International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5A  C 

ITU-R WP5A

Land mobile service above 30 MHz*(excluding IMT); wireless access in the fixed service; amateur and amateur-satellite services

Results:37 total items.
Contributions  [ Source: WP 5C ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1066 ]  
 
Liaison statement to External Organisations (copy for information to Working Parties 5A and 7B) - Fixed wireless system antenna paterns above 86 GHz     WP 5C     2019-05-13
[ 1060 ]  
 
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4A, 4C, 5A, 5B, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations     WP 5C     2019-05-06
[ 971 ]  
 
Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5D, 7B and 7C (copy for information to Working Party 1A) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations     WP 5C     2018-11-09
[ 851 ]  
 
Reply liaison statement to Working Party 4A (copy for information to Working Parties 3M, 4C, 5A, 5D, 7B, 7C and 7D) - Clarification of HAPS characteristics and studies     WP 5C   AI1.14   2018-06-05
[ 850 ]  
 
Reply liaison statement to Working Party 5D (copy for information to Working Parties 3M, 4A, 4C, 5A, 7B, 7C and 7D) - Information on Adaptive Transmit Power Control (ATPC)     WP 5C   AI1.14   2018-06-05
[ 849 ]  
 
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and Task Group 5/1 (copy for information to Working Parties 3M and 5B) - Progress on WRC-19 agenda item 1.14     WP 5C   AI1.14   2018-06-05
[ 846 ]  
 
Liaison statement to Working Party 5A - Revision of Recommendation ITU-R F.1105-3 - Fixed wireless systems for disaster mitigation and relief operations     WP 5C     2018-05-31
[ 845 ]  
 
Reply liaison statement to ITU-R Working Party 1A on preparations for WRC-19 agenda item 1.15 and the working document towards a preliminary draft new Report ITU-R SM.[275-450GHz_SHARING] (copy to Working Party 5A for information) - Input as related to WRC-19 agenda item 1.15 - Sharing and compatibility studies between land-mobile, fixed and passive services in the frequency ...     WP 5C   AI1.15   2018-05-31
[ 661 ]  
 
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and Task Group 5/1 (and copy to Working Parties 3M and 5B for information) - WRC-19 agenda item 1.14     WP 5C   AI1.14   2017-11-22
[ 660 ]  
 
Liaison statement to Working Parties 5A, 5D and 6A - Draft revision of Report ITU-R F.2323-0     WP 5C     2017-11-22
[ 659 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5D, Task Group 5/1, 6A, 7B, 7C and 7D - Revision of Recommendation ITU-R F.699-7 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70 GHz     WP 5C     2017-11-22
[ 658 ]  
 
Liaison statement to Working Party 5A - Revision of Recommendation ITU-R F.1105-3 - Fixed wireless systems for disaster mitigation and relief operations     WP 5C     2017-11-21
[ 657 ]  
 
Reply liaison statement to Working Party 7C (copies to Working Parties 5A and 5B for information) - Technical and operational characteristics for fixed wireless systems operating within the 40-50 MHz frequency range (WRC-23 preliminary agenda item 2.2)     WP 5C   AI2.2   2017-11-21
[ 652 ]  
 
Liaison statement to ITU-R Working Party 1A (copy to Working Parties 5A, 7C and 7D) - Input as related to WRC-19 agenda item 1.15     WP 5C   AI1.15   2017-11-17
[ 477 ]  
 
Liaison statement to Working Parties 1A and 7C (copy to Working Parties 3K, 5A and 7D for information) - WRC-19 agenda item 1.15     WP 5C   AI1.15   2017-06-01
[ 476 ]  
 
Reply liaison statement to Working Party 7C (copied to Working Parties 5A and 5B for information) - Technical and operational characteristics for fixed wireless systems operating within the 40-50 MHz frequency range     WP 5C     2017-06-05
[ 475 ]  
 
Liaison statement to ITU-R Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5D, 7B,7C, 7D and Task Group 5/1 - WRC-19 agenda item 1.14     WP 5C   AI1.14   2017-06-05
[ 471 ]  
 
Liaison statement to Working Party 5A (copy Task Group 5/1 for information) - Revision of Recommendation ITU-R F.1336-4 - Reference radiation patterns of omnidirectional, sectoral and low gain other directional antennas for the fixed and mobile services for use in sharing studies in the frequency range from 400 MHz to about 70 GHz     WP 5C     2017-06-02
[ 470 ]  
 
Liaison statement to Working Party 4A (copy for information to Working Party 5A) - Fixed service technical and operational characteristics and protection criteria for use in sharing studies under WRC-19 agenda item 1.5     WP 5C   AI1.5   2017-06-02
[ 308 ]  
 
