International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : NGN GSI : Meeting 2008-05-12 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T NGN GSI  C (2008-05-12) 

ITU-T NGN GSI

NGN Global Standards Initiative

Study Period 2005

Meeting  from 2008-05-12 to 2008-05-23

held in Switzerland [Geneva]

Other Meetings : 2008-09-01  2008-01-14  2007-09-11  2007-04-16  2007-01-08  2006-10-24  2006-07-17  2006-04-22  2006-01-16 

Results:42 total items.
Contributions  [ AI/Question: Q4/13 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1038 ]  
 
Proposed Modification of the Functional Architecture in Y.ngn-account-R2     ETRI   Q4/13, Q2/13   2008-05-04
[ 1015 ]  
 
Proposed Changes in Appendices in Y.mpm     ETRI   Q4/13   2008-05-04
[ 1014 ]  
 
Proposed Changes in the Clause 9 & 10 in Y.mpm     ETRI   Q4/13   2008-05-04
[ 1013 ]  
 
Proposed Changes in the Clause 7 and 8 in Y.mpm     ETRI   Q4/13   2008-05-04
[ 1012 ]  
 
Proposed Changes in the Clause 1, 2, 4, and 5 in Y.mpm     ETRI   Q4/13   2008-05-04
[ 991 ]  
 
Proposed modifications to section 7.7 of Y.enet     ETRI   Q4/13   2008-05-04
[ 989 ]  
 
Proposed modifications of Y.enet for text enhancements     ETRI   Q4/13   2008-05-04
[ 983 ]  
 
Updated version of Y.RACF-CentralMPLS     ETRI   Q4/13   2008-05-04
[ 961 ]  
 
Proposed change to the description of reporting mode     Huawei Technologies Co., Ltd.   Q4/13   2008-05-04
[ 957 ]  
 
Proposal for clarification of resource control scenarios for multicast in appendix VI     Huawei Technologies Co., Ltd.   Q4/13   2008-05-04
[ 956 ]  
 
Proposal for additional text on Resource Admission Control with mobility support     Huawei Technologies Co. Ltd   Q4/13   2008-05-04
[ 955 ]  
 
Proposal for additional text on consideration of home gateway static control mode     Huawei Technologies Co. Ltd   Q4/13   2008-05-04
[ 944 ]  
 
Addition of multicast unicast admission control example for reporting mode     Huawei Technologies Co., Ltd.   Q4/13   2008-05-04
[ 943 ]  
 
A resource control scenario for multicast     Huawei Technologies Co., Ltd.   Q4/13   2008-05-04
[ 935 ]  
 
The Rh' reference point     ZTE Corporation   Q4/13   2008-05-04
[ 934 ]  
 
The Procedure of the Distributed PD-FE Architecture     ZTE Corporation   Q4/13   2008-05-04
[ 933 ]  
 
The Functions of the HPE-FE     ZTE Corporation   Q4/13   2008-05-04
[ 930 ]  
 
Proposed network layer handover procedure for Y.RACF     ZTE Corporation   Q4/13   2008-05-04
[ 928 ]  
 
Proposed impact of security on QoS performance in Y.racf R2     ZTE Corporation   Q15/13, Q4/13   2008-05-04
[ 926 ]  
 
Proposal to move the PD-FE selection mechanism to a right section in Y.RACF (Y.2111)     ZTE Corporation   Q4/13   2008-05-04
[ 923 ]  
 
Proposal to add the clarification in Figure 20 in Y.RACF (Y.2111)     ZTE Corporation   Q4/13   2008-05-04
[ 918 ]  
 
Proposal for adding a mobility support scenario in RACF     ZTE Corporation   Q4/13   2008-05-04
[ 913 ]  
 
Modification the description in Functional Architecture     ZTE Corporation   Q4/13   2008-05-04
[ 910 ]  
 
Issues about the impacts on RACF in Y.MCFArch     ZTE Corporation   Q4/13   2008-05-04
[ 909 ]  
 
Example of implementation of RACF for CPEs     ZTE Corporation   Q4/13   2008-05-05
[ 908 ]  
 
Centralized RACF Architecture in MPLS-TE Core Networks in Outsourcing Mode     ZTE Corporation   Q4/13   2008-05-04
[ 907 ]  
 
Add the resource control procedure     ZTE Corporation   Q4/13   2008-05-04
[ 906 ]  
 
Add charging information over Reference point Rw     ZTE Corporation   Q4/13   2008-05-04
[ 905 ]  
 
Add charging correlation information items to the Nc     ZTE Corporation   Q4/13   2008-05-04
[ 904 ]  
 
Add charging correlation information component to Ru     ZTE Corporation   Q4/13   2008-05-04
[ 903 ]  
 
A new implementation Architecture for controlling MPLS network     ZTE Corporation   Q4/13   2008-05-04
[ 902 ]  
 
Add the Requirement of Charging Policy Decision     ZTE Corporation , China Mobile   Q4/13   2008-05-04
[ 901 ]  
 
Add Charging Trigger Function to the PE-FE     ZTE Corporation   Q4/13   2008-05-04
[ 900 ]  
 
Add Charging Policy Decision Function to the PD-FE     ZTE Corporation , China Mobile   Q4/13   2008-05-05
[ 899 ]  
 
Add charging correlation information components to the Rw     ZTE Corporation   Q4/13   2008-05-04
[ 872 ]  
 
Proposed Changes to Y.RACF-DistribMPLS     AT&T , Verizon   Q4/13   2008-05-04
[ 871 ]  
 
Proposed Changes to Y.RACF-DistribMPLS on BG-FE and PD-FE     ZTE , AT&T   Q4/13   2008-05-04
[ 852 ]  
 
Proposed Revisions in Clause 2 (Scope), 5 (Abbreviations and Acronyms), 8(Management Architecture for Performance Measurement ), and 9(Procedures) for Y.MPM     KDDI Corporation   Q4/13   2008-05-04
[ 849 ]  
 
Proposed Revisions in Clause 11(Reference points) for Y.RACF R2 Version 0.5.0     KDDI Corporation   Q4/13   2008-05-04
[ 848 ]  
 
The inconsistency issue between Y.RACF and draft Q.3308 on Rh interface     Lucent Technologies   Q4/13, Q5/11   2008-05-04
[ 822 ]  
 
Revised draft recommendation Y.enet     Korea (Republic of)   Q4/13   2008-05-02
[ 779 ]  
 
Proposal regarding Outsourcing mode and Designating mode of TRC-FE in RACF-R2     Hitachi, Ltd.   Q4/13   2008-04-29
Results:42 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-9-27