International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2001-10-15 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  D (2001-10-15) 

ITU-T SG15

Optical and other transport networks

Study Period 2001

Meeting  from 2001-10-15 to 2001-10-26

held in Switzerland [Geneva]

Other Meetings : 2004-04-19  2003-10-21  2003-01-20  2002-04-29  [ 2001-10-15 ]  2001-02-05 

Results:19 total items.
Delayed Contributions  [ Source: Lucent ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 304 ]  
 
Physical interface and topology aspects of VBI     Lucent Technologies Nederland   Q11/15   2001-10-03
[ 303 ]  
 
Performance aspects of VBI     Lucent Technologies Nederland   Q11/15   2001-10-03
[ 302 ]  
 
New equipment partitioning     Lucent Technologies Nederland   Q11/15   2001-10-03
[ 301 ]  
 
New distributed applications resulting from new equipment partitioning     Lucent Technologies Nederland   Q11/15   2001-10-03
[ 300 ]  
 
OTN interface locations in the transport plane's viewpoint     Lucent Technologies Nederland   Q12/15, Q11/15   2001-10-03
[ 299 ]  
 
OTN connection characteristics and network and terminal interface presentation     Lucent Technologies Nederland   Q11/15   2001-10-03
[ 298 ]  
 
ODUk virtual concatenation (ODUk-Xv)     Lucent Technologies Nederland   Q11/15, Q9/15   2001-10-03
[ 297 ]  
 
ODUk time division multiplexing     Lucent Technologies Nederland   Q13/15, Q11/15, Q9/15   2001-10-03
[ 296 ]  
 
A uniform architectural model for policy     Lucent Technologies Nederland   Q12/15   2001-10-03
[ 295 ]  
 
ASON components and interfaces     Lucent Technologies Nederland   Q12/15   2001-10-03
[ 294 ]  
 
Trail trace identifier processing in G.798     Lucent Technologies Nederland   Q9/15   2001-10-03
[ 218 ]  
 
Enhanced PMD cable infrastructure requirement for high rate transport     Lucent Technologies Germany   Q16/15, Q15/15   2001-10-03
[ 217 ]  
 
RZ signal duty cycle definition proposal and alternative parameter validation method for 40-Gbit/s application codes for new optical long haul interface specifications in G.959.1     Lucent Technologies Germany   Q16/15   2001-10-03
[ 216 ]  
 
Value confirmation and new proposal for 40G intra-office interfaces     Lucent Technologies Germany   Q16/15   2001-10-03
[ 215 ]  
 
Dispersion figures in G.vsr and maximum possible distance     Lucent Technologies Germany   Q16/15   2001-10-03
[ 210 ]  
 
Measurement implications of a 0.10 ps/km1/2 PMD link design value     Lucent Technologies   Q15/15   2001-10-03
[ 183 ]  
 
Initial jitter and short-term wander accumulation simulation results for STM-N clients transported over ODUk Islands for cases involving ODUk multiplexing     Lucent Technologies   Q13/15   2001-10-03
[ 174 ]  
 
Carriage of 10GBASE-W Ethernet over SDH     Nortel, Lucent, PMC-Sierra   Q19/15, Q12/15, Q11/15   2001-10-03
[ 172 ]  
 
Draft Rec. G.lcas     Lucent Technologies Nederland   Q11/15   2001-10-03
Results:19 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-7-25