International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP4B : Contributions : 112 Recently posted -  Search Meeting Documents
   
[112]  Report on the twenty second meeting of Working Party 4B - (Geneva, 28 - 31 August, 1 September 2006)

Format

Size

Posted

English

Word  

62976 bytes 2006-10-09 [112] Annex 11 - Final list of participants

Word  

75264 bytes 2006-10-06 [112] Annex 10 - Liaison statement to ITU-T Study Group 13 - Outage intensity objectives for satellite digital paths

Word  

164864 bytes 2006-10-06 [112] Annex 09 - Liaison statement to Working Party 3M - Application of Recommendation ITU-R P.1623 to the estimation of outage intensity performance for satellite digital paths

Word  

1370112 bytes 2006-10-09 [112] Annex 08 - Liaison statement to Working Party 4A - On the development of a DNR ITU-R S.[WIDEBAND] "Characteristics of fixed-satellite service systems using Wideband spreading signals"

Word  

65536 bytes 2006-10-06 [112] Annex 07 - Liaison statement to Working Parties 8A and 8F - On the development of a PDNR ITU-R M.[IP CHAR] "Key technical and operational requirements for access technologies to support IP applications over mobile systems"

Word  

9194496 bytes 2006-10-09 [112] Annex 06 - Preliminary draft new Report ITU R S.[TCPSAT] on transmission control protocol (TCP) over satellite networks

Word  

153088 bytes 2006-10-09 [112] Annex 05 - Working document on Cross-Layer protocol model for PDNR ITU-R S.[QoS] - Quality of Service (QoS) architectures, mechanisms and their provisioning in IP based networks in the FSS

Word  

82944 bytes 2006-10-18 [112] Annex 04 - Working document in response to the request from the Study Group 4 Rapporteur on Vocabulary with respect to PDRR ITU-R S.1711 - Performance enhancements of transmission control protocol over satellite networks

Word  

119319552 bytes 2006-10-17 [112] Annex 03 - Proposed preliminary draft revision to Recommendation ITU-R S.1711 - Performance enhancements of transmission control protocol over satellite networks

Word  

69632 bytes 2006-10-09 [112] Annex 02 - Work plan for the twenty second meeting of WP 4B

Word  

104448 bytes 2006-10-09 [112] Annex 01 - List of input documents

Word  

123392 bytes 2006-10-25 [112]  - Report on the twenty second meeting of Working Party 4B - (Geneva, 28 - 31 August, 1 September 2006)
 

Document :

ITU-R WP4B  Contribution  112

Title :

Report on the twenty second meeting of Working Party 4B - (Geneva, 28 - 31 August, 1 September 2006)

Date :

2006-09-04

Source :

Chairman, WP 4B

Access :

Restricted to TIES users [ITU-R]

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2006-11-06