|
Format |
Size |
Posted |
|
|
|
English |
Word
|
55409 bytes |
2012-06-04 |
[28] Annex 17
- Final list of participants |
|
Word
|
48599 bytes |
2012-06-04 |
[28] Annex 16
- Database containing points of contact for SNG matters |
|
Word
|
69533 bytes |
2012-06-04 |
[28] Annex 15
- Preliminary draft new Recommendation ITU-R S.[GENACC] - Access procedures for fixed-satellite service occasional use earth station transmissions |
|
Word
|
767576 bytes |
2012-06-04 |
[28] Annex 14
- Preliminary draft revision of Report ITU-R S.2151 - Use and examples of systems in the fixed-satellite service in the event of natural disasters and similar emergencies for warning and relief operations |
|
Word
|
46292 bytes |
2012-06-04 |
[28] Annex 13
- Liaison statement to ITU-D Study Group 2 - ITU Handbook for telecommunications outside plants in areas frequently exposed to natural disasters |
|
Word
|
4979560 bytes |
2012-06-04 |
[28] Annex 12
- Working document towards a preliminary draft new Recommendation ITU-R M.[IMT-ADVANCED-SAT] - Detailed specifications of the radio interfaces for the satellite component of International Telecommunications-Advanced (IMT-Advanced): Satellite radio interface |
|
Word
|
245559 bytes |
2012-06-04 |
[28] Annex 11
- Working document - Self-evaluation of candidate satellite radio transmission technology for IMT-Advanced, "SAT-OFDM" |
|
Word
|
1483204 bytes |
2012-06-04 |
[28] Annex 10
- Submission of LTE-satellite radio interface technology for IMT-Advanced satellite candidate technology |
|
Word
|
67696 bytes |
2012-06-04 |
[28] Annex 09
- Liaison statement to ITU-D Study Group 2 and ITU-R Working Party 5D (copy to ITU-T Study Group 13) - Development of Handbook on "Global Trends in IMT" and Report on "Broadband Access Technology" |
|
Word
|
51546 bytes |
2012-06-04 |
[28] Annex 08
- Liaison statement to Joint Task Group 4-5-6-7 on WRC-15 Agenda item 1.1 |
|
Word
|
510733 bytes |
2012-06-04 |
[28] Annex 07
- Working document towards a preliminary draft new Report ITU-R S.[VSAT] - Technical and operational requirements for very small aperture terminals (VSATs) |
|
Word
|
1277210 bytes |
2012-06-04 |
[28] Annex 06
- Working document towards a preliminary draft new Recommendation ITU-R S.[ACM] - Impact of adaptive coding and modulation on availability objectives |
|
Word
|
50557 bytes |
2012-06-04 |
[28] Annex 05
- Liaison statement to ITU-R Working Party 3M - Data and statistics on propagation of Earth-to-space signals at frequencies greater than 10 GHz |
|
Word
|
51486 bytes |
2012-06-04 |
[28] Annex 04
- Liaison statement to ITU-T Study Group 15 - Access network transport standardization and work plans |
|
Word
|
49981 bytes |
2012-06-04 |
[28] Annex 03
- Liaison statement ot ITU-D Study Group 2 - Migration from existing networks to next-generation networks for developing countries: technical, regulatory and policy aspects |
|
Word
|
63583 bytes |
2012-06-04 |
[28] Annex 02
- Workplan for the thirty-second meeting of Working Party 4B (Geneva, 28 May - 1 June 2012) |
|
Word
|
68213 bytes |
2012-06-04 |
[28] Annex 01
- List of documents issued - Documents 4B/200 - 4B/205 (carried forward from the 2007-2012 study period) Documents 4B/1 - 4B/23 (from the current 2012-2015 study period) |
|
Word
|
92695 bytes |
2012-07-16 |
[28]
- Report on the thirty-second meeting of Working Party 4B (Geneva, 28 May - 1 June 2012) |
|
|