International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP6A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP6A  C 

ITU-R WP6A

Terrestrial Broadcasting Delivery

Results:36 total items.
Contributions  [ Source: WP 1A ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 544 ]  
 
Reply liaison statement to Working Party 6A - Protection of sound broadcasting receivers from WPT systems     WP 1A     2019-06-24
[ 543 ]  
 
Reply liaison statement to CISPR (copy to ITU-R Working Parties 1A, 5A, 5B, 6A and 7A) - Establishment of liaison between CISPR-B and the relevant groups in ITU-R     WP 1A     2019-06-21
[ 542 ]  
 
Reply liaison statement to ITU-R Working Parties 5A and 5D and ITU-T Study Group 15 and 3GPP TSG RAN (copy to ITU-R Working Parties 5B, 5C, 6A, 7A, 7B, 7C and 7D) - Working document towards a preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid Utility Management Systems     WP 1A     2019-06-21
[ 541 ]  
 
Reply liaison statement to ITU-T Study Group 15 (copy to Working Parties 5A, 5B, 5C, 5D, 6A, 6B, 7A, 7B and 7D) - Liaison activities on the G.mgfast and G.fast - Power Spectral Density specifications     WP 1A     2019-06-21
[ 540 ]  
 
Liaison statement to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Liaison between ITU-R and CISPR ont the protection of radio services in the 6-40 GHz frequency range     WP 1A     2019-06-18
[ 539 ]  
 
Liaison statement to CISPR on EMC standards and limits (copy to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reducing EMI and RF noise     WP 1A     2019-06-18
[ 538 ]  
 
Reply liaison statement to CISPR on EMC standards and limits (copy for information to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reported cases of interference     WP 1A     2019-06-18
[ 410 ]  
 
Reply liaison statement to Working Parties 5A, 5B and 6A (copy to Working Party 1B) - Preliminary draft new Report ITU-R SM.[WPT_100-148.5KHZ]     WP 1A   Q210/1   2018-07-02
[ 409 ]  
 
Liaison statement to Working Parties 5A, 5B, 6A and 7A (copy to Working Party 1B for information) on preliminary draft revision of Recommendation ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems     WP 1A   Q210/1   2018-06-29
[ 408 ]  
 
Liaison statement to ITU-T Study Group 15 and ITU-R Working Parties 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid utility management systems     WP 1A     2018-06-29
[ 407 ]  
 
Reply liaisons statement to ITU-T Study Group 15 (copy to ITU-R Working Parties 5A, 5B, 5C, 5D, 6A, 7A, 7B and 7D) - Liaison activities on the G.mgfast PSD specification     WP 1A     2018-06-29
[ 404 ]  
 
Liaison statement to CISPR and ITU-T Study Group 5 on EMC standards and limits (copy to ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C & 7D) - Further Reports of Disturbances to Radiocommunication systems     WP 1A     2018-06-21
[ 338 ]  
 
Liaison statement to Working Parties 3L, 5A, 5B and 6A (copy to Working Party 1B for information) - Working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5kHz]     WP 1A     2017-12-12
[ 337 ]  
 
Reply liaison statement to ITU-T Study Group 15 (copy for information to Working Parties 5A, 5B, 5C, 5D and 6A) - Liaison Activities on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) Standards Overviews and Work Plans     WP 1A     2017-12-12
[ 263 ]  
 
Reply liaison statement to Working Party 7D (copy for information to Working Parties 1B, 4A, 4C, 5A, 5B, 6A, 7B, and 7C) - Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[SHARING-METHODS] - Methods for sharing between radiocommunication services     WP 1A     2017-07-10
[ 262 ]  
 
Liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 6A, 7A, 7B, 7C & 7D on Resolution 63 (Rev. WRC-12)     WP 1A     2017-07-10
[ 186 ]  
 
Reply liaison statement to Working Party 7D (copy to Working Parties 1B, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transfer (WPT)     WP 1A   Q210/1   2016-12-13
[ 185 ]  
 
Reply liaison statement to Working Party 6A (copy to Working Parties 1B, 1C, 5A, 5B, 5C, 7A and 7D) - Radio frequency ranges for Wireless Power Transmission (WPT)     WP 1A   Q210/1   2016-12-13
[ 184 ]  
 
