International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG13 : Meeting 2001-05-14 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG13  D (2001-05-14) 

ITU-T SG13

WP 2/13 (Architectures and internetworking principles ) and WP 3/13 (Multi-protocol networks and mechanisms)

Study Period 2001

Meeting  from 2001-05-14 to 2001-05-25

held in Venezuela [Caracas]

Other Meetings : 2004-10-01  2004-06-22  2004-02-03  2003-07-21  2002-10-29  2002-07-08  2002-01-22  [ 2001-05-14 ]  2000-11-20 

Results:65 total items.
Result page:  1 - 2  - Next Next
Delayed Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 159 ]  
 
Contribution to the debate on draft new Recommendation Y.1541     Eutelsat   Q6/13   2001-05-02
[ 158 ]  
 
G.astn Signalling System Congestion     BT   Q10/13   2001-05-02
[ 157 ]  
 
Connection and connectionless transport entities     BT   Q10/13   2001-05-02
[ 156 ]  
 
Architectural Components for G.cls     BT   Q10/13   2001-05-02
[ 155 ]  
 
Comments on G.astn     BT   Q10/13   2001-05-02
[ 154 ]  
 
G.ason architectural framework     BT   Q10/13   2001-05-02
[ 153 ]  
 
Discussion of SES Errored Block Threshold and Degraded Second Event for G.optperf     USA   Q8/13   2001-05-02
[ 152 ]  
 
Initial Calculations for SES Errored Block Thresholds for ODUk and OTUk     USA   Q8/13   2001-05-02
[ 151 ]  
 
Analysis Leading to 1 x BIP-8 EDC Usage for ODUk and OTUk     USA   Q8/13   2001-05-02
[ 150 ]  
 
IP Packet delay variation calcualtion for HRPs in Y.1541     Royal KPN N.V.   Q6/13   2001-05-02
[ 149 ]  
 
Packet Delay Variation value for IP QoS classes 0 and 1 (Interactive) in Y.1541     Royal KPN N.V.   Q6/13   2001-05-02
[ 148 ]  
 
Updated compendium of IP-Related work activities within the Telecommunication Industry Association (TIA)     USA   QALL/13   2001-05-02
[ 147 ]  
 
Corrections to ITU-T Recommendation G.827     Eutelsat   Q8/13   2001-05-02
[ 146 ]  
 
Proposed living list of issues for ITU-T Recommendation G.827 and G.827.1     Eutelsat   Q8/13   2001-05-02
[ 145 ]  
 
Proposal for a Liaison Statement to SG 9 on Draft Recommendation J.160     Federal Republic of Germany   Q1/13   2001-05-02
[ 144 ]  
 
Structure of a new section of I.371 on AAL2 resource management     Siemens AG   Q4/13, Q2/13   2001-05-02
[ 143 ]  
 
Reasons why other methods do not fulfill MPLS OAM requirements     Canada   Q3/13   2001-05-02
[ 142 ]  
 
Modifications to requirements in Y.17OAM.1     Canada   Q3/13   2001-05-02
[ 141 ]  
 
ATM-MPLS Interworking     Canada   Q5/13   2001-05-02
[ 140 ]  
 
Bandwidth Efficient Interworking     Canada   Q5/13   2001-05-02
[ 139 ]  
 
AAL type 2 CPS-Packets carried on AAL type 1     Swisscom Ltd.   Q2/13   2001-05-02
[ 138 ]  
 
Frameworks for the ATM Network Performance under IP transport work     Korea Telecom   Q7/13   2001-05-02
[ 137 ]  
 
Scope and issues of "asymmetric bi-directional architecture of Automatic Switched Transport Network which is composed with unidirectional connection for adapting to Asymmetric traffic pattern of IP"     Korea Telecom   Q10/13, Q8/13   2001-05-02
[ 136 ]  
 
