International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  D 

ITU-T SG15

Optical and other transport networks

Study Period 2001

Results:5 total items.
Delayed Contributions  [ Source: Huawei Technologies Co. ]  [ AI/Question: Q12/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 533 ]  
 
Link-state Pass Through scheme for packet service transport over SDH network     Huawei Technologies Co.   Q12/15, Q11/15, Q9/15   2003-01-06
[ 532 ]  
 
Proposal for routing with congruent time slot constraint in G.7715/Y.1706     Huawei Technologies Co.   Q14/15, Q12/15   2003-01-06
[ 531 ]  
 
Add Flow Control Mechanism on SDH trail     Huawei Technologies Co.   Q12/15   2003-01-06
[ 530 ]  
 
Adding RPR layer to G.etna architecture     Huawei Technologies Co.   Q12/15   2003-01-06
[ 529 ]  
 
XYZ Link Connection Protection:One Additional Requirements for XYZ Layer     Huawei Technologies Co.   Q12/15, Q9/15   2003-01-06
Results:5 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-7-8