International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG13 : Meeting 2000-11-20 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG13  TD-WP3 (2000-11-20) 

ITU-T SG13

WP 2/13 (Architectures and internetworking principles ) and WP 3/13 (Multi-protocol networks and mechanisms)

Study Period 2001

Meeting  from 2000-11-20 to 2000-11-24

held in Switzerland [Geneva]

Other Meetings : 2004-10-01  2004-06-22  2004-02-03  2003-07-21  2002-10-29  2002-07-08  2002-01-22  2001-05-14  [ 2000-11-20 ] 

Results:34 total items.
Temporary Documents  (WP3)   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 34-WP3 ]  
 
LS to SG 15 on IInput for Access Network Standardisation Plan     ITU-T SG 13   Q14/13   2000-11-24
[ 33-WP3 ]  
 
Draft Recommendation Y.17oam.1     Rapporteur, Q.6/13   Q6/13, 3/13   2000-11-24
[ 32-WP3 ]  
 
Report of the Q.6/13 (new 3/13) meeting     Rapporteur Q.6/13   Q6/13, Q.3/13   2000-11-24
[ 31-WP3 ]  
 
New Action Point for G.805 Living List     Rapporteur   Q19/13   2000-11-24
[ 30-WP3 ]  
 
Meeting report for Question 19/13     Rapporteur of Q.19/13   Q19/13   2000-11-24
[ 29-WP3 ]  
 
LS TO ITU-R ON SG 4     ITU-T SG 13 WP 3/13   Q12/13   2000-11-24
[ 28-WP3 ]  
 
Version 1.4 of Draft revised Rec. G.872     Editor G.872   Q19/13   2000-11-24
[ 27-WP3 ]  
 
LS to ITU-T SG 2 on draft new Rec. Y.1231     ITU-T SG 13 WP 3/13   Q12/13   2000-11-24
[ 26-WP3 ]  
 
Living List v1.4 for version 2 of Rec. G.872     Editor G.872   Q19/13   2000-11-24
[ 25-WP3 ]  
 
Living List v1.0 for version0.3 of Draft Rec. G.astn     Editor G.ASTN   Q19/13   2000-11-24
[ 24-WP3 ]  
 
LS to ITU-T SG 15 on ANT standardization plan     ITU-T SG 13 WP 3/13   Q12/13   2000-11-24
[ 23-WP3 ]  
 
LS to ITU-T SG 15 on status of work transferred to new SG 15     ITU-T SG 13 WP 3/13   Q14/13   2000-11-24
[ 22-WP3 ]  
 
Meeting report for Q12/13     Rapporteurs for Q12/13   Q12/13   2000-11-24
[ 21-WP3 ]  
 
Meeting report of Q11/13     Rapporteur for Q11/13   Q11/13   2000-11-24
[ 20-WP3 ]  
 
Draft meeting report for Question 4/13 - ATM Layer     Rapporteur Q. 4/13   Q4/13   2000-11-24
[ 19-WP3 ]  
 
Draft meeting report for Question 26/13 - Multimedia customer access layer 1 requirements     Rapporteur Q. 26/13   Q26/13   2000-11-24
[ 18-WP3 ]  
 
Liaison on the progress of new Recommendation Y.1231     ITU-R WP 4B   Q20/13   2000-11-22
[ 17-WP3 ]  
 
Agenda of Q.19/13 Meeting     Rapporteur 19/13   Q19/13   2000-11-21
[ 16-WP3 ]  
 
Meeting schedule and agenda for Q.6/13     Rapporteur 6/13   Q6/13   2000-11-21
[ 15-WP3 ]  
 
Draft Agenda for Q.12/13 meeting     Rapporteurs   Q12/13   2000-11-21
[ 14-WP3 ]  
 
Draft Agenda for WP 3/13 meeting     Chairman of WP 3/13   Q4, 6, 26/13, 19, 12, 11   2000-11-20
[ 13-WP3 ]  
 
Version 1.3 of Draft revised Rec. G.872     Editor G.872   Q19/13   2000-11-16
[ 12-WP3 ]  
 
Living List Version 1.3 for Draft revised Rec. G.872     Editor G.872   Q19/13   2000-11-16
[ 11-WP3 ]  
 
Questions regarding VP/VC protection (I.630)     ITU-T Study Group 13 Chairman (Mr. B. W. Moore) on behalf of The ATM Forum   Q6/13   2000-11-16
[ 10-WP3 ]  
 
G.ason Draft V.0.2, "Architecture for the Automatic Switched Optical Network" (ASON)     Editor   Q19/13   2000-11-16
[ 9-WP3 ]  
 
UNI Carrier Requirements Document     ITU-T Study Group 13 Chairman (Mr. B. Moore) on behalf of T1X1   Q19/13   2000-11-16
[ 8-WP3 ]  
 
LS from ITU-R SG 4 WP 4B on the progress of new Rec. Y.1231     ITU-R SG 4 WP 4B meeting   Q12/13   2000-11-08
[ 7-WP3 ]  
 
LS from SG2 on draft Rec. Y.1231     ITU-T SG 2   Q8/2, Q7/2, Q6/2, Q12/13   2000-11-08
[ 6-WP3 ]  
 
LS from SG 15 on OCh interface specifications for payloads of 40Gb/s     ITU-T SG 15   Q9/15, Q20/15, Q19/13, Q16/15, Q11/15   2000-11-08
[ 5-WP3 ]  
 
LS from SG 15 on Comment on the title of Question D/13     ITU-T SG 15   Q6/13, Q14/15, Q13/15   2000-11-08
[ 4-WP3 ]  
 
LS from SG 15 Segment AIS provisioning     ITU-T SG 15   Q6/13, Q21/4, Q10/15   2000-11-08
[ 3-WP3 ]  
 
Report of Q.19/13 meeting (13-15 September 2000)     Rapporteur 19/13   Q19/13   2000-11-08
[ 2-WP3 ]  
 
G.964 - draft for determination     Rapporteur 12/13   Q12/13   2000-11-08
[ 1-WP3 ]  
 
G.965 - draft for determination     Rapporteur 12/13   Q12/13   2000-11-08
Results:34 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-7-22