International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions : 61 Recently posted -  Search Meeting Documents
   
[61]  Report on the meeting of Working Party 4A (Geneva, 30 May - 6 June 2012)

Format

Size

Posted

English

Word  

53465 bytes 2012-07-04 [61] Annex 24 - List of liaison statements to ITU-R Groups

Word  

57141 bytes 2012-06-08 [61] Annex 23 - Working document - Work plan for WRC-15 Agenda item 9.1.2

Word  

57483 bytes 2012-06-08 [61] Annex 22 - Working document - Work plan for WRC-15 Agenda item 1.9.1

Word  

55066 bytes 2012-06-08 [61] Annex 21 - Working document - Work plan for WRC-15 Agenda item 1.8

Word  

46003 bytes 2012-06-08 [61] Annex 20 - Working document - Work plan for WRC-15 Agenda item 1.7

Word  

57631 bytes 2012-06-08 [61] Annex 19 - Working document - Work plan for WRC-15 Agenda item 1.6

Word  

46503 bytes 2012-06-08 [61] Annex 18 - Working document addressing issues which were not addressed in Report ITU-R S.2223 - Earth stations on mobile platforms operating in geostationary fixed-satellite service networks in the 17.3 to 30.0 GHz band

Word  

5471326 bytes 2012-06-08 [61] Annex 17 - Working document - Technical criteria used in application of RR No. 9.41 in respect of coordination under RR No. 9.7

Word  

265598 bytes 2012-06-08 [61] Annex 16 - Working document - Development of EPFD validation software in accordance with Recommendation ITU-R S.1503-1

Word  

339326 bytes 2012-06-08 [61] Annex 15 - Working document - Examination under § 2.2 of Annex 4 of RR Appendix 30B (Grid points at locations with low satellite antenna gain)

Word  

54683 bytes 2012-06-08 [61] Annex 14 - Working document - Application of Article 2A to RR Appendices 30 and 30A

Word  

65853 bytes 2012-06-07 [61] Annex 13 - Working document - Size of the coordination arc for triggering coordination under RR No. 9.7 between geostationary-satellite networks

Word  

503535 bytes 2012-06-07 [61] Annex 12 - Working document towards a preliminary draft new Report ITU-R S.[VSAT] - Use of very small aperture terminals (VSATs) operating in fixed satellite service networks

Word  

255966 bytes 2012-06-07 [61] Annex 11 - Working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the fixed-satellite service in Region 1 (GSO)

Word  

652185 bytes 2012-06-07 [61] Annex 10 - Working document towards a preliminary draft new Report ITU-R S.[ESV] on the interference effect of transmissions from earth stations on board vessels operating in fixed-satellite service networks on fixed service stations

Word  

242867 bytes 2012-06-07 [61] Annex 09 - Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz band for the fixed-satellite service in Regions 2 and 3 (GSO)

Word  

49573 bytes 2012-06-07 [61] Annex 08 - Working document towards a preliminary draft new Report ITU-R S.[NGSO ESOMPS] - Technical and operational requirements for earth stations on mobile platforms operating in non-GSO FSS systems in the frequency bands...

Word  

98874 bytes 2012-06-07 [61] Annex 07 - Working document towards a preliminary draft new Report ITU-R S.[SPECTRUM-ORBIT-RESOURCE] - Assessment of the orbital-radio-frequency spectrum resource used by a GSO satellite communication system

Word  

54691 bytes 2012-06-07 [61] Annex 06 - Working document towards a preliminary draft new Report or Recommendation ITU-R S.[FSS-5GHZ ARNS COMPATIBILITY] - Compatibility between new systems of the aeronautical radionavigation service and the existing fixed-satellite service (FSS)...

Word  

44598 bytes 2012-06-07 [61] Annex 05 - Working document towards a preliminary draft revision of Recommendation ITU-R S.1782 - Possibilities for global broadband Internet access by fixed-satellite service systems

Word  

63741 bytes 2012-06-07 [61] Annex 04 - Working document towards a preliminary draft revision of Recommendation ITU-R BO.1898 - Power flux-density value required for the protection of receiving earth stations in the broadcasting-satellite service in Regions 1 and 3 from emissions...

Word  

3062631 bytes 2012-06-11 [61] Annex 03 - [Working document towards a[ [preliminary] draft new Recommendation ITU-R S.[TIME_VAR_SMALL_E/S] - Statistical methodology to assess time-varying interference produced by a network of small earth stations operating with TDMA schemes...

Word  

57119 bytes 2012-06-07 [61] Annex 02 - Preliminary draft revision of Recommendation ITU-R SF.674-2 - Determination of the impact on the fixed service operating in the 11.7-12.2 GHz band when geostationary fixed-satellite service networks in Region 2...

Word  

116400 bytes 2012-06-07 [61] Annex 01 - Preliminary draft revision of Recommendation ITU-R S.732 - Method for statistical processing of earth-station antenna side-lobe peaks

Word  

133312 bytes 2012-07-04 [61]  - Report on the meeting of Working Party 4A (Geneva, 30 May - 6 June 2012)
 

Document :

ITU-R WP4A  Contribution  61

Title :

Report on the meeting of Working Party 4A (Geneva, 30 May - 6 June 2012)

Date :

2012-06-06

Source :

Chairman, WP 4A

Access :

Restricted to TIES users [ITU-R]

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2012-07-04