|
Format |
Size |
Posted |
|
|
|
English |
Word
|
169472 bytes |
2005-04-04 |
[72] Annex 16
- Working document towards a PDRR ITU-R RA.611 - Protection of the radio astronomy service from spurious emissions |
|
Word
|
842240 bytes |
2005-04-01 |
[72] Annex 15
- A working document towards a PDNR - Mutual planning between the EESS (active) and the RAS in the 94 GHz and 130 GHz bands |
|
Zip (Document)
|
736179 bytes |
2005-04-01 |
[72] Annex 15
- A working document towards a PDNR - Mutual planning between the EESS (active) and the RAS in the 94 GHz and 130 GHz bands |
|
Word
|
440832 bytes |
2005-04-01 |
[72] Annex 14
- Working document towards a Preliminary Draft Revision of Recommendation ITU-R RA.1031 - Protection of the radio astronomy service in frequency bands shared with other services |
|
Word
|
164352 bytes |
2005-04-01 |
[72] Annex 13
- Working document towards a Preliminary Draft Revision of Recommendation ITU-R RA.517-3 - Protection of the radio astronomy services from transmitters operating in adjacent bands |
|
Word
|
184832 bytes |
2005-04-01 |
[72] Annex 12
- Working document toward a PDNR - Time scales based on pulsar timing |
|
Word
|
138240 bytes |
2005-04-04 |
[72] Annex 11
- The use of frequencies in the range 275 - 3 000 GHz by the radio astronomy service |
|
Word
|
733184 bytes |
2005-04-01 |
[72] Annex 10
- Preliminary draft new Recommendation ITU-R M.[MSS-RAS-1.4 GHz] - Protection if the radio astronomy service in the band 1 400-1 427 MHz from unwanted emissions of MSS feeder links that may operate in the bands 1 390-1 392 MHz (Earth-to-space) and 1 430-1 4 |
|
Word
|
88064 bytes |
2005-04-01 |
[72] Annex 9
- Working document leading towards CPM text on Agenda item 1.17 - (Chapter 3 of the CPM Report) |
|
Word
|
69120 bytes |
2005-03-31 |
[72] Annex 8
- Liaison statement to Working Party 8D - protection of the radio astronomy service operating in the band 1 400-1 427 MHz from unwanted emissions of MSS feeder links that may operate in the bands near 1.4 GHz |
|
Word
|
58880 bytes |
2005-03-31 |
[72] Annex 7
- Liaison statement to Working Party 8D - Protection of the space research service (passive) from harmful interference from MSS stations in the band 1 668-1 668.4 MHz |
|
Word
|
57344 bytes |
2005-03-29 |
[72] Annex 6
- Liaison statement to Working Party 9C with copy to Working Parties 3L, 6E, 8A and 8B - Review of allocations to all services in the HF bands between 4 and 10 MHz |
|
Word
|
51200 bytes |
2005-03-29 |
[72] Annex 5
- Liaison statement to Working Parties 6E and 6S - Protection of the RAS in the 608-614 MHz from the BSS operating in the band 620-790 MHz |
|
Word
|
60416 bytes |
2005-04-06 |
[72] Annex 4
- Liaison statement to WP 1B - Comments on PDNR ITU-R SM.[EML] - Index for the evaluation of the effect of interference between radio communication networks operating in a shared frequency band |
|
Word
|
61952 bytes |
2005-03-29 |
[72] Annex 3
- Liaison statement to Working Party 6E and IPG - Protection ratios for radio astronomy service interfered with by DVB-T |
|
Word
|
67072 bytes |
2005-03-29 |
[72] Annex 2
- Liaison statement to Working Parties 1A, 3L and 6E - Impact of cable and power line telecommunications systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz |
|
Word
|
74752 bytes |
2005-04-08 |
[72] Annex 1
- List of output (Temp) documents |
|
Word
|
101376 bytes |
2005-06-16 |
[72]
- Report on the meeting of Working Party 7D, 7-11 March 2005 |
|
|