International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG16 : Meeting 2001-05-28 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG16  D (2001-05-28) 

ITU-T SG16

Multimedia services, systems and terminals

Study Period 2001

Meeting  from 2001-05-28 to 2001-06-08

held in Brazil [Porto Seguro, Bahia]

Other Meetings : 2004-01-20  2003-05-20  2003-03-28  2002-10-15  2002-02-05  2001-11-16  [ 2001-05-28 ]  2000-11-13 

Results:8 total items.
Delayed Contributions  [ Source: Conexant Systems ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 145 ]  
 
Report on e-mail discussions on Specialized Codec VBR     Conexant Systems   Q9/16   2001-05-16
[ 144 ]  
 
Terms of Reference proposal for VBR     Conexant Systems   Q9/16   2001-05-16
[ 141 ]  
 
Flow Control forn Non-Controlled Links     Conexant Systems   Q11/16   2001-05-16
[ 140 ]  
 
MoIP Connection Examples     Conexant Systems   Q11/16   2001-05-16
[ 139 ]  
 
Selection of Modem Modulation for On-ramp and Off-ramp Connections     Conexant Systems   Q11/16   2001-05-16
[ 138 ]  
 
Early Data Reporting     Conexant Systems   Q13/16   2001-05-16
[ 137 ]  
 
Evaluation of End-to-End error correction performance through an IP network     Conexant Systems   Q11/16   2001-05-16
[ 135 ]  
 
A Method for Early Data     Conexant Systems   Q11/16   2001-05-16
Results:8 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-10-15