Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 239 ]
|
Information document related to WP 5D activity on the development of a preliminary draft new Report IMT.[LOW POWER]
|
United States of America
|
|
2013-01-22 |
|
[ 238 ]
|
Proposed modifications to the working document towards a preliminary draft new Report [BROAD.PPDR] - The use of International Mobile Telecommunications (IMT) for Broadband Public Protection and Disaster Relief (PPDR) applications
|
Motorola Solutions Inc.
|
|
2013-01-22 |
|
[ 237 ]
|
Comments on the working document towards a PDNR on the use of IMT for broadband PPDR applications
|
Institute of Electrical and Electronics Engineers, Inc.
|
|
2013-01-22 |
|
[ 236 ]
|
United States input on working document towards a preliminary draft new Report IMT.[LOW POWER]
|
United States of America
|
|
2013-01-22 |
|
[ 235 ]
|
Input on working document towards a preliminary draft new Recommendation ITU-R M.IMT.VISION]
|
United States of America
|
|
2013-01-22 |
|
[ 234 ]
|
Proposed revisions to the working document toward a preliminary draft new Report[BROAD.PPDR], "The use of International Mobile Telecommunications (IMT) for broadband Public Protection and Disaster Relief (PPDR) applications"
|
United States of America
|
|
2013-01-22 |
|
[ 233 ]
|
Proposed structure and content for draft liaison statement to JTG 4-5-6-7 on suitable frequency ranges under WRC-15 Agenda item 1.1
|
United States of America
|
|
2013-01-22 |
|
[ 232 ]
|
Possible extension of the 2 100 MHz band for IMT systems
|
Telstra Corporation Ltd.
|
|
2013-01-22 |
|
[ 231 ]
|
Spectrum efficiency estimates for IMT-Advanced systems for use in estimating future spectrum requirements
|
Telstra Corporation Ltd.
|
|
2013-01-22 |
|
[ 230 ]
(Rev.1) |
Report on the recent activities of Wireless World Research Forum (WWRF)
|
WWRF Liaison Rapporteur
|
|
2013-01-21 |
|
[ 229 ]
|
Proposals on deployment-related parameters of IMT systems in the frequency range below 1 GHz proposed to be used in sharing studies on WRC-15 Agenda items 1.1 and 1.2
|
Russian Federation
|
|
2013-01-21 |
|
[ 228 ]
|
The 5 925-6 425 MHz frequency range suitability description
|
Russian Federation
|
|
2013-01-21 |
|
[ 227 ]
|
Issues to be considered in developing response to liaison statement from JTG 4-5-6-7 on spectrum requirements related to WRC-15 Agenda item 1.1
|
Russian Federation
|
|
2013-01-21 |
|
[ 226 ]
|
Input to the development of the working document towards a preliminary draft new Report on the use of IMT for broadband PPDR applications
|
Australia
|
|
2013-01-18 |
|
[ 225 ]
|
Input to studies towards WRC-15 Agenda item 1.1 - Assessment of the suitability of specific frequency ranges for IMT
|
Australia
|
|
2013-01-18 |
|
[ 224 ]
|
Update Report on CITEL PCC.II activities
|
CITEL Rapporteur
|
|
2013-01-17 |
|
[ 223 ]
|
Reply liaison statement from Working Party 5D on parameters for LTE-Advanced and WirelessMAN Advanced for use in sharing studies
|
Director, BR
|
|
2012-12-11 |
|
[ 222 ]
|
Reply liaison statement on parameters for LTE-Advanced and WirelessMAN Advanced for use in sharing studies
|
Director, BR
|
|
2012-12-11 |
|
[ 221 ]
