Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 1363 ]
|
Proposal on frequency synchronization layer OAM
No file provided
|
China Mobile Communications Corporation
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q14/15, Q13/15
|
2015-06-09 |
|
[ 1362 ]
|
Proposal on Synchronization OAM
|
China Mobile Communications Corporation
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q14/15, Q13/15
|
2015-06-09 |
|
[ 1361 ]
|
Discussion on various scenarios for ODU SMP application
|
China Unicom
|
Q9/15
|
2015-06-09 |
|
[ 1360 ]
|
Considerations re management of SDN control
No file provided
|
Alcatel-Lucent Shanghai Bell
|
Q14/15, Q12/15
|
2015-06-09 |
|
[ 1359 ]
|
Network flattening application scenarios for future ODUSMP deployment
|
China Unicom
|
Q9/15
|
2015-06-09 |
|
[ 1358 ]
|
Consideration on vertical link of interconnected nodes in DNI of MDSP
|
China Unicom
|
Q9/15
|
2015-06-09 |
|
[ 1357 ]
|
Proposal of standardization for cascaded and nested protection of multiple OTN domains
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd.
|
Q9/15, Q11/15
|
2015-06-09 |
|
[ 1356 ]
|
G.dpm: Proposed modifications to working text in sections 7.5 and 7.6 of the G.dpm draft Recommendation
|
Broadcom Corporation
|
Q4/15, Q18/15
|
2015-06-09 |
|
[ 1355 ]
|
ICTP primitives description
|
Alcatel-Lucent International
,
Calix Networks, Inc.
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
,
Orange
,
Verizon Communication Corporation
|
Q2/15
|
2015-06-08 |
|
[ 1354 ]
(Rev.1) |
OTUC4 IrDI Format Decision Criteria
|
Inphi Corporation
|
Q11/15
|
2015-06-08 |
|
[ 1353 ]
|
Adaptation of Flex Ethernet to the OTN Transport Network
|
Inphi Corporation
|
Q11/15
|
2015-06-08 |
|
[ 1352 ]
|
B100G packet client adaptation into ODUflex
|
Inphi Corporation
|
Q11/15
|
2015-06-08 |
|
[ 1351 ]
|
400GE mapping
|
Inphi Corporation
|
Q11/15
|
2015-06-08 |
|
[ 1350 ]
|
G.8273: SyncE Transient Test
|
Calnex Solutions Limited
|
Q13/15
|
2015-06-08 |
|
[ 1349 ]
|
Impact of leaving events on G.993.2 Annex Q vectoring
|
Huawei Technologies Co., Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q4/15
|
2015-06-08 |
|
[ 1348 ]
|
G.fast: MIMO Processing versus FEXT Cancellation
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2015-06-08 |
|
[ 1347 ]
|
Information model for the NE synchronization functions
|
ZTE Corporation
|
Q14/15, Q13/15
|
2015-06-08 |
|
[ 1346 ]
|
G.654 revision proposal incorporating a large Aeff fibre for terrestrial networks
|
Corning Incorporated
|
Q5/15
|
2015-06-08 |
|
[ 1345 ]
|
Comments and revision proposal for link design attenuation
|
Corning Incorporated
|
Q5/15
|
2015-06-08 |
|
[ 1344 ]
|
Methodology for establishing a chromatic dispersion envelope for G.652 fibres
|
Corning Incorporated
|
Q5/15
|
2015-06-08 |
|
[ 1343 ]
|
Comments and revision proposal for G.652
|
Corning Incorporated
,
OFS Fitel, LLC
|
Q5/15
|
2015-06-08 |
|
[ 1342 ]
|
Further progress on G.657 fibre
|
OFS Fitel, LLC
|
Q5/15
|
2015-06-08 |
|
[ 1341 ]
|
Attributes for G.654 Fibre
|
OFS Fitel, LLC
|
Q5/15
|
2015-06-08 |
|
[ 1340 ]
|
G.fast: Additional retransmission parameters exchanged during initialization
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2015-06-08 |
|
[ 1339 ]
|
G.fast: Test Parameter Xlin
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2015-06-08 |
|
[ 1338 ]
|
G.fast: Proposed items for G.9701 corrigendum
|
Futurewei Technologies US R&D Center
,
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2015-06-08 |
|
