International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  D 

ITU-T SG15

Optical and other transport networks

Study Period 2001

Results:17 total items.
Delayed Contributions  [ Source: Huawei ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 746 ]  
 
Supporting LCAS and Virtual Concatenation (VC) in the ASON     Huawei   Q14/15, Q12/15   2003-10-02
[ 745 ]  
 
Requirements for Non-interrupted Interchangeability between PC and SPC/SC in ASON     Huawei   Q14/15, Q12/15   2003-10-02
[ 744 ]  
 
New Function Proposed To G.slet     Huawei   Q14/15, Q4/15   2003-10-02
[ 743 ]  
 
Proposed Method To Do ADSL Port self diagnostic in G.selt     Huawei   Q14/15, Q4/15   2003-10-02
[ 742 ]  
 
Proposal for Routing in MSSPRing     Huawei   Q14/15, Q12/15   2003-10-02
[ 741 ]  
 
Suggest that Q4 setup an new study on the remote and centralized management for xDSL CPEs     Huawei   Q14/15, Q4/15   2003-10-02
[ 731 ]  
 
Coexistence of GFP alternatives at EOT NNI     Huawei   Q12/15, Q11/15   2003-10-01
[ 730 ]  
 
Add QTag process attribute for Ethernet service in G.ethsrv     Huawei   Q12/15   2003-10-01
[ 726 ]  
 
Proposal of maximum DGD value for RZ 10G based applications     Huawei   Q16/15   2003-10-01
[ 725 ]  
 
parameter value specifications for 40-channel NRZ and RZ 10G based DWDM ULH applications on G.65 and G.655     Huawei   Q16/15   2003-10-01
[ 721 ]  
 
LAPS attributes need to be defined in Recommendation G.etnni     Huawei Technologies   Q12/15, Q11/15   2003-10-01
[ 533 ]  
 
Link-state Pass Through scheme for packet service transport over SDH network     Huawei Technologies Co.   Q12/15, Q11/15, Q9/15   2003-01-06
[ 532 ]  
 
Proposal for routing with congruent time slot constraint in G.7715/Y.1706     Huawei Technologies Co.   Q14/15, Q12/15   2003-01-06
[ 531 ]  
 
Add Flow Control Mechanism on SDH trail     Huawei Technologies Co.   Q12/15   2003-01-06
[ 530 ]  
 
Adding RPR layer to G.etna architecture     Huawei Technologies Co.   Q12/15   2003-01-06
[ 529 ]  
 
XYZ Link Connection Protection:One Additional Requirements for XYZ Layer     Huawei Technologies Co.   Q12/15, Q9/15   2003-01-06
[ 365 ]  
 
Proposal of Recs for 10Gbit/s WDM system based on RZ format     Huawei Technologies Co.   Q16/15   2002-04-17
Results:17 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-10-19