Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 113 ]
|
IWF in G.8261
|
Ericsson
|
Q13/15
|
2006-10-18 |
|
[ 112 ]
|
Discussion on IWF model (G.pacmod living list item 2)
|
Ericsson
|
Q13/15
|
2006-10-18 |
|
[ 111 ]
|
Proposals for Service Clock and Network Clock in G.8261 and G.paclock
|
Ericsson
|
Q13/15
|
2006-10-18 |
|
[ 110 ]
|
Packet Network reference Models in G.8261
|
Ericsson
|
Q13/15
|
2006-10-18 |
|
[ 109 ]
|
MPLS in the G.8261 scope
|
Ericsson
|
Q13/15
|
2006-10-18 |
|
[ 108 ]
|
Proposals for corrections in ITU-T G.8261
|
Ericsson
|
Q13/15
|
2006-10-18 |
|
[ 107 ]
|
Comments on G.smx draft 0.2
|
Italy
|
Q10/15
|
2006-10-18 |
|
[ 106 ]
|
Some proposals for characterizing the transient response of OADMs, ROADMs and PXCs in G.otf
|
Italy
|
Q7/15, Q6/15
|
2006-10-18 |
|
[ 105 ]
|
Proposals for the revision of G.697
|
Telecom Italia
|
Q6/15
|
2006-10-18 |
|
[ 104 ]
|
Proposal to include in G.959.1 very-long-haul 10G application codes based on the duobinary modulation format, capable to tolerate up to 3200 ps/nm of residual chromatic dispersion with no need of dispersion compensation
|
Marconi
|
Q6/15
|
2006-10-18 |
|
[ 103 ]
|
All Optical Packet Networks: outcomes of the IST LASAGNE project
|
Telecom Italia
|
Q7/15, Q6/15, Q12/15
|
2006-10-18 |
|
[ 102 ]
|
Proposal for the collaboration activities to study GPON and next generation PON management
|
NTT
|
Q2/15
|
2006-10-18 |
|
[ 101 ]
|
Proposal of new draft Recommendation of wavelength allocation for PON
|
NTT
|
Q2/15
|
2006-10-18 |
|
[ 100 ]
|
G.vdsl, G.hs: proposed draft texts of Handshake specifications for G.993.2 Amendment 1 Annex C
|
NTT
,
Sumitomo Electrics
,
NEC
,
Fujitsu
,
ACCA Networks
|
Q4/15
|
2006-10-18 |
|
[ 99 ]
|
G.paclock draft rearrangement
|
Zarlink Semiconductor
|
Q13/15
|
2006-10-18 |
|
[ 98 ]
|
G.paclock alignment with G.813 for Synchronous Ethernet
|
Zarlink Semiconductor
|
Q13/15
|
2006-10-18 |
|
[ 97 ]
|
G.paclock - Wander Tolerance test results for Synchronous Ethernet
|
Zarlink Semiconductor
|
Q13/15
|
2006-10-18 |
|
[ 96 ]
|
G.paclock - Wander Tolerance for Synchronous Ethernet
|
Zarlink Semiconductor
|
Q13/15
|
2006-10-18 |
|
[ 95 ]
|
G.paclock - Scope
|
Zarlink Semiconductor
|
Q13/15
|
2006-10-18 |
|
[ 94 ]
|
ITU-T G.8261 - Reference missing in Recommendation Proposals for corrections in ITU-T G.8261
|
Zarlink Semiconductor
|
Q13/15
|
2006-10-18 |
|
[ 93 ]
|
Comment on G.8021 and G.8010
|
BT
|
Q12/15, Q9/15
|
2006-10-18 |
|
[ 92 ]
|
Comments on G.8110.1
|
BT
|
Q12/15
|
2006-10-18 |
|
[ 91 ]
|
Comment on G.8021
|
BT
|
Q9/15
|
2006-10-18 |
|
[ 90 ]
|
ADSL:G.vdsl: Control parameters and performance of a retransmission scheme
|
Broadcom
|
Q4/15
|
2006-10-18 |
|
[ 89 ]
|
Unified model - Topology
|
Nortel Networks (Canada)
|
Q12/15
|
2006-10-18 |
