Contribuciones
Número
Título
Origen
AI/Cuestión
Filtro...
110-3/5
140/6
205-5/5
208-1/1
210-3/1
228/3
238-2/5
242-2/5
256/5
257/5
AI_1.15
AI1.1
AI1.10
AI1.11
AI1.12
AI1.13
AI1.14
AI1.15
AI1.16
AI1.2
AI1.3
AI1.5
AI1.6
AI1.7
AI1.9
AI1.9.1
AI1.9.2
AI1.9.5
AI2.2
AI7
AI9.1
AI9.1.2
AI9.1.3
AI9.1.5
AI9.1.9
Q140/6
Q205
Q205/5
Q205-5/5
Q208/1
Q210/1
Q210-3/1
Q212
Q212-3/5
Q236/1
Q238/5
Q242/5
Q250/5
Q254/5
Q32/6
Q37
Q37/5
Borrar filtro
Fecha
[ 342 ]
Liaison statement on the new structure of ITU-T Study Group 20
ITU-T SG 20
2017-04-05
[ 341 ]
+Ann.1
Additional information on the preparation of text for the draft CPM Report to WRC-19
Director, BR
2017-04-04
[ 340 ]
Liaison statement to Working Party 5A - 90-GHz band propagation and delay spread models for railway radiocommunication system between train and trackside (RSTT)
WP 3K
AI1.11
2017-04-04
[ 339 ]
Liaison statement to Working Parties 1A and 1B, and to their Rapporteur Group on WPT issues, to Working Party 5B, and to the Study Group 1 Rapporteur Group on liaison with CISPR and Rapporteur to CISPR on WPT issues (copy for information to Working Parties 5A, 5C, 7A & 7D) - Liaison between ITU-R and CISPR
WP 6A
2017-04-03
[ 338 ]
Liaison statement to Working Parties 1A, 1B and their Rapporteur Group on WPT issues (copy for information to Working Parties 5A, 5B, 5C, 7A & 7D) - Developments on Wireless Power Transfer under Question ITU-R 210-3/1 and issue 9.1.6 of WRC-19
WP 6A
Q210-3/1
2017-04-03
[ 337 ]
Liaison statement to Working Party 5A - Propagation models for compatibility studies regarding WRC-19 agenda item 1.16
WPs 3K and 3M
AI1.16
2017-04-03
[ 336 ]
Liaison statement to Task Group 5/1 (copy for information to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Guidance on the use of ITU-R P-Series Recommendations for interference prediction and sharing studies under WRC-19 agenda item 1.13
WPs 3K, 3J & 3M
AI1.13
2017-04-03
[ 335 ]
Reply liaison statement to Working Party 1A (copy to Working Parties 5A, 5C, 7C and 7D for information) - Request for input related to WRC-19 agenda item 1.15
WPs 3J, 3K and 3M
AI1.15
2017-03-31
[ 334 ]
Preliminary position on WRC-19 agenda
World Meteorological Organization
2017-03-20
[ 333 ]
Reply liaison statement to ITU-T Study Group 5 on seeking collaboration on draft Recommendation "Energy efficiency metrics and measurement methodology for 5G solutions" (copy to Working Parties 4A, 4C, 5A and 5C)
WP 5D
2017-02-28
[ 332 ]
Reply liaison statement to Working Party 5A on the use of Recommendation ITU-R M.1390
WP 5D
2017-02-28
[ 331 ]
Liaison statement to Working Parties 4A, 5A, 5B and 5C - Technical and operational parameters and deployment characteristics for IMT-2020 for use in sharing studies under WRC-19 agenda items
WP 5D
2017-02-28
[ 330 ]
Reply liaison statement to Working Party 1B on the progress towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] (copy to Working Parties 4A, 4C, 5A and 5C) - Regulatory tools to support enhanced shared use of the spectrum
WP 5D
2017-02-27
[ 329 ]
Liaison statement to Working Party 7B (copied for information to Working Parties 5A, 5C) - Technical characteristics for WRC-19 agenda item 1.3
WP 5D
AI1.3
2017-02-27
[ 328 ]
Liaison statement to ITU-R Coordination Committee for Vocabulary (CCV) and ITU-T Standardization Committee for Vocabulary (SCV) on broadband definition (copy to ITU-D Study Group 1 Question 2/1, ITU-R Working Parties 4A, 4B, 4C, 5A, 5C and 6A) - Broadband access technologies, including IMT, for developing countries. What is the definition of Broadband?