Reply liaison statement to Working Party 5B (copied for information to Working Parties 1B, 5A, 5C, 6A, 7A and 7D) - Radio frequency ranges or wireless power transmission using technologies other than radio frequency beam     WP 1A   Q210/1   2016-12-13
[ 183 ]  
 
Liaison statement to Working Parties 5B and 6A - Proposed revision of Recommendation ITU-R SM.1009-1     WP 1A     2016-12-13
[ 182 ]  
 
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[SHARING-METHODS] - Methods for sharing between radiocommunications services     WP 1A     2016-12-13
[ 181 ]  
 
Liaison statement to Working Parties 1C, 3L, 5A, 5B, 5C, 6A, 7A and 7D - Assessment of the impact of unwanted radio frequency energy generated by non-radiocommunication equipment to radiocommunication services (Questions ITU-R 221-2/1 and ITU-R 236/1)     WP 1A   Q236/1, Q221-2/1   2016-12-13
[ 180 ]  
 
Liaison statement to ITU-T Study Group 15 (copy to Working Parties 5A, 5B, 5C, 5D, 6A and 6C) - Liaison statement on determination of Amendment 1 to Recommendation ITU-T G.9700 (2014)     WP 1A     2016-12-13
[ 90 ]  
 
Liaison statement to Working Parties 5A, 5C and 6A - Revision of Recommendation ITU-R SM.851     WP 1A     2016-06-21
[ 87 ]  
 
Liaison statement to Working Parties 5B and 6A - Proposed revision of Recommendation ITU-R SM.1009-1     WP 1A     2016-06-16
[ 86 ]  
 
Liaison statement to Working Party 7D (copy to Working Parties 1B, 5A, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam relative to protection of the passive services     WP 1A   210-3/1   2016-06-16
[ 85 ]  
 
Reply liaison statement to Working Party 5B (copied for information to Working Parties 1B, 5A, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam relative to the services under the purview of WP 5B     WP 1A   210-3/1   2016-06-16
[ 84 ]  
 
Reply liaison statement to Working Party 5A (copied for information to Working Parties 1B, 5B, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 1A   210-3/1   2016-06-16
[ 83 ]  
 
Liaison statement to Working Parties 1B, 5A, 5B, 5C, 6A, 7A and 7D - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 1A   210-3/1   2016-06-16
[ 82 ]  
 
Liaison statement to ITU-T Study Group 5 (copy for information to ITU-R Working Parties 5B & 6A) - ITU-R interest in K-series Recommendations     WP 1A     2016-06-16
[ 81 ]  
 
Liaison statement to ITU-T Study Group 5 (copy for information to ITU-R Working Parties 5B and 6A and to ITU-T Study Group 9) - Leakage and impact of radio frequency noise from telecommunication systems using metallic conductors     WP 1A     2016-06-16
[ 80 ]  
 
Liaison statement to Working Parties 1C & 3L (copy for information to Working Parties 5A, 5B, 5C, 6A, 7A & 7D) - Assessment of the impact of other emissions to Radiocommunication services (Questions ITU-R 221-2/1 & ITU-R 236/1)     WP 1A     2016-06-15
[ 79 ]  
 
Liaison statement to Working Parties 3J, 3K and 3M (copy to Working Parties 4A, 5A, 5C, 5D, 6A, 7C and 7D) - Propagation characteristics in the range 275-450 GHz in preparation for WRC-19 agenda item 1.15     WP 1A   AI1.15   2016-06-13
[ 78 ]  
 
Liaison statement to ITU-T Study Group 15 (copy to Working Parties 5A, 5B, 5C, 5D, 6A and 6C) - Liaison activities on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) standards overviews and work plans     WP 1A     2016-06-13
[ 77 ]  
 
Liaison statement to Working Parties 7C and 7D (copy to Working Parties 3J, 3K, 3M, 4A, 5A, 5C, 5D and 6A) - Request for characteristics of passive systems operating in the frequency range 275-450 GHz as related to WRC-19 agenda item 1.15     WP 1A   AI1.15   2016-06-13
[ 73 ]  
 
Liaison statement to ITU-R Working Parties 5A and 5C (copy to ITU-R Working Parties 3J, 3K, 3M, 4A, 5D, 6A, 7C and 7D) - Preparations for WRC-19 agenda item 1.15 - Request for characteristics of land-mobile and fixed service applications in the frequency range 275-450 GHz as related to WRC-19 agenda item 1.15     WP 1A   AI1.15   2016-06-08
Results:36 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-11-17