Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 102 ]
|
Proposal to revise and modify on ITU-T K.116 "Electromagnetic compatibility requirements and test methods for radio telecommunication terminal equipment "
|
National Telecommunications Corporation (NTC)- Sudan
|
Q3/5
|
2017-10-26 |
|
[ 101 ]
(Rev.1) |
Initial Text for L.MAAP (Methodology for assessing the aggregated positive impact of ICT in other sectors)
|
Nokia Corporation
|
Q9/5
|
2017-10-26 |
|
[ 100 ]
|
Update on: ITU-T L.CE - Circular Economy: - Guideline to migrate to circular ICT network infrastructure (TD139)
|
Royal KPN N.V.
|
Q7/5
|
2017-10-25 |
|
[ 99 ]
|
Connect 2020 agenda E-Waste reduction
|
Royal KPN N.V.
|
Q7/5
|
2017-10-25 |
|
[ 98 ]
(Rev.1) |
Proposed second draft "Supplement to K.soft_des for Soft error measures of FPGA"
|
Fujitsu Limited
,
Hitachi, Ltd.
,
NEC Corporation
,
Nippon Telegraph and Telephone Corporation (NTT)
,
Oki Electric Industry Company Ltd. (OKI)
,
Xilinx Incorporation
|
Q5/5
|
2017-10-25 |
|
[ 97 ]
(Rev.1) |
Provide the information of the Japanese electric and information technology industries activities about the Green IT/IoT
|
Fujitsu Limited
,
Hitachi, Ltd.
,
NEC Corporation
|
Q9/5
|
2017-10-25 |
|
[ 96 ]
|
Report on contribution of SG5RG-ARB Group in the SG20RG- ARB meeting 10th of August
|
Ministry of Communication and Information Technology (MCIT)-Egypt
|
QALL/5
|
2017-10-17 |
|
[ 95 ]
|
Screened, shielded and coaxial cable definitions for K.44
|
Bourns Limited
|
Q2/5
|
2017-10-17 |
|
[ 94 ]
|
TD 123 K.44 8/20 generator artwork check
|
Bourns Limited
|
Q2/5
|
2017-10-17 |
|
[ 93 ]
|
Extended Producer Responsibility Assessment Report
|
Centre for Environment and Development for the Arab Region and Europe (CEDARE)-Egypt
|
Q7/5
|
2017-10-16 |
|
[ 92 ]
|
Ethernet port differential surge test with reduced i²t
|
Bourns Limited
|
Q2/5
|
2017-10-15 |
|
[ 91 ]
|
Ethernet port current surge parameters
|
Bourns Limited
|
Q2/5
|
2017-10-14 |
|
[ 90 ]
(Rev.1) |
Confusion with what tests need to be done for PoE interfaces.
|
ADTRAN
|
Q2/5
|
2017-10-09 |
|
[ 89 ]
(Rev.1) |
External enhanced transverse test of 6 kV is too extreme for normal Ethernet port topologies.
|
ADTRAN
|
Q2/5
|
2017-10-09 |
|
[ 88 ]
(Rev.1) |
Align Ethernet & PoE K.20 internal transverse surge tests
|
ADTRAN
|
Q2/5
|
2017-10-09 |
|
[ 87 ]
(Rev.1) |
Simultaneous port to earth test are extreme for internal building applications.
|
ADTRAN
|
Q2/5
|
2017-10-09 |
|
[ 86 ]
(Rev.1) |
Test description in the test tables is incorrect for the type of test (A.6.7-3a).
|
ADTRAN
|
Q2/5
|
2017-10-09 |
|
[ 85 ]
(Rev.1) |
Shield bond test levels are extreme for internal building applications
|
ADTRAN
|
Q2/5
|
2017-10-09 |
|
[ 84 ]
(Rev.1) |
Test description in the test tables is incorrect for the type of test (A.6.7-6).
|
ADTRAN
|
Q2/5
|
2017-10-09 |
|
[ 83 ]
|
The case for greater due diligence by the ICT Sector and the need to focus on the environment
|
Ministère des Postes, Télécommunications et Nouvelles Technologies de l'Information et de la Communication-Dem.Rep. of the Congo
|
Q7/5
|
2017-10-06 |
|
[ 82 ]
(Rev.1) |
Suggestions for K.99 Surge protective component application guide - Gas discharge tubes
|
Littelfuse UK Ltd.
|
Q2/5
|
2017-09-26 |
|
[ 81 ]
(Rev.1-2) |
Procedures to reduce the damage of non-ionizing radiation in my developing country
|
Ministry of Telecommunications and Information Technology-Yemen
|
Q3/5
|
2017-09-20 |
|
[ 80 ]
(Rev.1) |
Addressing all shielded data ports including USB
|
ADTRAN
|
Q2/5
|
2017-09-19 |
|
[ 79 ]
|
Human Exposure to electromagnetic fields radiated by information and communication technologies (ICTs)
|
Ministère des Postes, des Télécommunications et de l'Economie Numérique - Guinea (Conakry)
|
Q3/5
|
2017-09-18 |
|
[ 78 ]
(Rev.1) |
K.20 & K.21 internal cable length of 10 meter or less are exempt
|
ADTRAN
|
Q2/5
|
2017-09-13 |
|
[ 77 ]
|
Suggestions for new work on circular economy and resource efficiency in ITU-T
|
Huawei Technologies Co., Ltd.