|
[ 88 ]
|
Unified model - Symbols and conventions
|
Nortel Networks (Canada)
|
Q12/15
|
2006-10-18 |
|
[ 87 ]
|
Unified model - Identifiers
|
Nortel Networks (Canada)
|
Q12/15
|
2006-10-18 |
|
[ 86 ]
|
Unified model - Division of layer network resources
|
Nortel Networks (Canada)
|
Q12/15
|
2006-10-18 |
|
[ 85 ]
|
Unified Model - Sublayers
|
Nortel Networks (Canada)
|
Q12/15
|
2006-10-18 |
|
[ 84 ]
|
Unified Model - Network Management Aspects
|
Nortel Networks (Canada)
|
Q12/15
|
2006-10-18 |
|
[ 83 ]
|
PBB Model For G.8010v2 Appendix III and related G.8010v2 & G.8021v2 sections
|
Nortel Networks (Canada)
|
Q9/15, Q12/15
|
2006-10-18 |
|
[ 82 ]
|
Resilient Packet Ring for G.8010
|
Nortel Networks (Canada)
|
Q12/15, Q9/15
|
2006-10-18 |
|
[ 81 ]
|
Ethernet Ring Protection Scheme - Ring Steering
|
Nortel Networks (Canada)
|
Q9/15
|
2006-10-18 |
|
[ 80 ]
|
Ethernet priorities
|
Nortel Networks (Canada)
|
Q14/15, Q11/15, Q9/15, Q12/15
|
2006-10-18 |
|
[ 79 ]
|
G.813 clock for Synchronous Ethernet equipment
|
Nortel Networks (Canada)
|
Q13/15
|
2006-10-18 |
|
[ 78 ]
|
RPR for G.8021
|
Nortel Networks (Canada)
|
Q9/15
|
2006-10-18 |
|
[ 77 ]
|
Ethernet Ring Requirements by Network Segment
|
Nortel Networks (Canada)
|
Q9/15, Q12/15
|
2006-10-18 |
|
[ 76 ]
|
Terminology for G.paclock
|
Telcordia
|
Q13/15
|
2006-10-18 |
|
[ 75 ]
|
Proposed PBB model and I-Tag definition issue
|
Alcatel
|
Q12/15
|
2006-10-18 |
|
[ 74 ]
|
Considerations in synchronous Ethernet equipment provisioning
|
Symmetricom
|
Q13/15
|
2006-10-18 |
|
[ 73 ]
|
Protocol specific rate limiting
|
PMC Sierra
|
Q2/15
|
2006-10-18 |
|
[ 72 ]
|
Proposed Amendment 2 to G.7043/Y.1343
|
PMC Sierra
|
Q11/15
|
2006-10-18 |
|
[ 71 ]
|
Proposed Corrigendum to ITU-T Rec. G.7041 (GFP)
|
PMC Sierra
|
Q11/15
|
2006-10-18 |
|
[ 70 ]
|
VDSL2: Follow up on proposed baseline text for OLR mechanism
|
Conexant Systems
,
Ikanos Communications
|
Q4/15
|
2006-10-18 |
|
[ 69 ]
|
G.hn: The LLC sub-layer functions
|
CopperGate Communications
|
Q4/15
|
2006-10-18 |
|
[ 68 ]
|
G.vdsl2 - Revised European Operator Requirements for VDSL2 Band Plan Extensions
|
BT
,
Telefónica O2 Czech Republic
,
Deutsche Telekom
,
Swisscom
,
Teliasonera
,
Telenor
,
Telecom Italia
,
France Telecom
|
Q4/15
|
2006-10-18 |
|
[ 67 ]
|
Protocol extension for automatic discovery in OTN networks
|
ETRI
|
Q14/15
|
2006-10-18 |
|
[ 66 ]
|
G.VDSL2: Proposed update of G.993.2 Annex A
|
Ikanos
,
Infineon
,
AT&T
,
Conexant
,
Aktino
|
Q4/15
|
2006-10-17 |
|
[ 65 ]
|
Clarifications for 1-Phase/2-Phase APS protocols for G.8031
|
Mitsubishi
|
Q9/15
|
2006-10-17 |
|
[ 64 ]
|
Proposal for Appendix of G.666
|
Lucent Technologies Germany
,
Deutsche Telekom
|
Q7/15
|
2006-10-17 |
Results:913 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):