International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : 6-8-9 : Contributions : 66 Recently posted -  Search Meeting Documents
   
[66]  Report of the meeting of Joint Task Group 6-8-9 (Seoul, 25-31 August 2005)

Format

Size

Posted

English

Word  

82944 bytes 2005-09-01 [66] Annex 11 - List of output documents

Word  

86016 bytes 2005-09-01 [66] Annex 10 - Summary of results of sharing studies

Word  

117760 bytes 2005-08-31 [66] Annex 09 - Polarization loss for circularly polarized satellite signals interfering with linearly polarized terrestrial systems

Word  

82944 bytes 2005-08-31 [66] Annex 08 - Review of the number of satellite systems in the methodology to determine the power flux-density levels

Word  

158720 bytes 2005-08-31 [66] Annex 07 - Methodology to determine the power flux-density levels applicable to satellite systems in the band 2 500-2 690 MHz to facilitate sharing with terrestrial systems

Word  

69120 bytes 2005-08-31 [66] Annex 06 - Characteristics of satellite systems for consideration in studies under Agenda item 1.9 of WRC-07

Word  

137728 bytes 2005-08-31 [66] Annex 05 - Cell capacity and coverage reduction of IMT-2000 systems due to external interference

Word  

248320 bytes 2005-08-31 [66] Annex 04 - Comparison of measured antenna patterns with Recommendation ITU-R F.1336-1

Word  

610816 bytes 2005-08-31 [66] Annex 03 - Characteristics of terrestrial systems for consideration in studies under Agenda item 1.9 of WRC-07

Word  

65024 bytes 2005-08-31 [66] Annex 02 - Working document towards possible additional CPM text addressing general principles

Word  

175616 bytes 2005-08-31 [66] Annex 01 - Working document towards draft CPM text - Chapter 3 - Fixed-satellite, mobile satellite and broadcasting-satellite services below 3 GHz - Agenda item 1.9

Word  

88576 bytes 2005-08-31 [66]  - Report of the meeting of Joint Task Group 6-8-9
 

Document :

ITU-R 6-8-9  Contribution  66

Title :

Report of the meeting of Joint Task Group 6-8-9 (Seoul, 25-31 August 2005)

Date :

2005-08-31

Source :

Chairman, JTG 6-8-9

Access :

Restricted to TIES users [ITU-R]

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2005-09-01