International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5C  C 

ITU-R WP5C

Fixed wireless systems; HF and other systems below 30 MHz in the fixed and land mobile services

Results:7 total items.
Contributions  [ Source: WP 1B ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 540 ]  
 
Liaison statement to Working Party 5C - Draft revision of Recommendation ITU-R SM.1896     WP 1B     2018-06-28
[ 197 ]  
 
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 with copy to ITU-D Study Group 1 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands...     WP 1B     2016-12-14
[ 196 ]  
 
Reply liaison statement to Working Parties 4C, 5A, 5C and 5D on the progress towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] (copied to ITU-R Working Parties 4A and 5B, ITU-R/ITU-D Joint Group on WDTC Resolution 9 and ITU-D Study Group 1 for information)     WP 1B     2016-12-14
[ 195 ]  
 
Liaison statement to Working Parties 1A, 5B, 5C, 6A, 7A and 7D - Studies on "Wireless power transmission (WPT)"     WP 1B   Q210/1   2016-12-14
[ 76 ]  
 
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing...     WP 1B     2016-06-13
[ 75 ]  
 
Liaison statement to Working Parties 5A and 5C on infrastructure sharing (copy to Working Parties 4C and 5C) - Innovative regulatory tools to support enhanced shared use of the spectrum     WP 1B   208-1/1   2016-06-13
[ 74 ]  
 
Reply liaison statement to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on the progress of ongoing work on WTDC Resolution 9 (Rev. Dubai, 2014) during the ITU-D study period 2014-2017, with respect to Chapter 1 - New/emerging spectrum management approaches (copied to ITU-R Working Parties 1A, 1C, 5A, 5B, 5C, 5D, and 6A for information)     WP 1B     2016-06-13
Results:7 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-10-19