Contribuciones
Número
Título
Origen
AI/Cuestión
Filtro...
110-3/5
140/6
205-5/5
208-1/1
210-3/1
228/3
238-2/5
242-2/5
256/5
257/5
AI_1.15
AI1.1
AI1.10
AI1.11
AI1.12
AI1.13
AI1.14
AI1.15
AI1.16
AI1.2
AI1.3
AI1.5
AI1.6
AI1.7
AI1.9
AI1.9.1
AI1.9.2
AI1.9.5
AI2.2
AI7
AI9.1
AI9.1.2
AI9.1.3
AI9.1.5
AI9.1.9
Q140/6
Q205
Q205/5
Q205-5/5
Q208/1
Q210/1
Q210-3/1
Q212
Q212-3/5
Q236/1
Q238/5
Q242/5
Q250/5
Q254/5
Q32/6
Q37
Q37/5
Borrar filtro
Fecha
[ 142 ]
Reply liaison statement to Working Party 5A on the study of sharing schemes in the land mobile service on the basis of geographical USE, frequencies, services, new technologies and applications
WP 1B
2016-06-22
[ 141 ]
Liaison statement to Working Parties 5A, 5C and 6A - Revision of Recommendation ITU-R SM.851
WP 1A
2016-06-21
[ 140 ]
Reply liaison statement to Working Party 5A - Study of sharing schemes in the land mobile service on the basis of geographical use, frequencies, services, new technologies and applications
WP 1A
2016-06-16
[ 139 ]
Liaison statement to Working Party 7D (copy to Working Parties 1B, 5A, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam relative to protection of the passive services
WP 1A
210-3/1
2016-06-16
[ 138 ]
Reply liaison statement to Working Party 5B (copied for information to Working Parties 1B, 5A, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam relative to the services under the purview of WP 5B
WP 1A
210-3/1
2016-06-16
[ 137 ]
Reply liaison statement to Working Party 5A (copied for information to Working Parties 1B, 5B, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
WP 1A
210-3/1
2016-06-16
[ 136 ]
Liaison statement to Working Parties 1B, 5A, 5B, 5C, 6A, 7A and 7D - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
WP 1A
210-3/1
2016-06-16
[ 135 ]
Liaison statement to Working Parties 1C & 3L (copy for information to Working Parties 5A, 5B, 5C, 6A, 7A & 7D) - Assessment of the impact of other emissions to Radiocommunication services (Questions ITU-R 221-2/1 & ITU-R 236/1)
WP 1A
2016-06-15
[ 134 ]
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C and 5D - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz
WP 1A
2016-06-13
[ 133 ]
Liaison statement to Working Parties 3J, 3K and 3M (copy to Working Parties 4A, 5A, 5C, 5D, 6A, 7C and 7D) - Propagation characteristics in the range 275-450 GHz in preparation for WRC-19 agenda item 1.15
WP 1A
AI1.15
2016-06-13
[ 132 ]
Liaison statement to ITU-T Study Group 15 (copy to Working Parties 5A, 5B, 5C, 5D, 6A and 6C) - Liaison activities on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) standards overviews and work plans
WP 1A
2016-06-13
[ 131 ]
Liaison statement to Working Parties 7C and 7D (copy to Working Parties 3J, 3K, 3M, 4A, 5A, 5C, 5D and 6A) - Request for characteristics of passive systems operating in the frequency range 275-450 GHz as related to WRC-19 agenda item 1.15
WP 1A
AI1.15
2016-06-13
[ 130 ]
Liaison statement to ITU-T Study Group 5 and ITU-D Study Group 2 (copy for information to ITU-R Working Parties 4A, 5A, 5B, 5C, 5D and 6A) - WHO:fundamental safety principles for protection against non-ionizing radiation
SG 1
2016-06-13
[ 129 ]
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing...
WP 1B
2016-06-13
[ 128 ]
Liaison statement to Working Parties 5A and 5C on infrastructure sharing (copy to Working Parties 4C and 5C) - Innovative regulatory tools to support enhanced shared use of the spectrum
WP 1B
208-1/1
2016-06-13
[ 127 ]
Reply liaison statement to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on the progress of ongoing work on WTDC Resolution 9 (Rev. Dubai, 2014) during the ITU-D study period 2014-2017, with respect to Chapter 1 - New/emerging spectrum management approaches (copied to ITU-R Working Parties 1A, 1C, 5A, 5B, 5C, 5D, and 6A for information)
WP 1B
2016-06-13
[ 126 ]
Liaison statement to ITU-R Working Parties 5A and 5C (copy to ITU-R Working Parties 3J, 3K, 3M, 4A, 5D, 6A, 7C and 7D) - Preparations for WRC-19 agenda item 1.15 - Request for characteristics of land-mobile and fixed service applications in the frequency range 275-450 GHz as related to WRC-19 agenda item 1.15
WP 1A
AI1.15
2016-06-08
[ 125 ]
Liaison statement to Working Party 5D (copied for information to Task Group 5/1) - Propagation advice in support of agenda item 1.13: input requested from Working Party 5D
Chairmen, SG 3, WP 3J, WP 3K and WP 3M
AI1.13
2016-06-01
[ 124 ]
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Preparation for WRC-19 agenda item 1.13
TG 5/1
AI1.13
2016-05-25
[ 123 ]
Liaison statement to Working Parties 5A, 5D and Metro Ethernet Forum (MEF) (copy to ITU-T Study Group 15 and Next Generation Mobile Networks (NGMN) for information) - Preliminary draft new Report ITU-R F.[FS.IMT/BB] - Use of fixed service for transport of traffic, including backhaul, for IMT and other terrestrial mobile broadband systems
WP 5C
2016-05-25
[ 122 ]
