International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5B  C 

ITU-R WP5B

Maritime mobile service including Global Maritime Distress and Safety System (GMDSS); aeronautical mobile service and radiodetermination service

Results:11 total items.
Contributions  [ Source: WP 1B ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 719 ]  
 
Reply liaison statement to Working Party 6A (copy for information to Working Parties 1A, 5A, 5B and 7A) - Frequency use by non-beam Wireless Power Transmission for Electric Vehicle (WPT-EV) applications using magnetic resonance power transfer     WP 1B     2019-06-17
[ 650 ]  
 
Liaison statement to Working Party 3L (copy for information to Working Parties 1A, 1C, 5A, 5B, 6A, and 7A) - Building entry losses in the frequency range 9 kHz to 10 MHz (far field and near field) (Question ITU-R 210-3/1)     WP 1B   AI9.1   2018-11-29
[ 649 ]  
 
Reply liaison statement to Working Party 5B - Aeronautical radionavigation service information for Wireless Power Transmission (WPT)     WP 1B     2018-11-29
[ 549 ]  
 
Reply liaison statement to Working Party 6A (copy to Working Parties 1A, 5B and 7A) - Draft CPM text on WRC-19 agenda item 9.1, Issue 9.1.6     WP 1B   AI9.1   2018-06-28
[ 214 ]  
 
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 with copy to ITU-D Study Group 1 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands...     WP 1B     2016-12-14
[ 213 ]  
 
Reply liaison statement to Working Parties 4C, 5A, 5C and 5D on the progress towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] (copied to ITU-R Working Parties 4A and 5B, ITU-R/ITU-D Joint Group on WDTC Resolution 9 and ITU-D Study Group 1 for information)     WP 1B     2016-12-14
[ 212 ]  
 
Liaison statement to Working Parties 1A, 5B, 5C, 6A, 7A and 7D - Studies on "Wireless power transmission (WPT)"     WP 1B   210/1   2016-12-14
[ 211 ]  
 
Liaison statement to Working Parties 1A, 5B and 6A - Studies on WRC-19 agenda item 9.1, issue 9.1.6 (Resolution 958 (WRC-15) Annex item 1) "Wireless power transmission"     WP 1B   AI9.1   2016-12-14
[ 99 ]  
 
Liaison statement to Working Parties 1A, 5B and 6A - Studies on WRC-19 agenda item 9.1, issue 9.1.6 - "Wireless power transmission for Electric Vehicles (WPT4EV)"     WP 1B   AI9.1   2016-06-20
[ 87 ]  
 
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing...     WP 1B     2016-06-13
[ 86 ]  
 
Reply liaison statement to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on the progress of ongoing work on WTDC Resolution 9 (Rev. Dubai, 2014) during the ITU-D Study period 2014-2017, with respect to Chapter 1 - New/emerging spectrum management approaches (copied to ITU-R Working Parties 1A, 1C, 5A, 5B, 5C, 5D, and 6A for information)     WP 1B     2016-06-13
Results:11 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-7-17