Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1615 ]
(Rev.1) |
MSI Mismatch alarm issues connected with Auto PT enabled systems interconnecting new OTN equipment (PT=21) with old equipment (PT=20)
|
Ciena Corporation
|
Q9/15, Q11/15
|
2011-11-19 |
|
[ 1614 ]
(Rev.1) |
Protection switching at the E-NNI for multi-stage multiplexed OTN
|
Ciena Corporation
|
Q9/15
|
2011-11-19 |
|
[ 1613 ]
(Rev.1) |
Proposal to include 1+1 and 1:n bidirectional cases for the SNC/N protection subclass in Rec. G.873.1
|
Ciena Corporation
|
Q9/15
|
2011-11-19 |
|
[ 1612 ]
(Rev.1) |
G.873.1 Addition of CL-SNCG/S Protection
|
Ciena Corporation
|
Q9/15
|
2011-11-19 |
|
[ 1611 ]
(Rev.1) |
Proposed Corrections to Table 7-1 of G.873.1
|
Ciena Corporation
|
Q9/15
|
2011-11-19 |
|
[ 1610 ]
(Rev.1) |
Management of G.872 v2 (aon)
|
Ciena Corporation
|
Q14/15, Q12/15
|
2011-11-19 |
|
[ 1609 ]
(Rev.1) |
Clarification of OTN Maintenance Signalling in G.798.1
|
Ciena Corporation
|
Q9/15
|
2011-11-19 |
|
[ 1608 ]
(Rev.1) |
Considerations for ODU5
|
Alcatel-Lucent USA Inc.
|
Q6/15, Q11/15
|
2011-11-19 |
|
[ 1607 ]
(Rev.1) |
Study of maximum absolute time error accumulation in a chain of Boundary Clocks with time filtering and with Physical Layer frequency assist
|
Anue Systems
|
Q13/15
|
2011-11-18 |
|
[ 1606 ]
(Rev.1) |
Simulation results regarding spectrum of time-stamping granularity error
|
Anue Systems
|
Q13/15
|
2011-11-18 |
|
[ 1605 ]
(Rev.1) |
Reduction of impact of time-stamping granularity noise on time transfer error
|
Anue Systems
|
Q13/15
|
2011-11-18 |
|
[ 1604 ]
(Rev.1) |
Sliding versus jumping windows
|
Anue Systems
|
Q13/15
|
2011-11-18 |
|
[ 1603 ]
(Rev.1) |
Floor Packet Population PDV limit for two-way methods
|
Anue Systems
|
Q13/15
|
2011-11-18 |
|
[ 1602 ]
(Rev.1) |
Test Case for 150us cluster and 200s window
|
Anue Systems
|
Q13/15
|
2011-11-18 |
|
[ 1601 ]
(Rev.1) |
Observations on the framework of Floor Population Metrics for PDV Limits
|
Anue Systems
|
Q13/15
|
2011-11-18 |
|
[ 1600 ]
(Rev.1) |
Developing a graphical understanding of floor population PDV metrics
|
Anue Systems
|
Q13/15
|
2011-11-18 |
|
[ 1599 ]
(Rev.1) |
Names and formulae for floor population metrics
|
Anue Systems
|
Q13/15
|
2011-11-18 |
|
[ 1598 ]
(Rev.1) |
Draft Recommendation G.smp.signalling
|
Huawei Technologies Co. Ltd.