Liaison statement to External Organizations (copy for information to Working Parties 1A, 3J, 3K, 3M, 5A and 5D, 7C and 7D) - Technical and operational characteristics of the fixed service applications and their spectrum needs associated with work on WRC-19 agenda item 1.15
WP 5C
AI1.15
2016-05-24
[ 121 ]
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M, 4A, 4B, 4C, 5A, 5B and 6A) - WRC-19 agenda item 1.7
WP 5C
AI1.7
2016-05-24
[ 120 ]
Liaison statement requesting technical characteristics for WRC-19 agenda item 1.9.2 from Working Parties 4C, 5A, 5C, 6A, 7B and 7D (copy to Working Parties 1A and 3M for information)
WP 5B
2016-05-23
[ 119 ]
Liaison statement to Working Parties 3K & 3M (copy for information to Working Parties 5A, 5C, 5D, 4A, 4C, 7B and 7D) - Questions for Working Parties 3K and 3M on ITU-R propagation Recommendations used by Working Party 5B
WP 5B
2016-05-23
[ 118 ]
Liaison statement to Working Party 5D (copy to Working Parties 5A, 5C and 7D for information) - IMT co-existence and adjacent studies in the frequency bands 3 300-3 400 MHz and 4 800-4 990 MHz - Technical and operational characteristics for radiolocation and aeronautical mobile services
WP 5B
2016-05-23
[ 117 ]
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5B and 5D) - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA]
WP 5C
2016-05-20
[ 116 ]
Liaison statement to ITU-R Working Parties 3M, 4A, 4C, 5A, 5D, 7B, 7C and 7D (for information to Task Group 5/1) - WRC-19 agenda item 1.14
WP 5C
AI1.14
2016-05-20
[ 115 ]
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M, 4A, 4B, 4C, 5A, 5C and 6A) - WRC-19 agenda item 1.7
WP 5B
AI1.7
2016-05-20
[ 114 ]
+Ann.1-31
Report on the meeting of Working Party 5A - (Geneva, 10-20 May 2016)
Chairman, WP 5A
2016-05-19
[ 113 ]
Final list of participants - Working Party 5A (Geneva, 10-20 May 2016)
Director, BR
2016-05-19
[ 112 ]
Report on the relevant activities in certain countries in Region 3
Liaison Rapporteur
2016-05-19
[ 111 ]
Liaison statement on information about work that is being carried out within work under study in ITU-T Q7/5
ITU-T SG 5
2016-05-13
[ 110 ]
Report on the recent activities of Wireless World Research Forum (WWRF)
WWRF Liaison Rapporteur
2016-05-13
[ 109 ]
Report on relevant activities in certain countries in Region 1
Liaison Rapporteur
2016-05-13
[ 108 ]
(Rev.1)
List of documents issued (Documents 5A/1 - 5A/108)
BR Study Groups Department
2016-05-09
[ 107 ]
Report on liaison with CENELEC on developments concerning PLT, EMI and WPT - Communication by the Rapporteur on coexistence of wired telecommunication with radiocommunication systems
Chairman, WP 5A
2016-05-09
[ 106 ]
Report on relevant activities in Region 2
Liaison Rapporteur
2016-05-06
[ 105 ]
Report on disaster relief
Disaster Relief Liaison Rapporteur
2016-05-06
[ 104 ]
Liaison statement to Working Party 5A - PPDR terms and definitions
CCV & SCV
2016-05-05
[ 103 ]
Report to Study Group 5A May 2016 meeting on the activities of interest from JC-AHF since the last Study Group 5A meeting
Liaison Rapporteur to JCA-AHF
2016-05-05
[ 102 ]
Update of Recommendation ITU-R M.2015
United Arab Emirates
,
Bahrain (Kingdom of)
,
Kuwait (State of)
,
Palestine (State of )
2016-05-03
[ 101 ]
Elements toward a revision of Recommendation ITU-R M.1732-1 - Characteristics of systems operating in the amateur and amateur-satellite services for use in sharing studies
International Amateur Radio Union
2016-05-03
[ 100 ]
5 GHz RLAN activity and busy hour factor considerations
European Union
2016-05-03
[ 99 ]
Proposal on studies on intelligent transportation systems in accordance with Resolution 237
China (People's Republic of)
2016-05-03
[ 98 ]
System characteristics of incumbent services and proposed structure for sharing and compatibility study Report on agenda item 1.16
China (People's Republic of)
AI1.16
2016-05-03
[ 97 ]
Sharing studies between RLANs and EESS (active) scatterometers in the 5 GHz range under WRC-19 agenda item 1.16
European Organisation for the Exploitation of Meteorological Satellites
AI1.16
2016-05-02
[ 96 ]
Sharing studies between RLANs and EESS (active) altimeters in the 5 GHz range under WRC-19 agenda item 1.16
European Space Agency
AI1.16
2016-05-02
[ 95 ]
Proposed study of sharing schemes in the land mobile service on the basis of geographical use, frequencies, services, new technologies and applications
Canada
238-2/5
2016-05-02
[ 94 ]
Proposed amendments to Report ITU-R M.2377 and development of new Report ITU-R M.[PPDR-CALC] - Public protection and disaster relief communications
Canada
2016-05-02
[ 93 ]
Liaison statement reply on external standard development organizations on standardization status of Intelligent Transport Systems (ITS) radio interface technologies
China (People's Republic of)
2016-04-29
Resultados :1092 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22
- Siguiente
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):