,
Royal KPN N.V.
|
Q7/5
|
2017-05-03 |
|
[ 76 ]
|
The power frequency magnetic field (PFMF) control of ICT equipment rooms and PFMF immunity requirement for ICT equipment for ITU-T K.idc
|
Huawei Technologies Co., Ltd.
|
Q1/5
|
2017-05-03 |
|
[ 75 ]
|
Characteristics of Metal Oxide Varistors (MOVs) for the protection of telecommunications installations
|
Huawei Technologies Co., Ltd.
|
Q2/5
|
2017-05-03 |
|
[ 74 ]
|
The lightning test proposal of the Ethernet port and errata in K.20, K.21 and K.45
|
Huawei Technologies Co., Ltd.
|
Q2/5
|
2017-05-03 |
|
[ 73 ]
|
The lightning test proposal of the USB in K.20 and K.21
|
Huawei Technologies Co., Ltd.
|
Q2/5
|
2017-05-03 |
|
[ 72 ]
|
Dangerous effects and protective measures against electromagnetic disturbances when internet data centre is co-sited with high-voltage substation
|
Huawei Technologies Co., Ltd.
|
Q1/5
|
2017-05-03 |
|
[ 71 ]
|
3-Electrode GDT operation in Ethernet circuits
|
Bourns Limited
|
Q2/5
|
2017-05-02 |
|
[ 70 ]
|
Withdrawn due to duplication
|
N/A (no se aplica)
|
|
2017-05-02 |
|
[ 69 ]
|
Withdrawn due to duplication
|
N/A (no se aplica)
|
|
2017-05-02 |
|
[ 68 ]
(Rev.1) |
Re-radiation influence
|
Agência Nacional de Telecomunicações - ANATEL
,
Brazil
|
Q3/5
|
2017-05-02 |
|
[ 67 ]
(Rev.1) |
Mobile App "EMF Exposure"
|
Agência Nacional de Telecomunicações - ANATEL
|
Q3/5
|
2017-05-02 |
|
[ 66 ]
(Rev.1) |
Study performed on a 2 degrees trajectory for the ICT sector
|
Nokia Corporation
,
Orange
,
Telefon AB - LM Ericsson
|
Q9/5
|
2017-05-02 |
|
[ 65 ]
(Rev.1) |
Proposal of creation of a database on GHG emissions
|
Orange
,
Nokia Corporation
,
Telefon AB - LM Ericsson
|
Q9/5
|
2017-05-02 |
|
[ 64 ]
|
Appendix proposal for K.99 on GDT Component Form Factors
|
Bourns Limited
|
Q2/5
|
2017-05-02 |
|
[ 63 ]
(Rev.1) |
Assessment of Positive Environmental Impacts of ICT
|
Nokia Corporation
,
Orange
,
Telefon AB - LM Ericsson
|
Q9/5
|
2017-05-02 |
|
[ 62 ]
(Rev.1) |
Recommendation L.mmNFV - Measurement method for energy efficiency of Network Function Virtualization
|
Consorzio Nazionale Interuniversitario per le Telecomunicazioni
,
Huawei Technologies Co., Ltd.
|
Q6/5
|
2017-05-02 |
|
[ 61 ]
|
Proposed inputs for the draft of L. GSTNI: Renewable Energy Power Supply Systems - Self-Recharging Energy System
|
Ministry of Communications and Multimedia Malaysia
|
Q6/5
|
2017-05-02 |
|
[ 60 ]
|
Member states status report on the deployment of green or environment friendly ICT project
|
Ministry of Communications and Multimedia Malaysia
|
QALL/5
|
2017-05-02 |
|
[ 59 ]
|
Localised Weather Alert Service to Fishing Villages on Lake Victoria
|
Egypt
|
Q8/5
|
2017-05-02 |
|
[ 58 ]
|
New Baseline Document for work item L.AF adaptation of the fisheries sector to the effects of climate change using ICTs
|
Egypt
|
Q8/5
|
2017-05-02 |
|
[ 57 ]
(Rev.1) |
Proposal new Work Item on a Sector-based methodology for the assessment of the environmental impact of ICT
|
Ministerio de Comunicaciones, Argentina
|
Q9/5
|
2017-05-02 |
|
[ 56 ]
(Rev.1) |
Creation of a Regional Group for Latin America on Environment, Climate Change and Circular Economy within ITU-T Study Group 5
|
Argentina
,
Colombia
,
Paraguay
,
Uruguay
|
QALL/5
|
2017-05-02 |
|
[ 55 ]
|
Review of K.20, K.21, K.44 and K.45 - Part 3 K.44 generators and test circuits
|
Bourns Limited
|
Q2/5
|
2017-05-02 |
|
[ 54 ]
|
Review of K.20, K.21, K.44 and K.45 - Part 2 K.20, K.21 and K.45 Test tables columns 4 and 5
|
Bourns Limited
|
Q2/5
|
2017-05-02 |
|
[ 53 ]
(Rev.1) |
New working item proposal on assessment specifications for sustainable design of mobile phone
|
Ministry of Industry and Information Technology (MIIT), China
|
Q9/5
|
2017-05-02 |
Resultados :902 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):