International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : NGN GSI : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T NGN GSI  C 

ITU-T NGN GSI

NGN Global Standards Initiative

Study Period 2005

Results:1303 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 403 ]  
 
Text for Y.IDMsec, Sec. 7.5 (Authentication and Trust)     VeriSign, Inc.   Q15/13   2007-01-03
[ 402 ]  
 
Text for Rec. Y.IDMsec, Sec. 7.4 (Derivative Identity Management)     Verisign, Inc.   Q15/13   2007-01-03
[ 401 ]  
 
Text for Rec. Y.IDMsec, Sec. 7.3 (Attributes and Bindings Management)     VeriSign, Inc.   Q15/13   2007-01-03
[ 400 ]  
 
Text for Rec. Y.IDMsec, Sec. 7.2 (Entity identifier management)     VeriSign, Inc.   Q15/13   2007-01-03
[ 399 ]  
 
Text for Rec. Y.IDMsec, Sec. 7.1 (NGN Entity Management)     VeriSign, Inc.   Q15/13   2007-01-03
[ 398 ]  
 
Text for Rec. Y.IDMsec, Sec. 6 (NGN Identity Management Framework)     VeriSign, Inc.   Q15/13   2007-01-03
[ 397 ]  
 
The updated texts of section 5 and 6 on Y.ngn-openenv     Editor   Q2/13   2007-01-03
[ 396 ]  
 
RACF and CPE/CPN     France Telecom   Q4/13   2007-01-03
[ 395 ]  
 
Drafting status and plan for S-TC1 Signaling Protocol for NACF     ETRI   Q7/11   2007-01-03
[ 394 ]  
 
Q.rsf scope     Reliance Communications, India   Q5/11   2007-01-03
[ 393 ]  
 
Proposals for Q.rsf - Signalling Flows for RACF     Reliance Communications, India   Q5/11   2007-01-03
[ 392 ]  
 
Alternate Approach for diameter t Rw interface     Reliance Communications, India   Q5/11   2007-01-03
[ 391 ]  
 
Q.rcp3.2 - H.248 Command API Subtract     Reliance Communications, India   Q5/11   2007-01-03
[ 390 ]  
 
Q.rcp3.1 - Client Handle in COPS Configuration Model     Reliance Communications, India   Q5/11   2007-01-03
[ 389 ]  
 
Additional text for service scenarios in Y.cwbs     ETRI   Q8/13   2007-01-03
[ 388 ]  
 
Proposed material on NGN Identifiers for inclusion into Y.ngn-IdMsec     Siemens-Networks GMBH & CO KG (Germany) , BT Group (UK)   Q15/13   2007-01-03
[ 387 ]  
 
Initial draft on Resource Control in MPLS based Core network     ETRI   Q4/13   2007-01-03
[ 386 ]  
 
Utilizing end node information for Active Flow Identification     ETRI   Q4/13   2007-01-03
[ 385 ]  
 
A clarification for Priorities defined in Y.flowreq     ETRI   Q4/13   2007-01-03
[ 384 ]  
 
Aggregated signalling for flow aggregates in Y.flowreq     ETRI   Q4/13   2007-01-03
[ 383 ]  
 
Survey on Signaling Mechanism for TC-TC1 Interface     ETRI   Q7/11   2007-01-03
[ 382 ]  
 
Proposed signalling requirements and protocols for TC-TC1 Interface     ETRI   Q7/11   2007-01-03
[ 381 ]  
 
Proposed baseline text for new draft Recommendation on Communication Diversion PSTN/ISDN Simulation Service; Protocol Aspects     Nortel Networks (Europe)   Q3/11   2007-01-03
[ 380 ]  
 
Proposal for a draft new Recommendation "Multimedia Telephony with PSTN/ISDN Simulation Services: Communication Diversion; Protocol Aspects"     Nortel Networks (Europe)   Q3/11   2007-01-03
[ 379 ]  
 
Proposed baseline text for a new draft Recommendation on TIP / TIR PSTN/ISDN Simulation Service     Nortel Networks (Europe)   Q3/11   2007-01-03
[ 378 ]  
 
