Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 1313 ]
|
Proposed Text for G.odusmp on Protection Characteristics and Architectures
|
Huawei Technologies Co., Ltd.
,
Infinera Corporation
|
Q9/15
|
2015-06-08 |
|
[ 1312 ]
|
G.8275.1: Clarifications over clockClass
|
Calnex Solutions Limited
|
Q13/15
|
2015-06-08 |
|
[ 1311 ]
|
Proposed Text for G.odusmp on APS Channel and Messages
|
Huawei Technologies Co., Ltd.
,
Infinera Corporation
|
Q9/15
|
2015-06-08 |
|
[ 1310 ]
|
Proposed Text for Node Configuration G.odusmp
|
Huawei Technologies Co., Ltd.
|
Q9/15
|
2015-06-08 |
|
[ 1309 ]
|
Proposed Text for Node Behavior in G.odusmp
|
Huawei Technologies Co., Ltd.
|
Q9/15
|
2015-06-08 |
|
[ 1308 ]
|
Test plan and actual measurement data for PRTC time error tests
|
Calnex Solutions Limited
,
China Unicom
|
Q13/15
|
2015-06-08 |
|
[ 1307 ]
|
G.hn: updated text for DLL multicast stream path establishment procedure
|
Huawei Technologies Co., Ltd.
|
Q18/15
|
2015-06-08 |
|
[ 1306 ]
|
G.8272: Testing of PRTCs using a GNSS Simulator
|
Calnex Solutions Limited
|
Q13/15
|
2015-06-08 |
|
[ 1305 ]
|
G.hn: Including nodes to an secure domain through MAC authorization
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
|
Q18/15
|
2015-06-08 |
|
[ 1304 ]
|
G.hn: Creating a new secure domain through MAC authorization
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
|
Q18/15
|
2015-06-08 |
|
[ 1303 ]
|
G.hn: Proposal of updated text for the use cases of MAC authorization-based secure admission.
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
|
Q18/15
|
2015-06-08 |
|
[ 1302 ]
|
G.vdsl,G.bond: KPN requirements on profile 35b/Annex Q
|
The Netherlands Organisation for Applied Scientific Research (TN
|
Q4/15
|
2015-06-08 |
|
[ 1301 ]
|
SDN Approach for Optical Networks
|
Xtera Communications, Inc.
|
Q14/15, Q12/15
|
2015-06-08 |
|
[ 1300 ]
|
Proposals to architecture components classification and clarification of G.800
|
FiberHome Technologies Group
|
Q12/15
|
2015-06-08 |
|
[ 1299 ]
|
CHROMATIC DISPERSION COEFFICIENT SPECIFICATION FOR G.652 & G.657.A FIBRES
|
Prysmian SpA
|
Q6/15, Q5/15
|
2015-06-08 |
|
[ 1298 ]
|
Consideration of Sync Pacs in G.gim
|
China Mobile Communications Corporation
,
FiberHome Technologies Group
|
Q14/15
|
2015-06-08 |
|
[ 1297 ]
|
Prysmian Group view on revision of ITU-T Recs. G.652 and G.657
|
Prysmian SpA
|
Q6/15, Q5/15
|
2015-06-08 |
|
[ 1296 ]
|
Functional requirements for SDN CPI and M-CPI in G.asdtn
|
FiberHome Technologies Group
|
Q14/15, Q12/15
|
2015-06-08 |
|
[ 1295 ]
|
Consideration for single-end/Dual-end performance measurement in G.8052 and G.8152
|
FiberHome Technologies Group
|
Q14/15
|
2015-06-08 |
|
[ 1294 ]
|
Proposal for deletion of Recommendation ITU-T G.651.1
|
Prysmian SpA
|
Q6/15, Q5/15
|
2015-06-08 |
|
[ 1293 ]
|
Proposals for Enhanced EEC performance parameters
|
Rakon Limited
|
Q13/15
|
2015-06-08 |
|
[ 1292 ]
|
Concerns on proposals for fixed wavelength symmetrical 10Gbit/s line rates in the G.987 defined wavelength windows and recommendation on Path Forward.
|
Verizon Communication Corporation
|
Q2/15
|
2015-06-08 |
|
[ 1291 ]
|
Considerations on Section 7.10 "Synchronization module" of ITU-T G.gim
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
|
Q14/15, Q13/15
|
2015-06-08 |
|
[ 1290 ]
|
Proposals for section 10 in Rec. L.pneid
|
Huawei Technologies Co., Ltd.
|
Q16/15
|
2015-06-08 |
|
[ 1289 ]
|
PLOAM message for power saving with channel selection
|
Huawei Technologies Co., Ltd.
