International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG13 : Meeting 2004-02-03 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG13  TD-WP3 (2004-02-03) 

ITU-T SG13

WP 2/13 (Architectures and internetworking principles ) and WP 3/13 (Multi-protocol networks and mechanisms)

Study Period 2001

Meeting  from 2004-02-03 to 2004-02-12

held in Switzerland [Geneva]

Other Meetings : 2004-10-01  2004-06-22  [ 2004-02-03 ]  2003-07-21  2002-10-29  2002-07-08  2002-01-22  2001-05-14  2000-11-20 

Results:38 total items.
Temporary Documents  (WP3)   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 38-WP3 ]  
(Rev.1) 
Information on L1 VPN related work in SG 13     ITU-T SG 13   Q11/13   2004-02-11
[ 37-WP3 ]  
 
Draft meeting report of WP 3/13     Chairman WP 3/13   Q11/13, Q3/13, Q2/13   2004-02-10
[ 36-WP3 ]  
 
Support of voice band data modems and legacy text telephones by AAL type 2     ITU-T SG 13   Q2/13   2004-02-10
[ 35-WP3 ]  
 
Liaison Statement from Q.3/13     Q.3/13 Rapporteur   Q3/13   2004-02-10
[ 34-WP3 ]  
 
Draft new Recommendation Y.17ethps - Ethernet Protection switching     Editor, Y.17ethps   Q3/13   2004-02-10
[ 33-WP3 ]  
 
Draft Recommendation Y.17ethoam (OAM functions and mechanisms for Ethernet based networks)     Editor, Y.17ethoam   Q3/13   2004-02-10
[ 32-WP3 ]  
 
Draft Recommendation Y17fw (MPLS management framework)     Editor, Y17ethps   Q3/13   2004-02-10
[ 31-WP3 ]  
 
Report of the Q.3/13     Q.3/13 Rapporteur   Q3/13   2004-02-10
[ 30-WP3 ]  
 
L2VPN over MPLS solution space     Q.11/13 Rapporteur   Q11/13   2004-02-11
[ 29-WP3 ]  
(Rev.1) 
Information on L1 VPN related work in SG 13     ITU-T SG 13   Q11/13   2004-02-11
[ 28-WP3 ]  
(Rev.1) 
Information on L1 VPN related work in SG 13     ITU-T SG 13   Q11/13   2004-02-11
[ 27-WP3 ]  
(Rev.1) 
Information on L1 VPN related work in SG 13     ITU-T SG 13   Q11/13   2004-02-11
[ 26-WP3 ]  
 
Minor changes to draft text of Question A/NGN for the next study period (including those from results of 6 February 2004 meeting)     Q.11/13 Rapporteur   Q11/13   2004-02-10
[ 25-WP3 ]  
 
Document summarizing Layer 1 VPN work in SG13 up to now (attached to this SG13 meeting liaison to IETF on LV VPN)     Q.11/13 Rapporteur   Q11/13   2004-02-11
[ 24-WP3 ]  
 
Q.11/13 Living list     Q.11/13 Rapporteur   Q11/13   2004-02-11
[ 23-WP3 ]  
(Rev.1-2) 
Q.11/13 report     Q.11/13 Rapporteur   Q11/13   2004-02-11
[ 22-WP3 ]  
(Rev.1) 
Questionnaire in the area of Layer 1 VPN services     Q.11/13 Rapporteur   Q11/13   2004-02-11
[ 21-WP3 ]  
 
Outline and scope of new Draft Recommendation "QoS support for VPN services - Framework and Characteristics" (tentatively called Y.vpn-QoS)     COM 13 - D 458 Author   Q11/13   2004-02-11
[ 20-WP3 ]  
 
Y.nbvpn-decomp     Q.11/13 drafting team   Q11/13   2004-02-11
[ 19-WP3 ]  
 
Update of draft Recommendation Y.NGN-MOB agreed as outcome of Geneva February 2004 SG 13 meeting     Q.11/13 Rapporteur and Y.NGN.MOB Co-Editors   Q11/13   2004-02-11
[ 18-WP3 ]  
 
Update of draft Recommendation Y.NGN-SRQ agreed as outcome of Geneva February 4 SG 13 meeting     Editor Y.NGN-SRQ   Q11/13   2004-02-11
[ 17-WP3 ]  
 
Reply LS to SG 13 on Additions to I.366.2     ITU-T SG 16   Q2/13   2004-02-04
[ 16-WP3 ]  
 
Draft Agenda for WP 3/13 meeting     Chairman of WP 3/13   Q11/13, Q3/13, Q2/13   2004-02-02
[ 15-WP3 ]  
 
Meeting schedule and agenda for Q.3/13     Rapporteur Q.3/13   Q3/13   2004-02-02
[ 14-WP3 ]  
 
Proposed revised text for New Questions for OAM and network management     Q.3/13 Rapporteur   Q3/13   2004-02-02
[ 13-WP3 ]  
 
Proposal for editorial and other minor changes to the revised text of Q.11/13 contained in TD 6 (PLEN) (Results of session on New Questions, 15-16 January 2004, Geneva)     Q.11/13 Rapporteur   Q11/13   2004-02-02
[ 12-WP3 ]  
(Rev.1-3) 
Q.11/13 provisional Agenda     Q.11/13 Rapporteur   Q11/13   2004-02-02
[ 11-WP3 ]  
 
ITU-T draft revised Recommendation Y.1711 - AAP Results     TSB   Q3/13   2004-01-22
[ 10-WP3 ]  
 
Structured probable cause     ITU-T Study Group 4   Q3/13   2003-12-19
[ 9-WP3 ]  
 
Removal of proposed Amendments (Level 3) from Rec. M.3100 status document     ITU-T Study Group 4   Q3/13   2003-12-19
[ 8-WP3 ]  
 
Amendment to the generic network information model (M.3100)     ITU-T Study Group 4   Q3/13   2003-12-19
[ 7-WP3 ]  
 
Timing issues on TDM over packets     ITU-T Study Group 15   Q2/13   2003-12-04
[ 6-WP3 ]  
 
on Statement on Point-to-point Ethernet based optical access system (G.985)     ITU-T Study Group 15   Q3/13   2003-12-04
[ 5-WP3 ]  
 
On MPLS network management issues (Y.17fw)     Q.3/13 Rapporteur Group   Q3/13   2003-11-27
[ 4-WP3 ]  
 
On point-to-point Ethernet based optical access system (G.985)     Q.3/13 Rapporteur Group   Q3/13   2003-11-27
[ 3-WP3 ]  
 
Draft Recommendation Y.17ethoam (OAM functions and mechanisms for Ethernet based networks)     Editors, Y.17ethoam   Q3/13   2003-12-04
[ 2-WP3 ]  
 
Draft Recommendation Y.17fw (MPLS management framework)     Editor Y.17fw   Q3/13   2003-11-27
[ 1-WP3 ]  
 
Text for draft Recommendation on Generic NBVPN functional decomposition (Y.nbvpn-decomp)     Acting editor   Q11/13   2004-01-22
Results:38 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-7-22