Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1338 ]
|
G.fast: Proposed items for G.9701 corrigendum
|
Futurewei Technologies US R&D Center
,
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2015-06-08 |
|
[ 1337 ]
|
G.fast (Amd 1): Proposed Active Line Noise (ALN) Definition
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4/15
|
2015-06-08 |
|
[ 1336 ]
(Rev.1-3) |
G.fast (Amd 1): Proposed Quiet Line Noise (QLN) definition edits
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4/15
|
2015-06-08 |
|
[ 1335 ]
|
G.fast (Amd 1): Proposed Line Attenuation (LATN) informative appendix
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4/15
|
2015-06-08 |
|
[ 1334 ]
|
G.fast (Amd 2): A Comparison of Linear and Non-Linear Precoders
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4/15
|
2015-06-08 |
|
[ 1333 ]
|
Suggestions for TOD interface
|
China Unicom
|
Q13/15
|
2015-06-08 |
|
[ 1332 ]
|
Test plan and test items for PRTC
|
China Unicom
|
Q13/15
|
2015-06-08 |
|
[ 1331 ]
|
Considerations for T-BC in G.8275.1
|
China Unicom
|
Q13/15
|
2015-06-08 |
|
[ 1330 ]
|
Proposals for Revised SyncE Transient Mask for G.8273.2 and for adding SyncE Transient Test Setup Figure to G.8273
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
|
Q13/15
|
2015-06-08 |
|
[ 1329 ]
|
Consideration of network management in SDN
|
China Mobile Communications Corporation
,
FiberHome Technologies Group
|
Q14/15, Q12/15
|
2015-06-08 |
|
[ 1328 ]
|
PRTC+ simulation result
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
|
Q13/15
|
2015-06-08 |
|
[ 1327 ]
|
Rationale and Proposal for New Recommendation G.781.1 on Time Synchronization Layer Functions and Model for Time Synchronization Transport
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
,
Orange
|
Q13/15
|
2015-06-08 |
|
[ 1326 ]
|
Proposed Template for New Recommendation G.781.1 on Time Synchronization Layer Functions and Initial Summary Description of Atomic Functions
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
,
Orange
|
Q13/15
|
2015-06-08 |
|
[ 1325 ]
|
LTE-A wireless synchronization requirements
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
,
Orange
|
Q13/15
|
2015-06-08 |
|
[ 1324 ]
|
Network limit and metrics of APTS and PTS
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
|
Q13/15
|
2015-06-08 |
|
[ 1323 ]
|
Cascaded protection
|
China Unicom
,
Huawei Technologies Co., Ltd.
|
Q9/15, Q11/15
|
2015-06-08 |
|
[ 1322 ]
|
Proposed revision on G.697
|
Huawei Technologies Co., Ltd.
,
China Mobile Communications Corporation
|
Q6/15
|
2015-06-08 |
|
[ 1321 ]
|
Generation method for pilot tones for G.metro
|
ADVA Optical Networking
,
China Unicom
,
Deutsche Telekom AG
,
Telefon AB - LM Ericsson
|
Q6/15
|
2015-06-08 |
|
[ 1320 ]
|
Handling unexpected messages in G.metro
|
China Unicom
,
Huawei Technologies Co., Ltd.
|
Q6/15
|
2015-06-08 |
|
[ 1319 ]
|
Proposal on HEE to TEE control channel frame structure in G.metro
|
Huawei Technologies Co., Ltd.
|
Q6/15
|
2015-06-08 |
|
[ 1318 ]
|
EVM measurements and investigations for draft revised G.698.2
|
Huawei Technologies Co., Ltd.
|
Q6/15
|
2015-06-08 |
|
[ 1317 ]
|
Considerations on Centralized Recovery
|
Huawei Technologies Co., Ltd.
|
Q9/15, Q14/15, Q12/15
|
2015-06-08 |
|
[ 1316 ]
|
ePRTC Performance Specification (G.8272.1)
|
Deutsche Telekom AG
|
Q13/15
|
2015-06-08 |
|
[ 1315 ]
|
Flexible Optical Transceivers design and development in ICT PANTHER project
|
Telecom Italia S.p.A.
|
Q6/15
|
2015-06-08 |
|
[ 1314 ]
|
ODU SMP - Automatic Protection Switching Triggers
|
Huawei Technologies Co., Ltd.
,
Infinera Corporation
|
Q9/15
|
2015-06-08 |
|
[ 1313 ]
|
Proposed Text for G.odusmp on Protection Characteristics and Architectures
|
Huawei Technologies Co., Ltd.