Liaison statement to external organisations (copy to Working Parties 5A and 5D for information) - Revision of Recommendation ITU-R F.1336-4 - Reference radiation patterns of omnidirectional, sectoral and low gain other directional antennas for the fixed and mobile services for use in sharing studies in the frequency range from 400 MHz to about 70 GHz     WP 5C     2016-11-24
[ 306 ]  
 
Liaison statement to Working Parties 5A and 5D, ITU-T Study Groups 13 and 15, Metro Ethernet Forum (MEF) and Next Generation Mobile Networks (NGMN)     WP 5C     2016-11-24
[ 296 ]  
 
Reply liaison statement to Working Party 1A (copy to Working Parties 1B, 5A, 5B, 6A, 7A and 7D for information) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 5C     2016-11-17
[ 294 ]  
 
Liaison statement to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D (copy to Task Group 5/1 for information) - Revision of Recommendation ITU-R F.699-7 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70 GHz     WP 5C     2016-11-16
[ 293 ]  
 
Reply liaison statement to Working Party 5B on technical characteristics for the fixed service for studies under WRC-19 agenda item 1.9.2 (copy to Working Parties 1A, 3M, 4C, 5A, 6A, 7B and 7D for information)     WP 5C   AI1.9.2   2016-11-16
[ 292 ]  
 
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5D, 7B, 7C and 7D (copy for information to Working Parties 3K and 3M) - WRC-19 agenda item 1.14     WP 5C   AI1.14   2016-11-16
[ 291 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5D, 7D and 3M for information) - WRC-19 agenda item 9.1, issue 9.1.9     WP 5C   AI9.1   2016-11-16
[ 290 ]  
 
Reply liaison statement to Working Party 5A (copied for information to Working Parties 1B, 3J, 3K, 3M, 4A, 4C, 5B and 5D) - Request for technical characteristics relevant to the work under WRC-19 agenda item 1.16     WP 5C   AI1.16   2016-11-16
[ 289 ]  
 
Reply liaison statement to ITU-R Working Parties 1A and 5A (copy to Working Party 6A for information) - Revision of Recommendation ITU-R SM.851 and WRC-19 agenda item 1.1     WP 5C     2016-11-16
[ 288 ]  
 
Reply liaison statement to ITU-R Working Party 4A (copy for information to Working Parties 3M and 5A) - Providing fixed service information for studies under WRC-19 agenda item 1.5 and identifying issues to consider when modelling interference into the fixed service from earth stations in motion (ESIMs)     WP 5C     2016-11-16
[ 287 ]  
 
Reply liaison statement to ITU-D Study Group 2, Working Party 1C (copy to Working Parties 1B, 3L, 4A, 5A, 5B, 6A for information) - ITU-D Question 7/2: strategies and policies concerning human exposure to electromagnetic fields     WP 5C     2016-11-16
[ 286 ]  
 
Liaison statement to Working Party 5A (copy to Working Parties 1A, 1B, 4A, 5B and 5D for information) - Study of sharing schemes in the land mobile service on the basis of geographical use     WP 5C     2016-11-16
[ 285 ]  
 
Liaison statement to Working Party 1A and IEEE (copy to Working Parties 3M, 5A, 7C and 7D for information) - Preliminary information on fixed service applications associated with work on WRC-19 agenda item 1.15     WP 5C   AI1.15   2016-11-16
[ 123 ]  
 
Liaison statement to Working Parties 5A, 5D and Metro Ethernet Forum (MEF) (copy to ITU-T Study Group 15 and Next Generation Mobile Networks (NGMN) for information) - Preliminary draft new Report ITU-R F.[FS.IMT/BB] - Use of fixed service for transport of traffic, including backhaul, for IMT and other terrestrial mobile broadband systems     WP 5C     2016-05-25
[ 122 ]  
 
Liaison statement to External Organizations (copy for information to Working Parties 1A, 3J, 3K, 3M, 5A and 5D, 7C and 7D) - Technical and operational characteristics of the fixed service applications and their spectrum needs associated with work on WRC-19 agenda item 1.15     WP 5C   AI1.15   2016-05-24
[ 121 ]  
 
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M, 4A, 4B, 4C, 5A, 5B and 6A) - WRC-19 agenda item 1.7     WP 5C   AI1.7   2016-05-24
[ 117 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5B and 5D) - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA]     WP 5C     2016-05-20
[ 116 ]  
 
Liaison statement to ITU-R Working Parties 3M, 4A, 4C, 5A, 5D, 7B, 7C and 7D (for information to Task Group 5/1) - WRC-19 agenda item 1.14     WP 5C   AI1.14   2016-05-20
Results:37 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-7-17