WP 5D
2017-02-24
[ 327 ]
Reply liaison statement to ITU-R Working Party 1B (copy to Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9) - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means...
WP 5D
2017-02-24
[ 326 ]
Liaison statement to ITU-R Working Party 6B (copy for information to ITU-R Working Party 5A) - Global Platform
WP 5D
2017-02-24
[ 325 ]
Liaison statement to ITU-R Working Party 5A on determination of Amendment 1 to Recommendation ITU-T G.9700 (2014)
ITU-T SG 15
2017-02-15
[ 324 ]
Liaison statement to ITU-D Study Group 1 Question 2/1 on broadband definition (copy to ITU-R Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D and 6A for information) - Broadband access technologies, including IMT, for developing countries. What is the definition of Broadband?
CCV and SCV
2017-01-30
[ 323 ]
(Rev.2)
Additional correspondence received Questionnaire on the usage of railway radiocommunication systems
Director, BR
2017-01-11
[ 322 ]
Liaison statement to Working Party 7B (copied for information to Working Parties 5A and 5C) - Update on the preliminary draft new Recommendation ITU-R M.[AMS-CHAR 24]
WP 5B
2016-12-16
[ 321 ]
Response liaison statement to ITU-R WP 5A on request for information on machine type communications (MTC) in the land mobile service
Director, BR
2016-12-15
[ 320 ]
Response liaison statement to ITU-R WP 5A on preliminsry information on land mobilbe service applications associated with work on WRC-19 agenda item 1.15
Director, BR
AI1.15
2016-12-15
[ 319 ]
Liaison statement to Working Party 5A (copied to Working Party 5C) - Proposed revision to Recommendation ITU-R M.2057-0 - Systems characteristics of automotive radars operating in the frequency band 76-81 GHz for intelligent transport systems applications
WP 5B
2016-12-16
[ 318 ]
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 with copy to ITU-D Study Group 1 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands...
WP 1B
2016-12-14
[ 317 ]
Reply liaison statement from ITU-R Working Party 1B to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on Resolution 9 draft output Report (copy to ITU-D Study Group 1, ITU-R Working Parties 1C and 5A)
WP 1B
2016-12-14
[ 316 ]
Reply liaison statement to Working Parties 4C, 5A, 5C and 5D on the progress towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] (copied to ITU-R Working Parties 4A and 5B, ITU-R/ITU-D Joint Group on WDTC Resolution 9 and ITU-D Study Group 1 for information)
WP 1B
2016-12-14
[ 315 ]
Reply liaison statement to Working Party 6A (copy to Working Parties 1B, 1C, 5A, 5B, 5C, 7A and 7D) - Radio frequency ranges for wireless power transmission (WPT)
WP 1A
Q210/1
2016-12-13
[ 314 ]
Reply liaison statement to Working Party 5B (copied for information to Working Parties 1B, 5A, 5C, 6A, 7A and 7D) - Radio frequency ranges or wireless power transmission using technolgies other than Radio Frequency Beam
WP 1A
Q210/1
2016-12-13
[ 313 ]
Liaison statement to Working Parties 3J, 3K, 3M, 5A, 5C, 7C and 7D on the preparations for WRC-19 agenda item 1.15 - Request for input as related to WRC-19 agenda item 1.15
WP 1A
AI1.15
2016-12-13
[ 312 ]
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[SHARING-METHODS] - Methods for sharing between radiocommunications services
WP 1A
2016-12-13
[ 311 ]
Liaison statement to Working Parties 1C, 3L, 5A, 5B, 5C, 6A, 7A and 7D - Assessment of the impact of unwanted radio frequency energy generated by non-radiocommunication equipment to radiocommunication services (Questions ITU-R 221-2/1 and ITU-R 236/1)
WP 1A
2016-12-13
[ 310 ]