,
Infinera Corporation
|
Q9/15
|
2015-06-08 |
|
[ 1312 ]
|
G.8275.1: Clarifications over clockClass
|
Calnex Solutions Limited
|
Q13/15
|
2015-06-08 |
|
[ 1311 ]
|
Proposed Text for G.odusmp on APS Channel and Messages
|
Huawei Technologies Co., Ltd.
,
Infinera Corporation
|
Q9/15
|
2015-06-08 |
|
[ 1310 ]
|
Proposed Text for Node Configuration G.odusmp
|
Huawei Technologies Co., Ltd.
|
Q9/15
|
2015-06-08 |
|
[ 1309 ]
|
Proposed Text for Node Behavior in G.odusmp
|
Huawei Technologies Co., Ltd.
|
Q9/15
|
2015-06-08 |
|
[ 1308 ]
|
Test plan and actual measurement data for PRTC time error tests
|
Calnex Solutions Limited
,
China Unicom
|
Q13/15
|
2015-06-08 |
|
[ 1307 ]
|
G.hn: updated text for DLL multicast stream path establishment procedure
|
Huawei Technologies Co., Ltd.
|
Q18/15
|
2015-06-08 |
|
[ 1306 ]
|
G.8272: Testing of PRTCs using a GNSS Simulator
|
Calnex Solutions Limited
|
Q13/15
|
2015-06-08 |
|
[ 1305 ]
|
G.hn: Including nodes to an secure domain through MAC authorization
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
|
Q18/15
|
2015-06-08 |
|
[ 1304 ]
|
G.hn: Creating a new secure domain through MAC authorization
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
|
Q18/15
|
2015-06-08 |
|
[ 1303 ]
|
G.hn: Proposal of updated text for the use cases of MAC authorization-based secure admission.
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
|
Q18/15
|
2015-06-08 |
|
[ 1302 ]
|
G.vdsl,G.bond: KPN requirements on profile 35b/Annex Q
|
The Netherlands Organisation for Applied Scientific Research (TN
|
Q4/15
|
2015-06-08 |
|
[ 1301 ]
|
SDN Approach for Optical Networks
|
Xtera Communications, Inc.
|
Q14/15, Q12/15
|
2015-06-08 |
|
[ 1300 ]
|
Proposals to architecture components classification and clarification of G.800
|
FiberHome Technologies Group
|
Q12/15
|
2015-06-08 |
|
[ 1299 ]
|
CHROMATIC DISPERSION COEFFICIENT SPECIFICATION FOR G.652 & G.657.A FIBRES
|
Prysmian SpA
|
Q6/15, Q5/15
|
2015-06-08 |
|
[ 1298 ]
|
Consideration of Sync Pacs in G.gim
|
China Mobile Communications Corporation
,
FiberHome Technologies Group
|
Q14/15
|
2015-06-08 |
|
[ 1297 ]
|
Prysmian Group view on revision of ITU-T Recs. G.652 and G.657
|
Prysmian SpA
|
Q6/15, Q5/15
|
2015-06-08 |
|
[ 1296 ]
|
Functional requirements for SDN CPI and M-CPI in G.asdtn
|
FiberHome Technologies Group
|
Q14/15, Q12/15
|
2015-06-08 |
|
[ 1295 ]
|
Consideration for single-end/Dual-end performance measurement in G.8052 and G.8152
|
FiberHome Technologies Group
|
Q14/15
|
2015-06-08 |
|
[ 1294 ]
|
Proposal for deletion of Recommendation ITU-T G.651.1
|
Prysmian SpA
|
Q6/15, Q5/15
|
2015-06-08 |
|
[ 1293 ]
|
Proposals for Enhanced EEC performance parameters
|
Rakon Limited
|
Q13/15
|
2015-06-08 |
|
[ 1292 ]
|
Concerns on proposals for fixed wavelength symmetrical 10Gbit/s line rates in the G.987 defined wavelength windows and recommendation on Path Forward.
|
Verizon Communication Corporation
|
Q2/15
|
2015-06-08 |
|
[ 1291 ]
|
Considerations on Section 7.10 "Synchronization module" of ITU-T G.gim
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
|
Q14/15, Q13/15
|
2015-06-08 |
|
[ 1290 ]
|
Proposals for section 10 in Rec. L.pneid
|
Huawei Technologies Co., Ltd.
|
Q16/15
|
2015-06-08 |
|
[ 1289 ]
|
PLOAM message for power saving with channel selection
|
Huawei Technologies Co., Ltd.
|
Q2/15
|
2015-06-08 |
Results:2210 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):