International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP6A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP6A  C 

ITU-R WP6A

Terrestrial Broadcasting Delivery

Results:21 total items.
Contributions  [ Source: WP 5A ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 530 ]  
 
Reply liaison statemen to Working Party 1A (copy to ITU-T Study Group 15 and ITU-R Working Parties 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid Utility Management Systems     WP 5A     2019-05-13
[ 529 ]  
 
Reply liaison statement to Working Party 6A - WRC-19 agenda item 1.11     WP 5A     2019-05-10
[ 528 ]  
 
Reply liaison statement to Working Party 7B (copy to Working Parties 4C, 5A, 5C and 6A for information) - Consideration of non-GSO short duration satellite systems in 137-138 MHz operating under the space operation service     WP 5A   AI1.7   2019-05-09
[ 479 ]  
 
Reply liaison statement to ITU-R Working Party 1A and the Rapporteur Group on the coexistence of wired telecommunication with radiocommunication systems (copy to Working Parties 5C and 5D) (copy for information to Working Parties 5B, 6A, 7A, 7B, 7C, 7D and ITU-T SG 15) - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid utility Management Systems     WP 5A     2018-11-20
[ 478 ]  
 
Liaison statement to Working Parties 5B, 5C and 6A - Progress report on WRC-19 agenda item 1.1 sharing and compatibility studies     WP 5A     2018-11-20
[ 477 ]  
 
Reply liaison statement to Working Party 6A - WRC-19 agenda item 1.11     WP 5A     2018-11-20
[ 475 ]  
 
Liaison statement to Working Parties 1A and 3L (copy to Working Parties 1B, 5B and 6A) - Comments on Report ITU-R SM.[WPT_100-148.5kHz]     WP 5A     2018-11-09
[ 401 ]  
 
Liaison statement to Working Party 6A (copied for information to Working Parties 3K, 3M, 5B and 5C) - Updated on work towards WRC-19 agenda item 1.1     WP 5A     2018-06-06
[ 400 ]  
 
Reply liaison statement to Working Party 6A - WRC-19 agenda item 1.11     WP 5A     2018-06-01
[ 399 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 3L, 5B and 6A) - Applicability of Recommendation ITU-R M.1732 for use in studies undertaken in working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5kHz]     WP 5A     2018-05-31
[ 398 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 3L and 6A) - Working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5 kHz]     WP 5A     2018-05-31
[ 332 ]  
 
Liaison statement to Working Parties 3K, 3M, 5B, 5C and 6A - Progress report on WRC-19 agenda item 1.1 sharing and compatibility studies     WP 5A   AI1.1   2017-11-22
[ 177 ]  
 
Liaison statement to Task Group 5/1 (copied for information to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, and 7D) - Preparations for WRC-19 agenda item 1.13     WP 5A   AI1.13   2016-11-23
[ 176 ]  
 
Reply liaison statement to ITU-R Working Party 6B (copy to Working Party 5D)     WP 5A     2016-11-23
[ 175 ]  
 
Liaison statement to Working Party 7C (copied to Working Parties 3L, 5B, 5C and 6A for information) - Technical and operational characteristics for systems operating within the 40-50 MHz frequency range     WP 5A     2016-11-23
[ 174 ]  
 
Reply liaison statement to Working Party 6A - Amateur service characteristics in the 50-54 MHz frequency band to be used in sharing studies with the amateur service under agenda item 1.1     WP 5A   AI1.1   2016-11-23
[ 173 ]  
 
Reply liaison statement to ITU-D Study Group 2 (copy to Working Parties 1B, 1C, 3L, 4A, 5A, 5C, 6A for information) - ITU-D Question 7/2: strategies and policies concerning human exposure to electromagnetic fields     WP 5A     2016-11-18
[ 69 ]  
 
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M 4A, 4B, 4C, 5B, 5C, 5D and 6A) - WRC-19 agenda item 1.7     WP 5A   AI1.7   2016-05-25
[ 68 ]  
 
Liaison statement to Working Party 7B (copied for information to Working Parties 3M, 4C, 5B, 5C, 5D and 6A) - Technical characteristics for WRC-19 agenda item 1.3     WP 5A   AI1.3   2016-05-25
[ 67 ]  
 
Liaison statement to Working Party 6A (copy to Working Parties 1B, 5B, 5C, 3K and 3M) - WRC-19 agenda item 1.1     WP 5A   AI1.1   2016-05-25
[ 66 ]  
 
Reply liaison statement to Working Party 1A (copy for information to Working Parties 1B, 5B 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 5A     2016-05-25
Results:21 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-8-6