Liaison statement to ITU-T Study Group 15 (copy to Working Parties 5A, 5B, 5C, 5D, 6A and 6C) - Liaison statement on determination of Amendment 1 to Recommendation ITU-T G.9700 (2014)
WP 1A
2016-12-13
[ 309 ]
Reply liaison statement to Working Party 5A - Study of sharing schemes in the land mobile service on the basis of geographical use, frequencies, services, new technologies and applications
WP 5B
2016-11-28
[ 308 ]
Liaison statement to external organisations (copy to Working Parties 5A and 5D for information) - Revision of Recommendation ITU-R F.1336-4 - Reference radiation patterns of omnidirectional, sectoral and low gain other directional antennas for the fixed and mobile services for use in sharing studies in the frequency range from 400 MHz to about 70 GHz
WP 5C
2016-11-24
[ 307 ]
Recommendation ITU-R P.681-9 - Propagation data required for the design of Earth-space land mobile telecommunication systems
SG 3
2016-11-24
[ 306 ]
Liaison statement to Working Parties 5A and 5D, ITU-T Study Groups 13 and 15, Metro Ethernet Forum (MEF) and Next Generation Mobile Networks (NGMN)
WP 5C
2016-11-24
[ 305 ]
Reply liaison statement - Technical and operational characteristics of digital land mobile related to WIA
European Telecommunications Standards Institute
2016-11-04
[ 304 ]
Reply liaison statement - Technical and operational characteristics of digital land mobile related to PMR
European Telecommunications Standards Institute
2016-11-04
[ 303 ]
Liaison statement on LTE-based vehicle-to-vehicle communications
Director, BR
2016-11-09
[ 302 ]
Report on the recent activities of wireless world research forum (WWRF)
WWRF Liaison Rapporteur
2016-11-21
[ 301 ]
Liaison statement from ITU-R /ITU-D Joint Group on WTDC Resolution 9 to ITU-R Study Group 1, Working Parties 1B, 1C and 5A on Resolution 9 Draft Output Report
ITU-D SG 1
2016-11-21
[ 300 ]
Reply liaison statement to Working Party 1A copied to Working Parties 1A, 3J, 3M, 4A, 4C 5A, 5C and 5D - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an erarth station in the frequency bands between 100 MHz and 105 GHz
WP 5B
2016-11-18
[ 299 ]
Reply liaison statement to ITU-D Study Group 2 (copy to Working Parties 1B, 1C, 3L, 4A, 5A, 5C, 6A for information) - ITU-D Question 7/2: strategies and policies concerning human exposure to electromagnetic fields
WP 5B
2016-11-18
[ 298 ]
+Ann.1-31
Report on the meeting of Working Party 5A (Geneva, 7-17 November 2016)
Chairman, WP 5A
2016-11-17
[ 297 ]
Final list of participants - Working Party 5A (Geneva, 7-17 November 2016)
Director, BR
2016-11-17
[ 296 ]
Reply liaison statement to Working Party 1A (copy to Working Parties 1B, 5A, 5B, 6A, 7A and 7D for information) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
WP 5C
2016-11-17
[ 295 ]
Reply liaison statement to Working Party 5A - Technical and operational characteristics of radiodetermination systems relevant to the work under WRC-19 agenda item 1.16
WP 5B
AI1.16
2016-11-16
[ 294 ]
Liaison statement to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D (copy to Task Group 5/1 for information) - Revision of Recommendation ITU-R F.699-7 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70 GHz
WP 5C
2016-11-16
[ 293 ]
Reply liaison statement to Working Party 5B on technical characteristics for the fixed service for studies under WRC-19 agenda item 1.9.2 (copy to Working Parties 1A, 3M, 4C, 5A, 6A, 7B and 7D for information)
WP 5C
AI1.9.2
2016-11-16
Resultados :1092 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22
- Siguiente
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):