Temporary Documents
(GEN)
|
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 59-GEN ]
|
Report of WP2/6 meeting
|
Acting Chairman WP 2/6
|
Q3/6, Q5/6, Q7/6, Q8/6, Q9/6
|
2003-04-11 |
|
[ 58-GEN ]
|
Report of WP 1/6 meeting
|
Acting Chairman WP1/6
|
Q1/6, Q10/6, Q2/6, Q4/6, Q6/6
|
2003-04-10 |
|
[ 57-GEN ]
|
Report of the fourth meeting of Study Group 6 - Outside Plant (Geneva, 7-11 April 2003)
|
N/A
|
|
2003-04-10 |
|
[ 56-GEN ]
|
Reply to TSAG LS on security
|
Chairman SG6
|
QALL
|
2003-04-10 |
|
[ 55-GEN ]
|
Final list of participants
|
TSB
|
QALL
|
2003-04-10 |
|
[ 54-GEN ]
|
Revised draft new Recommendation L.53 (ex-L.mai): "Optical fibre maintenance criteria for access networks" (for consent)
|
Rapporteur Q.5/6
|
Q5/6
|
2003-04-10 |
|
[ 53-GEN ]
|
Revised draft new Recommendation L.52: "Deployment of Passive Optical Network (PON)" (for consent)
|
Rapporteur Q.9/6
|
Q9/6
|
2003-04-10 |
|
[ 52-GEN ]
|
Revised draft new Recommendation L.42: "Extending optical fibre solutions into the access network" (for consent)
|
Rapporteur Q.9/6
|
Q9/6
|
2003-04-10 |
|
[ 51-GEN ]
|
Amendment to "Draft new recommendation L.digitdb (for determination)"
|
Rapporteur Q.10/6
|
Q10/6
|
2003-04-10 |
|
[ 50-GEN ]
|
Reply to SG15 LS on the need for back-up power for subscriber end equipment in developing countries
|
Chairman SG6
|
Q1/15, Q3/6, Q4/6, Q5/6, Q7/6, Q9/6
|
2003-04-10 |
|
[ 49-GEN ]
(Rev.1) |
Draft new Recommendation: L.57: air-assisted installation of optical fibre cable (for consent)
|
Rapporteur Q4/6
|
Q4/6
|
2003-04-10 |
|
[ 48-GEN ]
(Rev.1) |
Contribution to Architecture of Optical Access Networks
|
Acting Chairman WP 2/6
|
Q9/6
|
2003-04-09 |
|
[ 47-GEN ]
|
Comments of WP 2/6 to documents of Q.5/6
|
Acting Chairman WP 2/6
|
Q5/6
|
2003-04-09 |
|
[ 46-GEN ]
|
Draft New Recommendation On Safety Procedures for Outdoor Installations
|
Acting Rapporteur Q.2/6
|
Q2/6
|
2003-04-09 |
|
[ 45-GEN ]
(Rev.1) |
Proposed structure for Recommendation L.unb - Practical aspects of unbundling for provided services by multiple operators in commonly used network topologies
|
Rapporteur Q.3/6
|
Q3/6
|
2003-04-09 |
|
[ 44-GEN ]
|
Answers for the Questionnaire on Safety Procedures for Outdoor Installations
|
Acting Rapporteur Q.2/6
|
Q2/6
|
2003-04-09 |
|
[ 43-GEN ]
(Rev.1) |
Draft Revised Recommendation L.19: "Multi-pair copper network cable supporting shared multiple services such as POTS/ISDN/xDSL" (for consent)
|
Rapporteur Q.3/6
|
Q3/6
|
2003-04-09 |
|
[ 42-GEN ]
(Rev.1) |
Draft new Recommendation: L.rail: Installation of optical fibre cable along railways (for consent)
|
Rapporteur Q.4/6
|
Q4/6
|
2003-04-09 |
|
[ 41-GEN ]
|
LS to SG 15 - Reply to inquiry on operation of components at high optical power levels
|
ITU-T SG6
|
Q17/15, Q7/6
|
2003-04-08 |
|
[ 40-GEN ]
(Rev.1) |
Draft proposal for a new Recommendation L.50 (ex-L.ODF): Performance requirements for passive optical notes: Optical distribution frames for indoor use - Including comments from the WP2 meeting on 8 April 2003
|
Rapporteur Q.7/6
|
Q7/6
|
2003-04-08 |
|
[ 39-GEN ]
|
Comments for D.39 (draft new Recommendation L.50 (ex L.ODF))
|
Rapporteur Q.7/6
|
Q7/6
|
2003-04-08 |
|
[ 38-GEN ]
|
LS from ITU-T SG 9: Reply to TSAG on Restructuring of Study Groups (LS02-TSAG)
|
ITU-T SG 9
|
