MHz
|
Russian Federation
|
2009-04-30 |
|
[ 62 ]
|
Addition to section 3.5 of the CPM text, Agenda item 1.17; notification under the envelope of a GE06 plan entry (5.1.3)
|
Sweden
|
2009-04-28 |
|
[ 61 ]
|
Consideration of the mobile service in the GE06 Agreement
|
France
|
2009-04-27 |
|
[ 60 ]
|
IMT system characteristics relevant to the work of JTG 5-6
|
France
|
2009-04-27 |
|
[ 59 ]
|
Preliminary draft methodologies (including interference objectives) for sharing studies between the mobile service, on the one hand, and the terrestrial broadcasting, fixed and aeronautical radionavigation services, on the other hand, in the band 790-862 MHz
|
France
|
2009-04-27 |
|
[ 58 ]
|
Proposed modification to preliminary list of broadcasting service characteristics for use in studies in the band 790-862 MHz
|
Japan
|
2009-04-23 |
|
[ 57 ]
|
Comments on the JTG 5-6 propagation model
|
Germany (Federal Republic of)
|
2009-04-16 |
|
[ 56 ]
|
Liaison statement to Radiocommunication Study Groups and Working Parties
|
Chairman, CCV
|
2009-03-20 |
Resultados :180 documentos Resultados :
Anterior -
1 -
2 -
3 -
4
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):