International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG09 : Meeting 2005-01-17 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG09  TD (2005-01-17) 

ITU-T SG09

Integrated broadband cable networks and television and sound transmission

Study Period 2005

Meeting  from 2005-01-17 to 2005-01-21

held in Switzerland [Geneva]

Other Meetings : 2009-11-02  2009-02-23  2008-09-19  2008-05-05  2007-10-29  2007-06-14  2006-10-02  2005-10-17  [ 2005-01-17 ] 

Results:15 total items.
Temporary Documents  (GEN)  [ AI/Question: Q9/9 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 98-GEN ]  
 
Draft liaison response to SG 16 on Future collaboration     ITU-T SG 9 Chairman   Q14/9, Q10/9, Q9/9, Q6/9, Q3/9   2005-01-20
[ 97-GEN ]  
 
Draft liaison to ITU-T SG 13 on draft new Recommendation J.rtav - Real-time video and audio transmission system over IP network     Chairman of ITU-T SG 9   Q11/9, Q9/9   2005-01-20
[ 96-GEN ]  
 
Draft Liaison to ITU-T SG 2 on Requirements for preferential telecommunications over IPCablecom networks     SG9 WG 1   Q9/9   2005-01-20
[ 80-GEN ]  
 
Draft liaison to ITU-T SG 11 on SIP usage within IPCablecom     SG 9 WP 1   Q9/9   2005-01-20
[ 78-GEN ]  
 
Draft reply to Liaison concerning NGN studies     SG 9 WG 1   Q9/9   2005-01-20
[ 75-GEN ]  
 
Preliminary draft new Recommendation J.rtav: Real-time video and audio transmission system over IP network (Ref. D03)     Rapporteur Q.11/9   Q11/9, Q9/9   2005-01-19
[ 61-GEN ]  
 
Draft report of WG 1 - IPCablecom     WG 1 Chairman   Q9/9   2005-01-17
[ 54-GEN ]  
 
Draft Liaison Statement to ETSI Technical Committee AT "Access and Terminals" on revision of IPCablecom Recommendations     Rapporteur Q.9/9   Q9/9   2005-01-19
[ 35-GEN ]  
 
Project co-ordination and release planning for NGN     ITU-T SG 13   Q9/9   2005-01-07
[ 34-GEN ]  
 
Proposed new Question on NGN Security     ITU-T SG 13   Q9/9   2005-01-07
[ 23-GEN ]  
 
Report of the 4th FGNGN meeting     FGNGN Chairman   Q9/9   2004-12-10
[ 21-GEN ]  
 
LS to ITU-T SG 9 on future collaboration     ITU-T SG 16 Chairman   Q9/9   2004-12-02
[ 14-GEN ]  
 
Further enhancement of Profile and Package definition     Rap. Q.3/16   Q9/9   2004-10-28
[ 13-GEN ]  
 
Status of work in FGNGN     FGNGN   Q9/9   2004-10-28
[ 8-GEN ]  
 
Study Group activities concerning Security, Telecommunications for Disaster Relief, IP and NGN     ITU-T SG 2   Q9/9   2004-10-28
Results:15 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-7-16