Contributions
[ Source: WP 8A ] ![Documents / Contributions](/res/templates/dms/images/key.gif) |
|
Number
|
Title
|
Source
|
Date
|
|
[ 156 ]
|
Liaison statement to Working Parties 6B and 9D - System characteristics of television outside broadcast (TVOB), electronic news gathering (ENG) and electronic field production (EFP) in the mobile service for use in sharing studies
|
WP 8A
|
2007-08-01 |
|
[ 138 ]
|
Liaison statement to Working Parties 6J and 9D copy to 4B, 6E, 7C, 7D, 8B, 8F, 9B, and ITU-T Study Group 9 - System characteristics of television outside broadcast (TVOB), electronic news gathering (ENG) and electronic field production (EFP) in the mobile service
|
WP 8A
|
2006-11-03 |
|
[ 116 ]
(Rev.1) |
Liaison statement - Result of the study under Recommendation 723 (WRC-03)
|
WP 8A
|
2006-04-21 |
|
[ 88 ]
+Add.1 |
Liaison statement to WP 6E (Copy to WP 7D, WP 9D, WP 8B) - Methods to identify administrations potentially affected by assignments or allotments in the broadcasting service and other primary services in the RRC-06 bands
|
WP 8A
|
2005-10-04 |
|
[ 79 ]
|
Liaison statement to Working Party 1A (Copy to study Group 7) - Bands above 275 GHz
|
WP 8A
|
2005-05-16 |
|
[ 75 ]
|
Liaison statement to WPs 6E, 7D, 8B and 9D on views of WP 8A on the planning assumptions
|
WP 8A
|
2005-04-18 |
|
[ 34 ]
|
Liaison statement to WP 6E (copy to WP 6S, WP 7D and WP 9D) on WRC-07 Agenda item 1.11
|
WP 8A
|
2004-09-17 |
Results:7 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):