|
Ecuador approves A5-APT segmentation model for the 700 MHz band
|
Ecuador
|
|
2012-12-11 |
|
[ 220 ]
|
Liaison statement to Study Groups 4, 5, 6 and 7 and Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D as concerned Groups for WRC-15 Agenda item 1.1 - Preparations for WRC-15 Agenda item 1.1 - Technical and operational characteristics
|
JTG 4-5-6-7
|
|
2012-12-06 |
|
[ 219 ]
|
Liaison statement to Working Parties 5D and 6A (copy to Working Party 1A for information) - Adjacent band compatibility between the mobile broadband uplink and digital terrestrial television broadcasting under WRC-15 Agenda item 1.2
|
JTG 4-5-6-7
|
|
2012-11-30 |
|
[ 218 ]
|
Liaison statement to Working Party 3K (copy to Working Parties 3M, 6A, 5D and 5B for information) - Appropriate propagation information where a current Recommendation may not seem to be wholly applicable
|
JTG 4-5-6-7
|
|
2012-11-30 |
|
[ 217 ]
|
Liaison statement to Working Parties 5A and 5D - Spectrum requirements related to WRC-15 Agenda item 1.1
|
JTG 4-5-6-7
|
|
2012-11-30 |
|
[ 216 ]
|
Liaison statement to Working Parties 4A, 7B, 7C and 7D (copy to Working Parties 5B, 5C and 5D) - WRC-15 Agenda item 1.6 - Characteristics of and protection criteria for mobile systems operating in the frequency range 14.5-15.35 GHz
|
WP 5A
|
|
2012-11-21 |
|
[ 215 ]
|
Liaison statement to working Party 4A, 5C and 5D - WRC-15 Agenda item 1.6 - Technical characteristics of and protection criteria for aeronautical mobile systems operating in the frequency range 14.5-15.38
|
WP 5B
|
|
2012-11-19 |
|
[ 214 ]
|
Liaison statement to Joint Task Group 4-5-6-7 and Study Group 4, 5, 6 and 7 - WRC-15 Agenda item 1.1 - Modelling considerations and other considerations for 5-6 GHz frequency range
|
WP 5B
|
|
2012-11-16 |
|
[ 213 ]
|
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties (4A, 4B, 4C, 5B, 5C 5D, 6A, 7B, 7C, 7D 1A, 3K 3M) for information) - WRC-15 Agenda item 1.1 - Working Party 5A initial information on spectrum requirements studies for WRC-15 Agenda item 1.1
|
WP 5A
|
|
2012-11-16 |
|
[ 212 ]
|
Liaison statement to Joint Task Group 4-5-6-7 (copy to Workin Parties (4A, 4B, 4C 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) for information) - WRC-15 Agenda item 1.1 - Sharing considerations for the 5-6 GHz frequency range for WRC-15 Agenda item 1.1
|
WP 5A
|
|
2012-11-16 |
|
[ 211 ]
(Rev.1) |
Liaison statement to ITU-R Working Parties 1A, 4C, 5D, 6A, 7C and 7D (copy to ITU-R Working Party 3L and to ITU-T Study Groups 5, 9 and 15 for information and/or action if any)
|
WPs 5A, 5B and 5C
|
|
2012-11-16 |
|
[ 210 ]
|
Liaison statement to Working Party 5D (copy to Joint Task Group 4-5-6-7) - Applicability of the sectoral antenna pattern approximations in Recommendation ITU-R F.1336-3 to the frequency range below 1 GHz
|
WPs 5A and 5C
|
|
2012-11-14 |
|
[ 209 ]
|
Liaison statement to ITU-R Working Party 5D and 5A - World Radiocommunication Conference (WRC-15 Agenda item 1.15)
|
WP 5B
|
|
2012-11-14 |
|
[ 208 ]
|
Liaison statement to ITU-D Study Group 2 (copy to ITU-T Study Group 13 Question 15/13 and ITU-R Working Parties 4B and 5D for information) - ITU-D Report on access technology for broadband telecommunications including IMT, for developing countries