QALL
|
2003-04-08 |
|
[ 37-GEN ]
|
Draft Revised Recommendation L.19: "Multi-pair copper network cable supporting shared multiple services such as POTS/ISDN/xDSL" (for consent)
|
Rapporteur Q.3/6
|
Q3/6
|
2003-04-08 |
|
[ 36-GEN ]
(Rev.1) |
Draft revised Rec. L.45 "Minimizing the effect on the environment from the outside plant in telecommunication networks" (for consent)
|
Rapporteur Q.1/6
|
Q1/6
|
2003-04-08 |
|
[ 35-GEN ]
(Rev.1) |
Rec. L.51 (for approval)
|
Rapporteur Q.7/6
|
Q7/6
|
2003-04-07 |
|
[ 34-GEN ]
(Rev.1) |
Rec. L.13 revised (for approval)
|
Rapporteur Q.7/6
|
Q7/6
|
2003-04-07 |
|
[ 33-GEN ]
|
Withdrawn
Withdrawn
|
TSB
|
QALL
|
2003-04-07 |
|
[ 32-GEN ]
|
Draft press release on L.13 and L.51
|
TSB Management team
|
QALL
|
2003-04-07 |
|
[ 31-GEN ]
|
Draft new Recommendation l.54 (ex-Ljointbox): "Splice closures for marinized terrestrial cables (MTC)"
|
Rapporteur Q.10/6
|
Q10/6
|
2003-03-31 |
|
[ 30-GEN ]
|
LS from Rapporteur Q.9/5 - Earthing near railways
|
Rapporteur Q.9/5
|
Q4/6, Q6/6
|
2003-03-11 |
|
[ 29-GEN ]
|
LS from TSAG - Correspondence Group on Time-E
|
TSAG
|
QALL
|
2003-03-11 |
|
[ 28-GEN ]
|
LS from TSAG on regional balance to ITU-T meetings
|
TSAG
|
QALL
|
2003-03-11 |
|
[ 27-GEN ]
|
LS from TSAG on use of mandatory terms such as "shall" or "must" in ITU-T Recommendations
|
TSAG
|
QALL
|
2003-03-11 |
|
[ 26-GEN ]
|
LS from TSAG on procedures for SG Questions
|
TSAG
|
QALL
|
2003-03-11 |
|
[ 25-GEN ]
(Rev.1) |
LS from TSAG - ToR and action plan for the ITU-T SGs Restructuring Group
|
TSAG
|
QALL
|
2003-03-11 |
|
[ 24-GEN ]
|
LS from TSAG on Security
|
TSAG
|
QALL
|
2003-03-11 |
|
[ 23-GEN ]
|
LS from ITU-T SG 15 - The need for back-up power for subscriber end equipment in developing countries
|
ITU-T SG 15
|
Q3/6, Q4/6, Q5/6, Q7/6, Q9/6
|
2003-03-10 |
|
[ 22-GEN ]
|
LS from ITU-T SG 15 - New versions of the ANT standardization plan and work plan
|
ITU-T SG 15
|
QALL
|
2003-03-10 |
|
[ 21-GEN ]
|
LS from Rapporteur Q.17/15 - Operation of components at High Optical Power Levels
|
Rapporteur Q.17/15
|
Q4/6, Q5/6, Q7/6, Q8/6, Q9/6
|
2003-03-10 |
|
[ 20-GEN ]
|
LS from ITU-T SG 13 - Proposal for deletion of Q.14/13
|
ITU-T SG 13
|
QALL
|
2003-03-10 |
|
[ 19-GEN ]
|
LS from ITU-T SG 13 - ITU-T IP Project
|
ITU-T SG 13
|
QALL
|
2003-03-10 |
|
[ 18-GEN ]
|
LS from ITU-T SG13 - ITU-T NGN 2004 Project
|
ITU-T SG 13
|
QALL
|
2003-03-10 |
|
[ 17-GEN ]
|
LS from ITU-T SG 13 WP2/13 - SG13 work on interworking with MPLS
|
ITU-T SG 13
|
QALL
|
2003-03-10 |
|
[ 16-GEN ]
|
LS from ITU-T SG 6 - Reply on Q.3/6
|
ITU-T SG 5
|
Q1/5, Q3/6
|
2003-03-10 |
|
[ 15-GEN ]
|
LS from ITU-.T SG 6 - Reply from IEC TC86 and SG6/TC86 common area
|
Chairman SG6
|
QALL
|
2003-03-10 |
|
[ 14-GEN ]
|
Draft schedule of ITU-T meetings - 2004
|
TSB
|
QALL
|
2003-03-11 |
|
[ 13-GEN ]
|
ITU-T Software Copyright Guidelines version 2.0
|
TSB
|
QALL
|
2003-03-11 |
|
[ 12-GEN ]
|
Summary report on Project Mediacom 2003 and SG16 activities (Chairman of SG16)
|
TSB
|
QALL
|
2003-03-11 |
|
[ 11-GEN ]
|
Activities of IEC 46C - Symmetrical Cables
|
IEC SC 46C
|
Q3/6
|
2003-03-31 |
|
[ 10-GEN ]
|
ITU-T Workshops, current program
|
TSB
|
QALL
|
2003-04-01 |
Results:59 total items. Result page:
1 -
2
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):