[ 1337 ]
|
G.fast (Amd 1): Proposed Active Line Noise (ALN) Definition
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4/15
|
2015-06-08 |
|
[ 1336 ]
(Rev.1-3) |
G.fast (Amd 1): Proposed Quiet Line Noise (QLN) definition edits
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4/15
|
2015-06-08 |
|
[ 1335 ]
|
G.fast (Amd 1): Proposed Line Attenuation (LATN) informative appendix
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4/15
|
2015-06-08 |
|
[ 1334 ]
|
G.fast (Amd 2): A Comparison of Linear and Non-Linear Precoders
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4/15
|
2015-06-08 |
|
[ 1333 ]
|
Suggestions for TOD interface
|
China Unicom
|
Q13/15
|
2015-06-08 |
|
[ 1332 ]
|
Test plan and test items for PRTC
|
China Unicom
|
Q13/15
|
2015-06-08 |
|
[ 1331 ]
|
Considerations for T-BC in G.8275.1
|
China Unicom
|
Q13/15
|
2015-06-08 |
|
[ 1330 ]
|
Proposals for Revised SyncE Transient Mask for G.8273.2 and for adding SyncE Transient Test Setup Figure to G.8273
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
|
Q13/15
|
2015-06-08 |
|
[ 1329 ]
|
Consideration of network management in SDN
|
China Mobile Communications Corporation
,
FiberHome Technologies Group
|
Q14/15, Q12/15
|
2015-06-08 |
|
[ 1328 ]
|
PRTC+ simulation result
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
|
Q13/15
|
2015-06-08 |
|
[ 1327 ]
|
Rationale and Proposal for New Recommendation G.781.1 on Time Synchronization Layer Functions and Model for Time Synchronization Transport
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
,
Orange
|
Q13/15
|
2015-06-08 |
|
[ 1326 ]
|
Proposed Template for New Recommendation G.781.1 on Time Synchronization Layer Functions and Initial Summary Description of Atomic Functions
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
,
Orange
|
Q13/15
|
2015-06-08 |
|
[ 1325 ]
|
LTE-A wireless synchronization requirements
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
,
Orange
|
Q13/15
|
2015-06-08 |
|
[ 1324 ]
|
Network limit and metrics of APTS and PTS
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
|
Q13/15
|
2015-06-08 |
|
[ 1323 ]
|
Cascaded protection
|
China Unicom
,
Huawei Technologies Co., Ltd.
|
Q9/15, Q11/15
|
2015-06-08 |
|
[ 1322 ]
|
Proposed revision on G.697
|
Huawei Technologies Co., Ltd.
,
China Mobile Communications Corporation
|
Q6/15
|
2015-06-08 |
|
[ 1321 ]
|
Generation method for pilot tones for G.metro
|
ADVA Optical Networking
,
China Unicom
,
Deutsche Telekom AG
,
Telefon AB - LM Ericsson
|
Q6/15
|
2015-06-08 |
|
[ 1320 ]
|
Handling unexpected messages in G.metro
|
China Unicom
,
Huawei Technologies Co., Ltd.
|
Q6/15
|
2015-06-08 |
|
[ 1319 ]
|
Proposal on HEE to TEE control channel frame structure in G.metro
|
Huawei Technologies Co., Ltd.
|
Q6/15
|
2015-06-08 |
|
[ 1318 ]
|
EVM measurements and investigations for draft revised G.698.2
|
Huawei Technologies Co., Ltd.
|
Q6/15
|
2015-06-08 |
|
[ 1317 ]
|
Considerations on Centralized Recovery
|
Huawei Technologies Co., Ltd.
|
Q9/15, Q14/15, Q12/15
|
2015-06-08 |
|
[ 1316 ]
|
ePRTC Performance Specification (G.8272.1)
|
Deutsche Telekom AG
|
Q13/15
|
2015-06-08 |
|
[ 1315 ]
|
Flexible Optical Transceivers design and development in ICT PANTHER project
|
Telecom Italia S.p.A.
|
Q6/15
|
2015-06-08 |
|
[ 1314 ]
|
ODU SMP - Automatic Protection Switching Triggers
|
Huawei Technologies Co., Ltd.
,
Infinera Corporation
|
Q9/15
|
2015-06-08 |
Resultados :2210 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):