|
Q2/15
|
2015-06-08 |
|
[ 1288 ]
|
App VII extension : Multi-Channel EqD coordination in TWDM-PON
|
Huawei Technologies Co., Ltd.
|
Q2/15
|
2015-06-08 |
|
[ 1287 ]
|
Measurement data of TIA for APD based receiver and the simulation results of receiver sensitivity in G.959.1
|
Fujitsu Limited
|
Q6/15
|
2015-06-08 |
|
[ 1286 ]
|
G.989.1 - Support of the services in excess of 10G in NG-PON2
|
Verizon Communication Corporation
|
Q2/15
|
2015-06-08 |
|
[ 1285 ]
|
Proposal of parameters for G.654.E fibre category
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q6/15, Q5/15
|
2015-06-08 |
|
[ 1284 ]
|
SyncE interface of ePRTC(G.8272.1) for high accuracy
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q13/15
|
2015-06-08 |
|
[ 1283 ]
|
BMCA and T-BC function block for monitoring the quality of synchronization
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q13/15
|
2015-06-08 |
|
[ 1282 ]
|
Adding G.9701 Low Power Mode managed objects to G.997.2
|
Alcatel-Lucent International
|
Q4/15
|
2015-06-08 |
|
[ 1281 ]
|
Comments on G.8121
|
Korea (Rep. of)
|
Q10/15
|
2015-06-08 |
|
[ 1280 ]
|
Proposal to finalize and agree on the technical paper "Operation of G.hn technology over access and in-premises phone line medium"
|
Korea (Rep. of)
|
Q18/15
|
2015-06-08 |
|
[ 1279 ]
|
Making G.9701 Appendix IV normative for specification of the DRRus
|
ADTRAN
,
Alcatel-Lucent International
|
Q4/15
|
2015-06-08 |
|
[ 1278 ]
|
Chinese Experience on Hybrid Cable for Mobile Communication in Access Network
|
Ministry of Industry and Information Technology (MIIT)
|
Q16/15
|
2015-06-08 |
|
[ 1277 ]
|
Addressing mixed Full timing support and Partial timing support scenarios
|
Telefon AB - LM Ericsson
|
Q13/15
|
2015-06-08 |
|
[ 1276 ]
|
Extending QL values in G.8264
|
Telefon AB - LM Ericsson
|
Q13/15
|
2015-06-08 |
|
[ 1275 ]
|
Effects of Freezing Condition on Microduct Air-blown Cables
|
Ministry of Industry and Information Technology (MIIT)
|
Q16/15
|
2015-06-08 |
|
[ 1274 ]
|
Clarification in G.8275.1 Amd1
|
Telefon AB - LM Ericsson
|
Q13/15
|
2015-06-08 |
|
[ 1273 ]
|
Proposal on revision of Rec. G.652 & G.657
|
Ministry of Industry and Information Technology (MIIT)
|
Q5/15
|
2015-06-08 |
|
[ 1272 ]
|
Resubmission of "20150512_D14_Answer to the Tours CFC on interest for a fixed wavelength 10G symmetrical solution"
|
Orange
|
Q2/15
|
2015-06-08 |
|
[ 1271 ]
|
G.989.3 iLC#3 comments
|
Broadcom Corporation
|
Q2/15
|
2015-06-08 |
|
[ 1270 ]
|
Recommendation for Mapping Upcoming Packet Clients into B100G
|
PMC-Sierra, Inc.
|
Q11/15
|
2015-06-08 |
|
[ 1269 ]
(Rev.1) |
Upcoming Packet Clients for Mapping into B100G
|
PMC-Sierra, Inc.
|
Q11/15
|
2015-06-08 |
|
[ 1268 ]
|
Propose a mechanism to use flexibility of OTN based on logical channel unit model
|
China Telecommunications Corporation
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q11/15
|
2015-06-08 |
|
[ 1267 ]
|
Proposal to define the commission performance of submarine cable system
|
China Mobile Communications Corporation
,
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
|
Q8/15
|
2015-06-08 |
|
[ 1266 ]
|
Proposals about the Super-Nyquist DWDM in G.sup39
|
China Unicom
,
ZTE Corporation
|
Q6/15
|
2015-06-08 |
|
[ 1265 ]
|
To add multi-dimensional modulation format in G.sup.39
|
China Unicom
,
Ministry of Industry and Information Technology (MIIT) (CATR)
,
ZTE Corporation
|
Q6/15
|
2015-06-08 |
|
[ 1264 ]
|
To add a note to OSNR in G.697
|
China Unicom
,
Ministry of Industry and Information Technology (MIIT) (CATR)
,
ZTE Corporation
|
Q6/15
|
2015-06-08 |
Resultados :2210 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):