Proposal for a draft new Recommendation "Multimedia Telephony with PSTN/ISDN Simulation Services: Terminating Identification Presentation (TIP) and Terminating Identification Restriction (TIR)"     Nortel Networks (Europe)   Q3/11   2007-01-03
[ 377 ]  
 
Proposed baseline text for new draft Recommendation on OIP / OIR PSTN/ISDN Simulation Service     Nortel Networks (Europe)   Q3/11   2007-01-03
[ 376 ]  
 
Proposal for a draft new Recommendation "Multimedia Telephony with PSTN/ISDN Simulation Services:Originating Identification Presentation (OIP) and Originating Identification Restriction (OIR)"     Nortel Networks (Europe)   Q3/11   2007-01-03
[ 375 ]  
 
Proposals for Clause 9 and 9.1 of Y.rtconv     BT Group plc   Q2/13   2007-01-03
[ 374 ]  
 
Revised draft of Y.ipv6multi "Framework of IPv6 Multi-homing for NGN!     ETRI   Q9/13   2007-01-03
[ 373 ]  
 
Authentication and Authorization of User for Network Access to draft ITU-T Recommendation Y.NGN Authentication     France Telecom   Q15/13   2007-01-03
[ 372 ]  
 
Proposal for new subsection of Web Services Gateway in section 6 of Y.wsconv     ETRI   Q8/13   2007-01-03
[ 371 ]  
 
Proposal for restructuring of section 7 for effective scenario development in Y.wsconv     ETRI   Q8/13   2007-01-03
[ 370 ]  
 
Comments on the need of guideline for media coder for NGN Telephony     Korea (Republic of)   Q2/13   2007-01-03
[ 369 ]  
 
Proposed texts on media coding requirements of NGN R2     Korea (Republic of)   Q2/13   2007-01-03
[ 368 ]  
 
Customizable IP Networks (CIP): A framework for Requirements and Capabilities for the Customization of IP Service Networks by Customers     Korea (Republic of)   Q3/13   2007-01-03
[ 367 ]  
 
Revised version of Y.enet (Ethernet QoS Control for Next Generation Networks)     Korea (Republic of)   Q4/13   2007-01-03
[ 366 ]  
 
Modification of Network Architecture on Y.mpls-mob     Korea (Republic of)   Q2/13   2007-01-03
[ 365 ]  
 
Proposed text for exchanging performance information in Y.mpm     Korea (Republic of)   Q4/13   2007-01-03
[ 364 ]  
 
Adding supplemental descriptions & modification of section 7 in Y.ctmp     Korea (Republic of)   Q8/13   2007-01-03
[ 363 ]  
 
Architecture for Home Networking for Release 2     Korea (Republic of)   Q3/13, Q2/13   2007-01-03
[ 362 ]  
 
Use of DSL Forum solutions in IGN     Korea (Republic of)   Q3/13   2007-01-03
[ 361 ]  
 
Proposed text for Personal Auto-Diary Service in section 8 of Y.ctmp     Korea (Republic of)   Q8/13   2007-01-03
[ 360 ]  
 
Revised draft of Y.ipv6sig "Signaling Requirements for QoS Support at the NGN using IPv6"     Korea (Republic of)   Q9/13   2007-01-03
[ 359 ]  
 
Proposed text for AAA for session establishment in section 7.12 of Y.ctmp     Korea (Republic of)   Q8/13   2007-01-03
[ 358 ]  
 
Proposed Input Text for draft Y.NGN AAA Version III     Korea (Republic of)   Q15/13   2007-01-03
[ 357 ]  
 
The updated texts of Y.nacf (Functional Architecture and Requirements for NACF in Next Generation Network)     Korea (Republic of)   Q3/13   2007-01-03
[ 356 ]  
 
Proposal for NGN R2 scope     Korea (Republic of)   Q1/13   2007-01-03
[ 355 ]  
 
Proposed text for Event Manager Service in section 8 of Y.ctmp     Korea (Republic of)   Q8/13   2007-01-03
[ 354 ]  
 
The updated texts in subsection 9.2 of Y.ngn-mcast to enhance MPLS-based protocol procedures     Korea (Republic of)   Q2/13   2007-01-03
Results:1303 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2008-08-28