|
WP 5C
|
|
2012-11-14 |
|
[ 207 ]
|
Liaison statement to Working Party 5D (copied to ITU-D Study Group 2, ITU-T Study Group 13 Question 15/13 and ITU-R Working Party 4B for information) - Handbook on "Global Trends in IMT"
|
WP 5C
|
|
2012-11-14 |
|
[ 206 ]
|
Liaison statement to Working Party 5B (copy to Working Parties 5A and 5D for information) WRC-15 Agenda itme 1.15
|
WP 5C
|
|
2012-11-14 |
|
[ 205 ]
|
Liaison statement to Working Parties 1A and 1B (for information to WPs 4A, 4B, 4C, 5A, 5B, 5D, 6A, 6B, 6C, 7B, 7C, 7D on further studies on cognitive radio systems (CRS))
|
WP 5C
|
|
2012-11-14 |
|
[ 204 ]
|
Liaison statement to Working Party 5D - Studies under WRC-15 Agenda items 1.1 and 1.2
|
WP 6A
|
|
2012-11-12 |
|
[ 203 ]
|
Assignment of a document submitted to Study Group 5 - Activities of Correspondence Group 3K3 concerning Recommendation ITU-R P.528-3 and propagation model IF-77
|
Chairman, SG 5
|
|
2012-11-12 |
|
[ 202 ]
(Rev.1) |
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to the relevant Working Parties of Study Groups 1, 3, 4, 5, 6 and 7) - WRC-15 Agenda item 1.1 operating characteristics of AMT systems
|
WP 5B
|
|
2012-11-09 |
|
[ 201 ]
|
Liaison statement to Joint Task Group 4-5-6-7 WRC-15 Agenda item 1.1 (copy to Working parties 1A, 3K, 3M, 4A, 4B, 4C, 5A, 5C, 5D and 7C for infromation)
|
WP 5B
|
|
2012-11-09 |
|
[ 200 ]
|
Liaison statement - Parameters for sharing studies under WRC-15 Agenda item 1.2
|
WP 6A
|
|
2012-11-02 |
|
[ 199 ]
|
Liaison statement to Working Party 5A with copy to Working Parties 5C, 5D and 1B on further studies on cognitive radio systems (CRS)
|
WP 6A
|
|
2012-11-02 |
|
[ 198 ]
|
Liaison statement to Working Party 3K (copy to JTG 4-5-6-7, Working Parties 5A, 5C and 5D for information) on the correlation of short-term interfering signals
|
WP 6A
|
|
2012-11-02 |
|
[ 197 ]
|
Report of the eighth meeting of the Joint IMO/ITU Experts Group on maritime radiocommunication matters
|
International Maritime Organization
|
|
2012-10-18 |
|
[ 196 ]
+Ch.1-7 |
Report on the meeting of Working Party 5D (Woodland Hills, CA, USA, 3-11 October 2012)
|
Chairman, WP 5D
|
|
2012-10-15 |
|
[ 195 ]
(Rev.1) |
Final List of Participants - Working Party 5D (Woodland Hills, CA, USA, 3-11 October 2012)
|
Director, BR
|
|
2012-10-12 |
|
[ 194 ]
|
Liaison statement to Study Group 5 and note to the Director, Radiocommunication Bureau - Proposal for exploring the possibility of additional/supplementary search tool(s) to identify ITU-R Recommendations of the "M"-series by frequency bands and applications
|
SG 4
|
|
2012-10-04 |
|
[ 193 ]
(Rev.1) |
Activities related to IMT in Region 3
|
Region 3 Rapporteur
|
|
2012-10-01 |
|
[ 192 ]
|
Update on standards activities
|
Region 2 Rapporteur
|
|
2012-09-30 |
|
[ 191 ]
|
ITU-D Meeting Report (Meeting 17-21 September 2012)
|
Rapporteur ITU-D SG 2
|
|
2012-09-28 |
|
[ 190 ]
|
Update on recent activities within CEPT
|
ITU Region 1 (CEPT) Rapp.
|
|
2012-09-27 |
Results:1064 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):