,
Infinera Corporation
|
Q9/15
|
2011-11-18 |
|
[ 1597 ]
|
Observations regarding floor population percentage measurements
|
Anue Systems
|
Q13/15
|
2011-11-18 |
|
[ 1596 ]
(Rev.1) |
PDV network limit in G.8261.1
|
Telefon AB - LM Ericsson
|
Q13/15
|
2011-11-18 |
|
[ 1595 ]
(Rev.1-2) |
Intra-site Time Sync Requirements in G.8271
|
Telefon AB - LM Ericsson
|
Q13/15
|
2011-11-18 |
|
[ 1594 ]
(Rev.1) |
Progress on G.8021.1
|
Ciena Corporation
|
Q9/15, Q12/15
|
2011-11-18 |
|
[ 1593 ]
(Rev.1) |
Editing of G.8010 V2
|
Ciena Corporation
|
Q12/15
|
2011-11-18 |
|
[ 1592 ]
(Rev.1) |
E-OTN work overlap among Questions
|
Ciena Corporation
|
Q9/15, Q12/15, Q10/15
|
2011-11-18 |
|
[ 1591 ]
(Rev.1-3) |
EEC with enhanced Holdover
|
Telefon AB - LM Ericsson
|
Q13/15
|
2011-11-18 |
|
[ 1590 ]
(Rev.1) |
New Appendix B for G.8021.1
|
Ciena Corporation
|
Q9/15
|
2011-11-18 |
|
[ 1589 ]
(Rev.1) |
Noise Generation in G.8263
|
Telefon AB - LM Ericsson
|
Q13/15
|
2011-11-18 |
|
[ 1588 ]
(Rev.1) |
Input for G.8021.1 Clauses 8.1 and 8.2
|
Ciena Corporation
|
Q9/15
|
2011-11-18 |
|
[ 1587 ]
(Rev.1) |
Proposal for text concerning packet selection in G.8260
|
Telefon AB - LM Ericsson
|
Q13/15
|
2011-11-18 |
|
[ 1586 ]
(Rev.1) |
Discussion on reference points and network limits in G.8271
|
Telefon AB - LM Ericsson
|
Q13/15
|
2011-11-18 |
|
[ 1585 ]
(Rev.1) |
Input for G.8021.1 Clause 8
|
Ciena Corporation
|
Q9/15
|
2011-11-18 |
|
[ 1584 ]
|
Withdrawn: Duplicate of C-1585
Withdrawn
|
Ciena Corporation
|
|
2011-11-18 |
|
[ 1583 ]
(Rev.1) |
Proposal for network limits in G.8271
|
Telefon AB - LM Ericsson
|
Q13/15
|
2011-11-18 |
|
[ 1582 ]
(Rev.1) |
Input for G.8021.1 Appendix A
|
Ciena Corporation
|
Q9/15
|
2011-11-18 |
|
[ 1581 ]
(Rev.1) |
Proposal for Distributed G.8031 Amendment
|
Fujitsu Network Communications, Inc.
|
Q9/15
|
2011-11-18 |
|
[ 1580 ]
(Rev.1) |
Proposal for Distributed G.873.1 Amendment
|
Fujitsu Network Communications, Inc.
|
Q9/15
|
2011-11-18 |
|
[ 1579 ]
(Rev.1) |
Comments on the recent G.798 change for the dTLC contribution to aAIS and aTSF
|
PMC-Sierra, Inc.
|
Q9/15
|
2011-11-18 |
|
[ 1578 ]
(Rev.1) |
Network Defect Handling for Hitless Adjustment to ODUflex(GFP) (HAO) During Bandwidth Resizing (BWR)
|
PMC-Sierra, Inc.
|
Q11/15
|
2011-11-18 |
|
[ 1577 ]
(Rev.1) |
Hitless Adjustment to ODUflex(GFP) (HAO) Performance Parameters During Bandwidth Resizing (BWR) - Measurement Time References
|
PMC-Sierra, Inc.
|
Q11/15
|
2011-11-18 |
|
[ 1576 ]
(Rev.1) |
ODUflex related extensions to information model in G.874.1
|
Infinera Corporation
|
Q14/15
|
2011-11-18 |
|
[ 1575 ]
(Rev.1) |
Mapping between G.798 atomic functions and G.874.1 managed objects
|
Infinera Corporation
|
Q14/15
|
2011-11-18 |
|
[ 1574 ]
(Rev.1) |
Hitless Adjustment to ODUflex(GFP) (HAO) Performance Parameters During Bandwidth Resizing (BWR) - Latency-based Approach
|
PMC-Sierra, Inc.
|
Q11/15
|
2011-11-18 |
|
[ 1573 ]
(Rev.1) |
Flexible Rate OTU signal
|
Finisar Corporation
,
Infinera Corporation
,
Verizon Communication Corporation
|
Q6/15, Q12/15, Q11/15
|
2011-11-18 |
|
[ 1572 ]
(Rev.1) |
G.inp: Crosstalk management in PET mode
|
Metanoia Technologies, Inc.
|
Q4/15
|
2011-11-18 |
|
[ 1571 ]
(Rev.1) |
G.8263 : PEC-S-F state under limits of noise tolerance
|
Cisco Systems, Inc.
|
Q13/15
|
2011-11-18 |
|
[ 1570 ]
(Rev.1) |
Utilization of IP mapping for hop-by-hop BC model
|
Cisco Systems, Inc.
|
Q13/15
|
2011-11-18 |
|
[ 1569 ]
(Rev.1) |
Two-step clock issue with multicast transmission
|
Cisco Systems, Inc.
|
Q13/15
|
2011-11-18 |
|
[ 1568 ]
|
Proposal and Comments on MPLS-TP
|
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
|
Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15
|
2011-11-18 |
|
[ 1567 ]
|
Principle of Cooperation and Lines of Responsibility
|
AT&T, Inc.
,
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
|
QALL/15
|
2011-11-18 |
|
[ 1566 ]
|
Proposed text for G.8121.2 for Performance Monitoring processes
|
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Nokia Siemens Networks GmbH & Co. KG
|
Q9/15
|
2011-11-18 |
Results:2390 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):