International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG13 : Meeting 2003-07-21 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG13  TD-WP1 (2003-07-21) 

ITU-T SG13

WP 2/13 (Architectures and internetworking principles ) and WP 3/13 (Multi-protocol networks and mechanisms)

Study Period 2001

Meeting  from 2003-07-21 to 2003-08-01

held in Switzerland [Geneva]

Other Meetings : 2004-10-01  2004-06-22  2004-02-03  [ 2003-07-21 ]  2002-10-29  2002-07-08  2002-01-22  2001-05-14  2000-11-20 

Results:19 total items.
Temporary Documents  (WP1)   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 19-WP1 ]  
 
WP 1/13 Liaison statements     Chairman WP 1/13   Q12/13   2003-07-29
[ 18-WP1 ]  
 
Report of WP 1/13     Chairman WP 1/13   Q12/13, Q15/13   2003-07-29
[ 17-WP1 ]  
 
Draft Version 2 of the NGN 2004 Project description document     Chairman WP 1/13   Q12/13   2003-07-28
[ 16-WP1 ]  
 
Proposed draft text for the living list of the NGN 2004 Project     WP 1/13 Chairman   Q12/13   2003-07-24
[ 15-WP1 ]  
 
New Study area on Network control architectures and protocols in the NGN-2004 Project     WP 1/13 Chairman   Q12/13   2003-07-24
[ 14-WP1 ]  
 
Proposed draft text for two New Study Areas in the NGN-2004 Project     WP 1/13 Chairman   Q12/13   2003-07-24
[ 13-WP1 ]  
+Corr.1 
ITU-T IP Project Description, draft Version 8     WP 1/13 Chairman   Q12/13   2003-07-22
[ 12-WP1 ]  
 
Draft Agenda for WP 1/13 meeting     Chairman WP 1/13   Q12/13, Q15/13   2003-07-21
[ 11-WP1 ]  
 
Numbering, Naming and Addressing     Rapporteur Q.12/13   Q12/13   2003-07-18
[ 10-WP1 ]  
 
Proposed draft text for a New Study Area in NGN-2004 on Service aspects     Rapporteur Q.12/13   Q12/13   2003-07-18
[ 9-WP1 ]  
 
Liaison statement on new NGN 2004 project     ITU-R WP 4B   Q12/13   2003-06-24
[ 8-WP1 ]  
 
Liaison statement on the ITU-T IP Project     ITU-T SG 17   Q12/13, Q15/13, QALL/17   2003-06-24
[ 7-WP1 ]  
 
Liaison statement on information to SG 13 on IP project and NGN 2004 project     ITU-T SG 12   Q1/12, Q12/13   2003-06-24
[ 6-WP1 ]  
 
Liaison statement on revisions to the IP project plan     ITU-T SG 11   Q12/13, QALL/11   2003-06-24
[ 5-WP1 ]  
 
Liaison statement on proposed changes to the IP project plan     ITU-T SG 4   Q10/4, Q12/13   2003-06-24
[ 4-WP1 ]  
 
Liaison reply to SG 13 on ITU-T IP Project     ITU-T SG 3   Q12/13   2003-06-24
[ 3-WP1 ]  
 
Liaison reply to SG 13 on ITU-T NGN 2004 Project     ITU-T SG 3   Q1/3, Q12/13   2003-06-24
[ 2-WP1 ]  
 
Liaison statement on IP studies within SG 2 (2003)     ITU-T SG 2   Q12/13, QALL/2   2003-06-24
[ 1-WP1 ]  
 
Liaison statement on IP studies within SG 2 (2002)     ITU-T SG 2   Q12/13, QALL/2   2003-06-24
Results:19 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-7-22