International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG05 : Meeting 2008-02-25 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG05  C (2008-02-25) 

ITU-T SG05

Protection against electromagnetic environment effects

Study Period 2005

Meeting  from 2008-02-25 to 2008-02-29

held in Switzerland [Geneva]

Other Meetings : 2008-11-24  2007-11-19  2007-05-14  2006-09-18  2006-05-22  2005-12-12  2005-06-13  2004-11-08 

Results:5 total items.
Contributions  [ AI/Question: Q6/5 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 66 ]  
 
Suggestion of supplement for the earth resistance measurement method in the part of "Earthing and Bonding" Handbook     Korea (Republic of)   Q6/5   2008-02-14
[ 59 ]  
 
The outline of "The protection guideline of the telecommunication equipment to overvoltage due to lightning"(CIAJ CES-Q007-1)     CIAJ (Japan)   Q6/5, Q4/5   2008-02-14
[ 56 ]  
 
Malfunction cases of the internal port for the optic communication customer premises due to lightning surge     NTT   Q6/5, Q4/5   2008-02-11
[ 53 ]  
 
Proposal for adding the earthing and bonding requirement for metallic strength element and sheath     ZTE Corporation   Q6/5   2008-02-04
[ 52 ]  
 
Proposal for adding supplement explanation for DC-C/DC-I system     ZTE Corporation   Q6/5   2008-02-04
Results:5 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-7-4