A proposal of resilience measure and its calculation method in multi-layer networks for improving network quality against communication disaster     Korea Telecom   Q10/13, Q8/13   2001-05-02
[ 135 ]  
 
Mobility Support on the MPLS Network     Korea (Rep. of)   Q11/13   2001-05-02
[ 134 ]  
 
Proposed editorial for Appendices I and III in draft new Recommendation Y.1541     Telstra Corp. (Australia)   Q6/13   2001-05-02
[ 133 ]  
 
Comments on and required editorials for new Recommendation Y.1541     Tesltra Corp. (Australia)   Q6/13   2001-05-02
[ 132 ]  
 
Proposal to initiate protocol specific work on core network architecture     NTT   Q11/13, Q10/13   2001-05-02
[ 131 ]  
 
Proposal of resource concealment functionality in G.astn     NTT   Q10/13   2001-05-02
[ 130 ]  
 
Proposed requirments for charging on draft Recommendation G.astn     NTT   Q10/13   2001-05-02
[ 129 ]  
 
Proposed requirements for diverse routing on draft Recommendation G.astn     NTT   Q10/13   2001-05-02
[ 128 ]  
 
Proposed requriements for addressing on draft Recommendations G.astn     NTT   Q10/13   2001-05-02
[ 127 ]  
 
Proposed requirements for survivability on draft Recommendation G.astn     NTT   Q10/13   2001-05-02
[ 126 ]  
 
A proposal on objectives in draft Recommendation Y.1530     NTT   Q9/13   2001-05-02
[ 125 ]  
 
Proposals on hypothetical reference paths and QoS classes regarding IP network performance in draft Recommendation Y.1541     NTT   Q6/13   2001-05-02
[ 124 ]  
 
Proposal of a framework for defining TCP performance parameters on IP-based networks     NTT   Q6/13   2001-05-02
[ 123 ]  
 
A proposal on standardization regarding TCP performance parameters on IP-based networks     NTT   Q6/13   2001-05-02
[ 122 ]  
 
Proposed additional requirements for MPLS OAM fuctions     NTT   Q3/13   2001-05-02
[ 121 ]  
 
Proposal of splitting Draft Recommendation Y.17oam.1 into requirements and mechanisms parts     NTT   Q3/13   2001-05-02
[ 120 ]  
 
IP Delay Variation Defintion for Y.1540     USA   Q6/13   2001-05-02
[ 119 ]  
 
IP Burst Error Definition for Y.1540     USA   Q6/13   2001-05-02
[ 118 ]  
 
Consideration of ANS T1.523-2001, Telecom Glossary 2000, in Study Group 13 work on General Network Terminology     USA   Q15/13   2001-05-02
[ 117 ]  
 
Framework for Supporting IEPS in IP Telephony     USA   Q16/13, Q14/13, Q12/13, Q11/13, Q9/13, Q6/13, Q5/13, Q4/13, Q1/13   2001-05-02
[ 116 ]  
 
Resolution of Open Items in Draft New Recommendation Y.1541     USA   Q6/13   2001-05-02
[ 115 ]  
 
Excerpts from T1 Standard on Quality of Service for Business Multimedia Conferencing - for information     USA   Q6/13   2001-05-02
[ 114 ]  
 
Revisions for Draft Recommendation Y.1541, IP Performance Objectives     USA   Q6/13   2001-05-02
[ 113 ]  
 
Proposal for Delay Variation Parameters on Rec. Y.1540     USA   Q6/13   2001-05-02
[ 112 ]  
 
Impact of bursty AAL2 connections on utilization and delay     Siemens AG   Q4/13, Q2/13   2001-05-02
[ 111 ]  
 
How to achieve end-to-end delay for AAL2 connections     Siemens AG   Q4/13, Q2/13   2001-05-02
[ 110 ]  
 
New work item: Voice over MPLS (VoMPLS)     Swisscom Ltd.   Q11/13   2001-05-02
Results:65 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2003-10-14