International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1B  C 

ITU-R WP1B

Spectrum Management Methodologies and Economic Strategies

Results:4 total items.
Contributions  [ AI/Question: Q241/1 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 72 ]  
 
Proposed modification to working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     Korea (Republic of)   Q241/1   2022-06-20
[ 59 ]  
 
Factors need to be considered when developing the working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY]     China (People's Republic of)   Q241/1   2021-10-27
[ 58 ]  
 
Proposed modification to working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     Korea (Republic of)   Q241/1   2021-10-26
[ 44 ]  
 
Proposed working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     Korea (Republic of)   Q241/1   2021-05-14
Results:4 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-10-9